Guides and advice

How to split a renovation budget by trade

By the Tu Nuevo Piso teamPublished 23 July 20268 min read

Key points to keep your spending under control:

  • What is behind the walls drives the cost: Plumbing, electrics and building work together can absorb close to 40% of the total budget.
  • The kitchen is a big item: Units and appliances typically take 15% to 20% of the total.
  • Keep a buffer: Setting aside a safety margin of 10% to 15% is essential.
  • Compare quotes: Learning how to read and compare a renovation quote helps you avoid costly traps.

Renovating a flat is one of the most intense financial projects you will ever take on. It does not matter whether it is an inherited flat or a second-hand purchase that badly needs a deep refresh. The biggest mistake people make is asking for quotes before they know what each item really costs. The money disappears fast: demolition, rubble sacks, copper pipe and tiles.

So before you start dreaming about freestanding baths or kitchens with islands, you need a solid plan for splitting the costs. In this article we break down, using realistic 2026 figures, how to spread every euro. We give you practical percentages that hold up in the day-to-day reality of a real job site.

Why most people get their numbers wrong

Naive optimism, or a lack of realistic planning, is the worst enemy of any home renovation. Many families add up the cost of the showroom materials and assume labour will be a minor item. Nothing could be further from the truth. The cost of skilled tradespeople has risen considerably, and waste fees, licences and surprises behind the walls throw off badly calculated estimates.

Another problem is bad priorities. Splurging on an expensive floor while cutting the budget for rewiring thirty-year-old cables is robbing Peter to pay Paul. It helps to understand which part of a renovation is the most expensive so you can set the budget properly. The real secret is balancing the aesthetic and the structural.

The ideal split of a renovation budget (in percentages)

To organise your money sensibly, we divide the investment into several items. These percentages are a common starting point and work well as a template.

To make your research easier, see an example and breakdown of a full renovation quote, which is handy for building your own spreadsheet. This is the reference split:

Budget itemShare of the budget (%)What it mainly includes
Licences, plans and fees4% - 8%Architectural project, professional college sign-off (visado), municipal works fees and landfill charges.
Demolition and waste removal6% - 10%Removing partitions, taking out sanitaryware, dismantling old joinery and clearing rubble by hand.
Services and climate control18% - 22%Halogen-free cabling, multilayer plumbing, heating and efficient climate control.
Building work and partitions15% - 20%Levelling floors (screeds), gypsum plaster, ceramic flooring and plasterboard false ceilings.
Exterior and interior joinery12% - 16%Windows with thermal breaks, lacquered internal doors and built-in wardrobes.
Kitchen units and worktop10% - 15%Wall and base units, a quartz or porcelain worktop and kitchen taps.
Finishes, wall coverings and paint6% - 10%Washable paint, flooring in secondary rooms and basic bathroom fittings.

The invisible foundations: licences, demolition and services

Many people ignore the cost of permits and paperwork. The town hall does not overlook them. The building works tax (ICIO) and technical management fees take a good bite out of the budget. You can see this clearly when you work out how much it costs to renovate a flat in Barcelona: prices per m² and items, where the rules for historic areas push project costs up considerably.

Turning to the practical side, the dust and noise start inevitably with demolition. The real cost of clearing out all the old sanitaryware, tiles and partitions, bagging it properly and taking it to an authorised waste site is not just a lot of effort and sweat. It also means paying the mandatory waste management charges on time. Do not be tempted to save money by sneaking rubble into ordinary bins. The heavy municipal fines you risk would cost you far more than you saved.

Then we come to the services. A flat with outdated plumbing or ageing electrical circuits will give you endless headaches the moment you install modern, high-power appliances. Replacing the whole drainage system and redoing the supply with multilayer pipes instead of the old copper ones easily takes more than a fifth of your budget. The money here is hidden inside the walls, but it is the only guarantee that your home will be liveable for decades.

Building work versus joinery: where comfort costs

Traditional building work and modern partitions

Once the complicated technical guts of the home are sorted and cleaned up, the exciting part comes: giving real shape to the new living spaces. Skilled building work is the base on which this whole phase rests. It runs from solid screeds on the floor to the precise construction of the main walls that will carry the tiling to come. This is exactly where plasterboard has clearly overtaken traditional brick, for its speed, cleanliness, very light weight and sound insulation.

