What is a shower screen? Types and how to choose one
Key points about shower screens:
- Hygiene and space: They are glass or acrylic structures that hold the water in, improve the light in the bathroom and keep out the cold.
- The right opening: Sliding doors take up no extra space, fixed panels are minimalist and cheap, and hinged doors give very wide access.
- Tempered glass: Always choose safety tempered glass of 6 mm or 8 mm, and avoid cheap traditional plastics.
- Anti-limescale treatment: A valuable extra that saves cleaning time and stops limescale ruining the glass.
- A sensible investment: Prioritise sturdy aluminium or stainless steel profiles to avoid leaks and annoying misalignment over time.
At first glance, choosing a shower screen seems the easiest task in the world. You go to an exhibition or browse an online shop, pick the glass that fits the gap you have, pay and that is that. But if you are in the middle of a bathroom renovation in Barcelona, or simply want to update your bathroom so you stop flooding the floor every morning, you will have noticed the market is a real puzzle. A shower screen is not just a piece of tempered glass that stops splashes. It is a key element for the layout of the space, natural light, hygiene and the safety of your home.
The bathroom has stopped being a purely functional corner and has become a personal space for switching off. So choosing the right screen is not an empty aesthetic whim. A poor choice of opening can hit the washbasin, leave a gap too narrow to get in comfortably, or collect so much dirt that you will regret it every time you clean it. So let us answer your questions and look closely at what a shower screen is, which types are on the market and how to pick the right option for your home without losing your mind.
What exactly is a shower screen?
Forget the classic, noisy plastic curtain that stuck to your wet body in the middle of the shower. A shower screen is a physical protective structure, usually made of safety tempered glass panels or acrylic and metal profiles, designed to separate the wet area precisely from the rest of the bathroom. Its obvious job is to keep the water inside the shower tray, so the rest of the room does not flood with dangerous puddles. But beyond that practical use, in terms of modern interior design it does far more for your home. A well-chosen screen adds real acoustic comfort and acts as a genuine thermal barrier, holding the warm steam right where you need it. It is the difference between shivering from draughts in winter and enjoying a warm, private and very relaxing shower every day.
When you renovate a whole bathroom, the shower screen works like an invisible, transparent wall that keeps light flowing through the room. Daylight moves freely from corner to corner, which gives a sense of space that is valuable in bathrooms that are already small. But for this to work safely and avoid headaches, the surroundings have to be ready. Before fitting the final glass, pay proper attention to waterproofing in your bathroom renovation. There is no point buying the most airtight high-end screen if water seeps quietly through damaged joints in the shower tray or the wall tiles. A good screen belongs to a system where watertightness and thermal comfort come first.
Types of screens by opening system
This is where most people start to hesitate. There is no single type that is best for everyone. The right one depends on the exact shape of your bathroom, where the fittings around it are and how much clear width you need to get in comfortably. Let us look in detail at the four main opening systems used in architecture and interior design projects today.
1. Fixed shower panels (walk-in)
This is a single tempered glass panel fixed to the wall, leaving an open, clear entrance. It is the fashionable minimalist design because it has no hinges or bottom profiles, so mechanical wear is close to zero.
- Main advantages: They look very contemporary, are easy to keep clean day to day (there are no awkward crevices where dirt builds up) and are noticeably cheaper than other options.
- Notable drawbacks: They give less thermal insulation, since there is a permanent open gap, and they need long trays so the water does not run out at the front.
2. Sliding screens
The doors slide sideways along top rails on ball bearings. It is the most practical option for showers built in between three walls.
- Main advantages: Excellent watertightness and a 100% saving in space, as the doors overlap inside the track without taking up room in the bathroom outside.
- Notable drawbacks: The bottom profiles collect limescale and soap residue. Worn bearings will also need replacing over the years.
3. Hinged screens
These open by pivoting on very discreet hinges fixed to the wall. They offer the most comfortable entrance of all.
- Main advantages: A very wide and safe entrance for the whole family, as there are no profiles at floor level.
- Notable drawbacks: They take up a lot of swing space outside. When you open a wet door, water drips straight onto the bathroom floor.
4. Folding screens
The doors fold inwards like a concertina. They are ideal for compact shower trays.
- Main advantages: They clear almost the whole entrance without taking up room outside, making areas accessible that would otherwise be impractical.
- Notable drawbacks: They have many seals and hinges, which makes cleaning harder and raises the risk of drips if they wear out.
The heart of the screen: tempered glass or acrylic
Once the mechanical system is decided, the material needs discussing. In the past, plastic screens in acrylic with raindrop patterns were very common, because they hid limescale. Today, though, the undisputed choice in any home renovation is safety tempered glass.
