Energy efficiency

What is a thermal break (RPT)?

By the Tu Nuevo Piso teamPublished 16 July 20268 min read

Key points and practical facts about the RPT

  • Quick definition: A technique that interrupts heat conduction in aluminium windows by inserting industrial polyamide insulation.
  • Legal alignment: Meeting the minimum thermal values set by the Technical Building Code (CTE).
  • Dual requirement: It should always be installed together with high-performance Climalit glazing.
  • Lower bills: Cuts the monthly heating use of the home by thirty per cent.

You have probably come across the letters RPT more than once, whether looking at window quotes or planning a full renovation of your home. "Thermal bridge break", the salesperson says, sounding very technical. And they are right to insist on it. In 2026, with demanding building regulations and high heating costs, understanding what a thermal break is will save you time and money.

But let us bring the concept down to earth. You do not need a master's degree in architecture to understand why your old aluminium windows end up "sweating" in winter, or why the outside cold seems to pass through the frames like sheets of cigarette paper. This everyday thermodynamics damages your comfort and your wallet. So come with us, because we are going to take apart what this insulation is, how it actually works, why it has become so compulsory and how to choose well.

What is a thermal bridge, and how does it harm the inside of your home?

To judge a thermal fix properly, you first need to understand where the problem comes from. A thermal bridge works like a motorway for temperature differences. Imagine the outside of your home is freezing on a damp, cold January night, while your living room stays at a comfortable twenty-one degrees Celsius. The building materials that make up a building conduct or resist heat very differently, from one side to the other.

This is where the big disadvantage appears. Standard aluminium is an excellent metal, but it has a problematic side in construction, because it conducts heat remarkably quickly. A standard aluminium profile runs without interruption through the wall from the street into your living room, so heat escapes rapidly while the cold invades the rooms. This drives up your electricity bill and causes unwanted condensation. When the damp air inside the home meets that frozen metal, it turns into droplets that damage the walls and bring in harmful black mould. Even if you fit an external thermal insulation system (SATE) on the façades to protect the outer walls, if you neglect this weak metal point you will cancel out much of its effect.

How the thermal break (RPT) is made and how it works

To tackle this conductivity, engineers developed the thermal break (RPT). It consists of physically cutting the aluminium profile into two parts. In this way, today's profiles have an outer section in direct contact with the street and an inner section sheltered inside your flat. To reassemble these two pieces structurally with complete security, a plastic material with high thermal insulation capacity is pressed in between them.

This insulating spacer is usually polyamide 6.6 reinforced with twenty-five per cent glass fibre. It is a hard compound that withstands strong winds and the weight of double glazing without deforming, yet its thermal conductivity is a thousand times lower than that of aluminium. By placing this barrier in the middle of the profile, the outside cold is fully intercepted, so the metal on the inside stays warm to the touch.

In addition, the very latest advances in the sector in 2026 have substantially refined these plastic strips. They are no longer simple solid bars, but incorporate complex internal structures with multiple micro air chambers that multiply their effectiveness, delivering optimal and guaranteed results.

Problems with keeping old aluminium frames without insulation

Suppose for a moment that you want to cut your total investment and buy standard frames with no thermal break for your flat. Although the materials seem to save you money at first, in the medium term the extra recurring cost and the discomfort at home become a heavy burden. The first unpleasant effect you will notice is the so-called "cold wall effect". Even with the heating turned up high, you will feel a constant, unpleasant icy draught if you stand close to your large windows, because the air at the edges of the windows cools quickly.

The second harmful effect directly affects the healthiness and structural integrity of the property. Constant dripping of condensed water rots the wooden skirting boards around the edges, damages plaster walls, flakes off plastic paint and encourages colonies of fungi that are harmful to the airways. Meanwhile, your heating or your efficient modern aerothermal systems have to work at full power all the time to fight those severe energy leaks. Skipping the thermal break today is a disastrous choice for your health and your wallet.

