Energy efficiency

What is aerothermal heating?

By the Tu Nuevo Piso teamPublished 13 July 20269 min read

Key points of this article

  • Aerothermal heating is an eco-friendly, efficient climate control solution that extracts up to seventy-five per cent of its heat from the outside air to heat your home.
  • It offers major savings of up to seventy per cent on monthly energy use, which means its installation cost can be paid back within five to eight years of use.
  • To get the most out of it, it works best with low-temperature emitters, as you will see when you look at what underfloor heating is and its direct benefits. This keeps the temperature steady without the draughts of conventional split units.
  • If you are planning to equip your home, it makes sense to schedule the installation during a full home renovation, so the building's pipework can be prepared in a coordinated way.

The search for the perfect comfort at home has always been tied to the constant debate about which heating or cooling system is best. Today, in the year two thousand and twenty-six, technology has advanced so much that you no longer have to rely on fossil-fuel boilers or inefficient systems that send electricity bills soaring. If you are thinking about upgrading the heating in your home, you have probably heard of aerothermal heating, a concept that is completely changing domestic climate control.

But what exactly is this technology, and why do experts call it the undisputed solution for a highly efficient, sustainable home? Do not let the technical jargon scare you. In this article we explain its physical principles in a friendly, detailed and entirely practical way. Aerothermal heating is essentially a very advanced heat pump that can provide heat in winter, cooling in summer and hot water continuously. All of this is achieved through a clean, constant thermodynamic cycle.

How does aerothermal heating really work? The simplified physics

To understand how these units work, think about the ordinary fridge in your kitchen. A fridge does not create cold. It absorbs the residual heat from the food inside and expels it into the outside air through the grille at the back. An aerothermal heat pump does exactly the same thing, but in a reversible way and on a much larger scale. The system has a sealed circuit with refrigerant gas that passes constantly through four key stages, controlled by integrated mechanical components.

In the outdoor unit, the outside air warms the refrigerant, which is circulating at extremely low temperature, causing it to evaporate immediately. In the next stage, this vapour is sent to a compressor powered by electricity, which raises its pressure sharply and pushes its temperature up to seventy degrees Celsius in a fraction of a second. The heat is then transferred to the water circuit that supplies your home through an indoor condenser, where the gas cools suddenly so the cycle can repeat continuously.

This cycle is so efficient because the only real electricity you pay your supplier for is what runs the compressor and the internal fans. That means for every kilowatt consumed, the system delivers between four and five kilowatts of free thermal power. It is smart thermodynamics that removes combustion boilers and smoky chimneys from our urban landscape.

Types of aerothermal systems: air-to-air versus air-to-water

When you plan a future renovation of your home, you will need to choose between air-to-air and air-to-water systems. Air-to-air variants work just like traditional air conditioners, heating or cooling the room directly by blowing air through split units mounted on the wall or through ducts hidden in the false ceiling. They are quick and cheap to install, but they cannot produce hot water for your everyday showers.

Air-to-water systems, by contrast, are the favourite of modern interior designers and architects. They use outside energy to heat water that circulates through the internal pipework of your property. These systems come as a monobloc, which puts all the components into a single outdoor unit to save valuable space inside your kitchen, or as a bibloc, which splits the mechanical parts to offer greater operating resilience in cold continental climates with severe frost.

The perfect combination: aerothermal heating and heat emitters

To get the best out of aerothermal heating and see a drastic cut in your electricity bill, the type of heat emitter in your home must be carefully matched. Conventional boilers heat water to nearly eighty degrees Celsius so that aluminium radiators give off heat quickly. By contrast, an aerothermal heat pump performs at its best when working with low-temperature emitters, pushing water at a gentle thirty or thirty-five degrees Celsius to regulate the climate. For this reason, the best thermal partner you can choose is underfloor heating, which spreads heat evenly and upwards across the whole usable floor area, with no annoying draughts.

But if you want to upgrade your flat efficiently, it is best to plan these works carefully. In fact, before starting work on your flat, it is key to know how to organise a full renovation step by step, in the right order of works and phases, so you avoid unnecessary delays in laying the flooring and sealing the pipework properly. If you cannot lift the floors in your home, you can go straight to fitting efficient low-temperature radiators or compact fan coils installed in false ceilings. These give comfortable heat in winter and active, cool air during the hot summer weeks.