External joinery: windows and fittings

Joinery, on the other hand, often makes people nervous about the cost, so it is worth knowing what joinery covers. Replacing old windows with modern insulated PVC or aluminium frames is a significant investment. It is not a cosmetic expense: it pays for itself over the medium term through big savings on heating and air conditioning. The same goes for solid doors, which insulate very well.

And what about the kitchen and bathroom?

If there are two rooms in the whole home that can swallow an entire budget with alarming speed, they are without doubt the bathroom and the kitchen. The modern kitchen has become the centre of family life, which is why it pays to choose durable, top-quality finishes such as continuous surfaces or porcelain worktops that stand up to years of heavy use. On top of these fixed costs you need to add energy-efficient class A appliances. By the end of the job, the kitchen typically accounts for between 12% and 15% of the total investment.

The bathroom looks secondary because it is small, but it is deceptive. So many trades crowd into barely four square metres. A plumber, an electrician, a tiler and a painter work one after another in a tiny space, which stretches the timetable and pushes up labour costs. Ultra-flat resin shower trays, thermostatic taps and screens are fixed costs that make the bathroom cost more than its size suggests.

The safety cushion you cannot skip

Let us be completely honest. No full renovation escapes surprises or unavoidable changes of mind along the way. When you knock down a partition you may find hidden damp or come across a shared drainage stack that was not on the original plans, which calls for remedial work straight away.

To stop these surprises from leaving the job stalled for lack of cash, it is essential not to spend your entire budget when you award the contract. The expert advice is to hold back an appropriate safety percentage. Read up on contingencies in a renovation: what percentage to set aside and why before you pick up the hammer. We recommend setting aside a minimum of 10% as a financial buffer on recent buildings, rising to 15% in older period buildings (fincas regias).

Practical planning: how to keep to budget

The final key to stopping your renovation budget from spiralling lies in the early stage of document review and technical planning. A poorly planned renovation drifts by about 25% on the original estimate on average. That is a serious financial hit that can wreck family peace of mind.

The best way to protect your numbers is to follow a clear method:

  • Define the interior design before you start: You need final electrical and plumbing plans before the clock starts ticking on site, so there are no last-minute improvised changes.
  • Fixed-price quotes with exact measurements: Understand how to organise a full renovation step by step and ask for line items that are described in detail and agreed in writing, so there are no surprises.
  • One main contractor rather than separate trades: Coordinating each trade individually tends to lengthen the timescale and raise the final cost, because working days are lost when workers from different trades get in each other's way.

Frequently asked questions about renovation budgets

Which item usually makes a full renovation most expensive?

Overall, the most expensive item is usually plumbing, electrics and climate control, followed by exterior joinery and building work. If you want to plan the build sensibly and make your money go further, see the full breakdown in the order in which a renovation is done. It gives you useful technical context for scheduling when each trade starts.

Can I save money by buying the materials myself?

It is not recommended. Contractors get trade discounts from manufacturers that a private client will never get in a shop. Also, if you buy the materials yourself and they turn out to be faulty or cause problems during installation, the fitter will charge you for the extra waiting time, and you lose the official warranty that covers the technical work.

How does the choice of climate control affect the overall cost?

A great deal. Choosing modern systems such as aerothermal heating raises the initial cost of the services item by roughly 15% to 20% compared with conventional gas radiators. That said, the investment pays off over time, because energy use falls sharply, which adds real value to the property for any future valuation or sale.

How much should I pay the builder up front?

Never pay more than 15% to 25% of the agreed total up front to cover materials and initial demolition. Further payments should be structured strictly through regular fortnightly stage payments, paying only for work that has been carried out and approved by you or by the competent technical management of the works.

Is it possible to renovate in phases to reduce upfront costs?

Yes, it is possible, but it is essential to do everything involving water, electricity, drainage and any building work that requires breaking up floors in the first phase. Later phases can focus on replacing internal doors, furnishing secondary rooms or painting, which do not create much dust or cut off essential services for daily life.