The glass thickness directly determines the structural rigidity of the screen. Fixed shower panels, which are usually held at only a few points, should be at least 8 mm thick for solid stability and to avoid annoying flexing when you touch them. For sliding, folding or hinged doors, 6 mm glass is used, mainly to reduce the weight the bearings and guides have to carry. For family safety, tempered glass goes through heat treatment so that if it breaks from an extreme accidental impact, it shatters into tiny granules with no sharp edges. Do not confuse it with other types such as Climalit glass. That is excellent for exterior windows thanks to its insulating double glazing, but its weight and construction make it completely unsuitable for hanging in a shower.
As for the outer frame, the material affects both how long the unit lasts against constant damp and how well it matches your taps. Anodised aluminium leads the market for lightness and price. For premium finishes, stainless steel is growing fast, because it does not rust and is extremely durable. For decorative finishes, polished chrome remains a timeless classic, while matt black and brushed gold lacquers set the pace in the most exclusive interiors at the moment. Profile engineering has also come a long way, with guides that include magnetic soft-close damping. This much-requested feature stops the bang when doors are slammed shut and softens the traditional metallic noise. You get a silent glide that adds a touch of hotel luxury and protects the glass from cracks.
Key points when planning your bathroom renovation
When you decide to switch a bath for a shower in Barcelona or in any town in Catalonia, planning the screen in advance is crucial to avoid last-minute cosmetic patch-ups. A common and serious mistake of many inexperienced builders is tiling the walls without checking whether they are plumb. If the walls the screen will be fixed to lean even slightly (which is typical in older homes), you will need very wide compensating profiles so the doors can close airtight without forcing the hinges. Likewise, check carefully that the fall of the shower tray or floor is right. If the fall is insufficient, the water will look for a way out under the screen seals and overflow your smart new bathroom.
Apart from that, the technical choice of your screen affects the cost of the project. If you are working out the numbers for your home, check the screen item in your bathroom renovation budget carefully before signing anything. Do not fall into the habit of spending all your money on luxury tiles and then saving on a low-end screen of doubtful watertightness. A cheap screen with poor plastic bearings will squeak after a few months of use, letting unpleasant puddles form and spoiling the comfort you expected from your renovated bathroom.
Do not forget electrical safety either. Positioning the screen at the right point can help you comply easily with the electrical protection zone in bathrooms, avoiding switches, wiring or fan heaters in areas that could get directly wet or fill with excess steam, which the electrical regulations prohibit.
Comparison of shower screen types
To see quickly which solution fits your routine, look at this comparison of systems. On the Tu Nuevo Piso site, we analyse each layout to suggest the right screen.
| Opening | Space | Watertightness | Cleaning | Recommendation |
|---|---|---|---|---|
| Fixed panel | None | Medium | Simple | Modern, spacious bathrooms. |
| Sliding | Minimal | Excellent | Medium | Small, compact bathrooms. |
| Hinged | Medium | High | Very easy | Large, accessible bathrooms. |
| Folding | Very low | Medium | Complicated | Small corner showers. |
| Semicircular | Reduced | High | Medium | Angled corner trays. |
Frequently asked questions about shower screens
Which glass is safest for a shower?
Safety tempered glass six or eight millimetres thick is the safest option, because it has high resistance to heat and mechanical impact. Also, if it breaks from an extreme blow, it shatters into small, rounded pieces that do not cause serious injuries.
Can you drill into the shower tray to fit the screen?
No, under no circumstances should you drill the shower tray to fix the bottom profile, as you would break the waterproofing layer and cause serious leaks or damp in your floor. The bottom profile is fixed with elastomer adhesives or high-adhesion neutral silicone, which give a perfect seal without drilling.
How long does the factory anti-limescale treatment last?
It depends on the hardness of your water and the daily preventive maintenance you do at home, but it usually keeps its optimal properties for between five and ten years. After that, if you notice water starting to leave marks again, you can renew the protective film easily with specific liquid kits that are simple to apply at home.
How can you prevent water escaping outside?
To keep the seal intact, check the clear silicone drip seals every year and replace them straight away if they look stiff or show black mould. It is also important to ventilate the bathroom well after use to preserve the external elastic seals. Finally, the bottom silicone seal of the screen must be applied to the outer face of the profiles, so that any water that builds up always drains back into the shower tray.
Keep reading
Electrical protection zones in a bathroom: ITC-BT-27 explained
What the electrical protection zones in a bathroom are under ITC-BT-27 of Spain's low-voltage regulations (REBT). Safety volumes, limits and practical tips.
BathroomsBathroom waterproofing: materials, CTE rules and common mistakes
How to waterproof a bathroom during a renovation. Materials, the CTE building code rules and the common mistakes that lead to damp and leaks.
BathroomsBathroom renovation in Barcelona: complete guide to prices, materials and timescales
Bathroom renovation in Barcelona for 2026: prices by quality level, recommended materials, town hall rules and realistic timescales.

