Blog category

Bathrooms

7 guides on bathrooms.

Bathrooms

Small bathroom ideas: the building decisions that gain space

Shower instead of bath, a door that does not sweep the room, wall-hung toilets and continuous tiling: what really gains space in 3-4 m².

19 November 2026 · 7 min read
Bathrooms

How a bathroom is renovated step by step: the order of the works

Protection, demolition, drains, electrics, waterproofing, tiling and fittings: the order of the trades and what is tested before anything is covered up.

13 November 2026 · 11 min read
Bathrooms

What is a shower screen? Types and how to choose one

Thinking of renewing your bathroom? What a shower screen is, the main types by opening style, glass and frame, and expert tips on choosing one.

12 July 2026 · 8 min read
Bathrooms

Electrical protection zones in a bathroom: ITC-BT-27 explained

What the electrical protection zones in a bathroom are under ITC-BT-27 of Spain's low-voltage regulations (REBT). Safety volumes, limits and practical tips.

10 July 2026 · 10 min read
Bathrooms

Bathroom waterproofing: materials, CTE rules and common mistakes

How to waterproof a bathroom during a renovation. Materials, the CTE building code rules and the common mistakes that lead to damp and leaks.

10 July 2026 · 10 min read
Bathrooms

Bathroom renovation in Barcelona: complete guide to prices, materials and timescales

Bathroom renovation in Barcelona for 2026: prices by quality level, recommended materials, town hall rules and realistic timescales.

9 July 2026 · 9 min read
Bathrooms

Changing a bath for a shower in Barcelona: cost, timing and ideas

Everything you need to know about swapping a bath for a shower tray in Barcelona: what it costs, how long it takes and which options work best.

28 June 2026 · 6 min read
✆ Call✦ WhatsAppGet a quote →