Comparison table: traditional systems vs aerothermal heating

To help you see the operational and financial differences between aerothermal heating and the other heating systems available on the renovation market today, we have put together the following technical comparison table, with realistic data on thermal performance, space requirements and approximate maintenance costs for the units:

Heating systemTechnical efficiency COPUpfront investmentPhysical spaceUnit lifespanFinal performance
Air-to-water aerothermalExcellent. COP of between four and five.High. Between eight thousand and sixteen thousand euros.Requires an outdoor unit and an indoor tank.Very long, more than twenty years of daily use.Heating, cold air conditioning and hot water.
Natural gas boilerMedium. COP of zero point ninety-eight.Low. Between two thousand and three thousand five hundred euros.Only needs a small wall-mounted kitchen boiler.Medium, useful for around twelve to fifteen years.Heating and hot water. No cooling.
Electric radiatorsVery low. COP of a constant one.Very low. Between five hundred and one thousand two hundred euros.No technical room or external pipework needed.Very long because of their simple technology.Localised heating only. Does not produce hot water.
Biomass boilerGood. COP of about zero point ninety.Very high. Between seven thousand and thirteen thousand euros.Needs a large space for pellet silos.Medium to high, demands strict cleaning and ash removal.Heating and hot water. No cooling.
Classic air conditioning splitMedium-high. COP of about three.Medium. Between two thousand five hundred and five thousand euros.Needs an outdoor unit and wall units.Medium, around twelve to fifteen years of service.Heating and air conditioning. Does not heat water.

Installation costs, payback periods and the key grants in two thousand and twenty-six

The upfront cost of a complete aerothermal system often alarms homeowners when they receive their first formal quote for renovating their home. However, focusing only on the initial price is a common financial mistake in households. When you replace your old fossil-fuel boiler with an aerothermal heat pump, you are setting up a high-performance clean energy plant in your own home, which will immediately cut your usual electricity and gas consumption.

To speed up the energy transition of homes, public authorities have introduced very valuable direct grants. At regional level, the Next Generation renovation grants in Catalonia provide key support to reduce significantly the net amount that families have to pay for their modernisation works. On top of these direct incentives, there is also an important tax deduction for renovation under the IRPF, and how to claim it, which allows you to deduct up to sixty per cent of the tax cost of the project if you manage to reduce the home's consumption of non-renewable energy in line with the official directives in force today.

With these real tax incentives, an aerothermal installation that would cost twelve thousand euros gross can end up costing the owner around seven thousand euros net. Given the excellent performance of these modern units and an estimated lifespan of more than twenty years, the total cost of your installation will be fully paid back in roughly six to eight years of regular operation.

Essential technical requirements: can it be fitted in any property?

Despite its undeniable sustainability advantages, this heating system cannot be installed without a thorough preliminary analysis of the building's structural conditions. The first essential technical factor is available space, clear and ventilated directly to the outside, for the compressor unit. It needs a constant airflow to work efficiently every day, so that cold air is not recirculated, which would reduce its coefficient of performance or cause premature wear.

On the other hand, any substantial change to the home's comfort heating must comply strictly with the Technical Building Code to avoid serious penalties. We advise you to check what the regulations set out, and what the CTE is, because it sets all the permitted acoustic and thermal limits for installations that alter the shared façades of a block. Likewise, the building envelope of your home plays a crucial role in the performance of the machine. If your flat has continuous heat leaks through faulty windows or serious thermal bridges in the external walls, the heat generated will escape quickly, forcing the machine to run flat out at full power, and your electricity bills will rise every month. So understanding what the energy certificate is for in a renovation and how to improve it is the first smart step in deciding whether you need to insulate the home before choosing the heat pump's capacity.

Pros and cons at a glance

Here are the main strengths and weaknesses to weigh up before making your final decision on climate control for your home, with sound judgement and economic efficiency in mind:

  • Ongoing, permanent savings on the electricity bill in your flat.
  • Maximum safety, thanks to the complete absence of flammable combustion gases.
  • Three comfort services built into a single unified device.
  • Green energy that is fully respectful of the purity of our shared atmosphere.
  • A significantly higher upfront investment compared with traditional gas boiler systems.
  • More indoor space needed because of the large size of the built-in domestic hot water tank.

Frequently asked questions about aerothermal heating

Does aerothermal heating use a lot of electricity in winter?

No. Its consumption is very low, because it draws seventy-five per cent of its energy from the outside air itself and uses mains electricity only to run the compressor. This drastically reduces the final cost of your monthly electricity bill.

Does it need complex annual maintenance to run?

Not at all. It only requires basic preventive cleaning of the air filters and periodic checks of the water pressure by an approved installer.

Additional resources to plan your ideal climate control

To document every detail of your renovation, we suggest reading the following articles and practical services from our professional blog:

  • Discover the close relationship between aerothermal heating and climate control in a renovation to optimise the layout of fan coils in your home as a whole.
  • If you want to see the general overview of costs, visit our main website.
  • Get in touch with the TuNuevoPiso technical team through our contact page to resolve your specific questions about hydraulic performance, energy optimisation and efficient climate control, with no commitment.

Can aerothermal heating provide both heating and air conditioning?

Yes, that is its key strength. Aerothermal heating works with low-temperature radiators or underfloor heating, aerothermal climate control also covers the summer, and aerothermal air conditioning is handled by indoor units connected to the same circuit. One single machine, aerothermal climate control, covers the whole year.

Keep reading

✆ Call✦ WhatsAppGet a quote →