Guides and advice
32 guides on guides and advice.
The technical visit before your renovation quote: what is checked and what to have ready
What the site manager checks in your flat, which papers to bring and which decisions to settle so the quote is a fixed quote and not an estimate.
Guides and adviceDamp patch on the ceiling: what to do with the upstairs neighbour and who pays
What to do in the first hours, how to talk to your neighbour and the insurers, and who is responsible depending on where the water leak starts.
Guides and adviceCracks in walls and ceilings: which ones matter and which don't (partition vs structure)
How to classify a crack by appearance, position and movement, monitor it at home with a method, and know when to call a competent technician.
Guides and adviceAdapting a home for a wheelchair: doors, turning space, kitchen and home automation
Check the whole route through your home, from front door to bed: doors, turning space, floors, kitchen and automation, with working measurements and guide costs.
Guides and adviceRubble and skips in a renovation: real volumes, street permit and price
A 7.5 m² partition wall leaves around 1 m³ of rubble. Here is how to remove it, which permit to confirm with your town hall and what it usually costs per m³.
Guides and adviceWhat to check in a flat before buying it to renovate: a viewing checklist
Seven areas to check on the viewing and the work item each finding triggers, with guide figures, before you sign the deposit contract (arras).
Guides and adviceWorking from home: how to build a real home office into your flat renovation
A home office works if the works include insulation, sockets, a network cable and task lighting. Four possible locations and the typical cost.
Guides and adviceWalk-in wardrobe: how much space it needs and when it fits in your flat
60 cm of wardrobe plus 90 cm of walkway: that gives the 1.50 m width of a single-run walk-in wardrobe and the 2.10 m of a two-run one, and it decides whether it fits.
Guides and adviceTechnical architect fees and works supervision costs
What a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Guides and adviceWhen is the best time of year to renovate your flat?
Find out when to renovate your flat. How spring, summer, autumn and winter affect drying times, prices, builder schedules and works licences.
Guides and adviceRenovation vs new build: what makes sense and when to choose each
Renovation or new build in 2026? We compare costs per m², the CTE building code, taxes and timescales to help you choose the right option.
Guides and adviceRenovations in owners' communities: majorities, quorums and cost sharing
A 2026 guide to quorums, majority votes and how costs are shared for renovations in owners' communities, so you can avoid fines and disputes.
Guides and adviceRenovation grants in Catalonia: ICAEN, housing consortia and IBI relief
2026 guide to renovation grants in Catalonia: ICAEN funding, housing consortium aid and IBI property tax reductions for your flat.
Guides and adviceLow-cost decorating: how to refresh your home without building work
Refresh your home without building work or rubble: adhesive wall and worktop coverings, SPC flooring, paint and lighting, with guide costs for 2026.
Guides and adviceModernising a flat without building work: ideas and costs
How to modernise a flat without building work: floors, walls, bathrooms, kitchens and doors, with realistic price ranges for Spain in 2026.
Guides and adviceUnexpected costs in a renovation: how much to set aside
How much of your budget to keep for surprises in a renovation. The rule of thumb by age of building, the usual hidden faults and how to protect your savings.
Guides and adviceHow to read and compare a renovation quote
A practical guide to reading and comparing full renovation quotes in Spain. Spot measurement tricks, hidden costs and surprise extras before you sign.
Guides and adviceHow to split a renovation budget by trade
How to split a renovation budget across trades, with realistic percentages for licences, demolition, services, joinery and the kitchen, plus a contingency.
Show all 32 guides
Renovation trends 2026: styles, kitchens and bathrooms
Discover the renovation trends for 2026: Japandi and Mediterranean styles, integrated kitchens and spa-style bathrooms for your home.
Guides and adviceThermal and acoustic insulation in a renovation: materials and where to fit them
Plan thermal and acoustic insulation in your renovation. Which materials to choose, where to fit them and how they cut noise and energy bills.
Guides and adviceRestoring hydraulic tile floors in Eixample flats
Expert guide to restoring hydraulic tile floors in grand Eixample buildings in Barcelona: the step-by-step process, common defects and design options.
Guides and adviceDIY renovation or hiring a company? The real risks and savings
Thinking of a DIY renovation in Spain? We compare its real savings with hiring a company: technical risks, 2026 rules and a hybrid option.
Guides and adviceInterior design vs renovation: what each service includes
Choosing between an interior designer and a renovation contractor? A clear guide to what each professional service covers in your home.
Guides and advicePaint, decorate or renovate? How far each option really goes
How far painting, decorating or renovating your flat can take you, with the technical limits, a cost comparison table and practical tips for 2026.
Guides and adviceRenovator, builder or renovation company: which one to choose?
Not sure whether to hire a self-employed renovator, a builder or a renovation company? We compare costs, advantages, risks and legal responsibilities.
Guides and adviceWhat is the Consorci de l'Habitatge? Barcelona housing grants
What the Consorci de l'Habitatge in Barcelona is, what it does, its 2026 renovation grants and how to apply for them successfully.
Guides and adviceWhat is a technical architect (aparejador) and what do they do?
What a technical architect (aparejador) does on site, what they check, when a project legally needs one and how they protect your budget.
Guides and adviceBathroom renovation quote: items, fittings and how to save without losing quality
What a bathroom renovation costs in 2026. A full breakdown of the items and fittings, and how to cut costs without losing quality.
Guides and adviceRenovating a flat vs buying one already renovated in Barcelona: cost and return analysis
Should you buy a flat to renovate or buy one already renovated in Barcelona in 2026? Works costs, transfer tax, licences and practical return tips.
Guides and adviceHow to renovate a small flat (under 50 m²) in Barcelona
Practical strategies for renovating a flat under 50 m² in Barcelona: gaining usable space, multiplying storage and making use of every centimetre.
Guides and adviceTurnkey flat renovation in Barcelona: how it works
A turnkey renovation in Barcelona means one point of contact, a fixed quote and coordinated works from start to finish. Here is how it works, step by step.
Guides and advicePlasterboard or brick partition: which to choose for your renovation
Choosing between plasterboard and brick for new walls? We compare both systems on weight, sound insulation, moisture, price and timing so you can decide on clear criteria.