Aluminium with RPT vs PVC and wood: characteristics

When planning these important upgrades at home, common doubts come up when comparing aluminium with a thermal break against PVC or traditional wooden frames. PVC stands out as a polymer material that naturally offers very low thermal conductivity without needing extra breaks inside it: its profiles with air chambers insulate extremely well. Wood, for its part, gives outstanding aesthetic comfort and good thermal insulation, but it demands thorough upkeep every year, with sanding and protective treatments to stop progressive damage from the sun and the damp of winter.

So aluminium profiles with RPT have become dominant in high-end projects, thanks to their unmatched technical and stylistic qualities. Because aluminium is strong and extremely light, it allows very slim perimeter profiles that let plenty of light into the home, unlike PVC frames, which are inevitably much thicker. In addition, the high mechanical strength of the metal makes it possible to build very large windows and sliding doors with heavy composite glazing that slide very smoothly, without any misalignment or structural cracks.

Key featureAluminium with RPTMulti-chamber PVCTreated wood
Thermal insulationExcellent, depending on the thickness of the polyamideOutstanding, inherent in the natural conductivity of plasticOutstanding, from natural cellular fibres
Dimensional stabilityMaximum strength, recommended for very large sizesMedium strength, needs internal steel reinforcementHigh strength, sensitive to extreme damp
Future maintenanceNone, very basic simple upkeepPractically none, simple periodic cleaningVery demanding, varnishes and protectors needed regularly
AppearanceSlim and fine, wide range of paint finishesLimited slimness, but a variety of current foil finishesAn irreplaceable natural look, but structurally limited
Ecology and recycling100% recyclable an unlimited number of timesRecycling is technically more complexSustainable and renewable if sourced from controlled felling

Legal standards and efficiency gains with insulating frames

In 2026 the law on habitability across the country leaves no room for improvisation. The Technical Building Code (CTE) sets thermal limits so strict that, in practically all urban refurbishments, it effectively rules out fitting cold metal frames without a break. If you plan substantial work on your flat in Barcelona or other Catalan cities, your frames must meet these technical minimums to get the works permits.

Thermal systems also have a direct effect on the real value of the flat. You can significantly improve the rating on your mandatory energy certificate, a clear asset when selling or renting your property quickly and profitably. Likewise, this energy leap is the key requirement for applying successfully for the attractive Next Generation grants in Catalonia, which considerably reduce the total cost of the planned work.

Essential guidelines for a watertight frame installation

Changing joinery needs care so that you do not waste your budget. Investing in a top-quality profile is pointless if the fitting is badly done. The key indicator is the total thermal transmittance of your window (profile plus glass). Always ask for technical data sheets that give this combined value, to check that the frame and the glazing work together in balance.

Likewise, make sure the installation is sealed flawlessly around the perimeter. If the fitter leaves gaps through which air can pass, the benefit of the material is cancelled out. Having a technical architect (arquitecto técnico) oversee these construction stages will help you avoid bigger problems.

Finally, if in future you plan to add efficient technology such as underfloor heating for climate control, a good thermal envelope will prevent excessive electricity costs. Do not hesitate to choose the right builder. It is the ideal way to check the cost per square metre of a full renovation before ordering materials.

Frequently asked questions about thermal breaks

Do all aluminium windows have an RPT?

No, not at all. The cheapest aluminium frames and old low-end profiles lack this lengthwise break of polyamide on their inner face completely, so they feel icy to the touch in the middle of winter.

What material are the separating strips in windows made from?

Almost all of these pieces are made from polyamide 6.6 reinforced with twenty-five per cent glass fibre, because this compound copes well with the expansion of the outer aluminium.

Does the saving on heating pay back the cost of the RPT?

Yes, decisively. It cuts the monthly energy use for heating and cooling the home by up to thirty per cent, so the investment in quality frames is recovered over an estimated five to seven years of use.

Does fitting RPT systems help reduce street noise?

Yes, of course. Physically cutting the metal of the frames and inserting these intermediate plastic materials effectively reduces the direct transmission of annoying urban noise.

Keep reading

✆ Call✦ WhatsAppGet a quote →