Full renovation quote: worked example and item-by-item breakdown

By the Tu Nuevo Piso teamPublished 24 July 202610 min read

Indicative prices · VAT not included. Not a binding offer.

What items does a full renovation quote include, and how is it broken down?

A serious full renovation quote is broken down item by item, each with its price, rather than given as a round figure on a single sheet. In the example of an 80 m² flat with a partial redistribution, the items are demolition, brickwork and plasterboard, plumbing, electrics, flooring, joinery, kitchen and bathroom, and painting. It is also wise to set aside 10% to 15% for unexpected costs.

Let's be realistic: taking on a full renovation is a bit like skydiving without knowing whether your backpack holds a spare parachute or a bag of potatoes. The fear of being ripped off, of the final figure doubling without warning or of the works never ending is all too common. So when a builder hands you a single sheet with a round number such as "General renovation: 45,000 €", your smile freezes. A serious quote is never a round figure that falls from the sky. It should be a transparent document, almost a travel log, where every partition, cable or coat of paint has its own unit price and technical breakdown. For non-experts, though, making sense of all these items is as hard as reading ancient Sanskrit. In this article we go through a quote line by line, examining each item closely, so you know exactly where your money goes and how to protect it. Pull up a chair and get your calculator ready.

Practical summary for your home renovation:
  • A detailed breakdown is essential: Be wary of single, unreadable sheets that group several rooms under one overall price.
  • Keep a contingency fund (recommended): Set aside 10% to 15% of the quote amount to cover unexpected problems on site.
  • Understand your quote: Early on, learn how to read and compare a renovation quote carefully, so you can spot exclusions and unfair extras.

Why an item-by-item breakdown matters

Imagine you buy a car and the salesman says the price includes "four wheels, a steering wheel and an engine". Would you pay without knowing whether the engine is diesel or electric, or whether the seats are leather or thin faux leather? Your home is the same, except that a mistake can put your savings at risk for years. A detailed breakdown is your only defence when it comes to controlling the costs of your renovation. By separating each piece of work into its own item, the builder lets you choose. That flexibility matters when family money is limited and tight. If you find the ceramic flooring is beyond your means, you can ask to switch to a mid-range floor without changing the rest of the job. But if the quote is a lump sum with no breakdown, you are tied hand and foot. It is also important to understand the difference between a fixed quote and an open quote. A fixed quote sets the price of each agreed item in writing; if new items appear during the works that raise the planned cost, the Catalan Consumer Agency says the company must tell you so that you can decide whether to accept the change to the original quote.

A worked example for an 80 m² flat

To put this into figures, we will look at a hypothetical case for 2026. Take a flat with a usable area of about 80 square metres in an urban area. A classic home like this has three bedrooms, a hallway, a generous living room, a separate kitchen, a bathroom and a guest toilet. For this job we plan a full renovation with partial re-layout (knocking down partitions in the hall to gain natural light), replacement of all the service pipes and wiring, and complete finishes. The final cost will vary with the brands you choose and the city you live in, but this breakdown is a useful model for checking the essential items in your own project. It is also worth looking at the right order of work in a full renovation, so you understand when each trade comes on site and can spot duplicate or unclear invoices.

Step-by-step breakdown of the main building items

A large job has to be divided into sections or items. The most important ones are below:

  • Demolition and technical clean-up: This covers removing old furniture and sanitaryware, taking out old aluminium windows, chiselling off existing tiles and manually demolishing partitions. What drives the cost of this item is not the labour of breaking things apart but the waste handling: certified rubble bags, the municipal fee for occupying the public road, official skips and the eco-charges that landfill sites charge to recycle this material. This clean process is the essential base of any modern building.
  • Fine masonry and interior partitions: This gives shape to your new flat. It includes building new dividing walls in plasterboard with high-density rock wool insulation, fixed false ceilings to hide the pipework for air conditioning and LED lighting, repairing damaged plaster, and a self-levelling mortar screed on the floors so your furniture does not sit at an angle. Badly built masonry will spoil any finish, however expensive.
  • Critical services renovation: This is the technical heart of your home. In older flats, it is worth reviewing and, if needed, renewing the electrical installation so that it meets the low-voltage regulations (REBT), including a new main fuse board. It is also worth considering replacing the plumbing across the whole home, especially if it is lead or iron, with copper or multilayer cross-linked polyethylene.
  • External and internal joinery: Supply of aluminium or PVC windows with thermal breaks and efficient double glazing, which keep out the cold and block noise well. Inside, it covers the internal doors (satin white lacquer for easy cleaning), steel handles, and the fronts and interiors of built-in wardrobes made to measure. Good thermal joinery noticeably reduces annual heating costs.
  • Kitchen, bathrooms and finishing touches: Installing kitchen units with soft-close hinges, sanitaryware, modern wall-hung basins, anti-slip mineral-resin shower trays, efficient taps and toughened glass shower screens. Everything is finished with the wall paint and a last round of touch-ups on site.

Estimated full renovation costs by item (2026)

The table below shows the cost of each section in a standard 80 m² flat with mid-to-upper-range finishes, along with the percentage split of costs in a typical full renovation:

ItemApprox. cost (2026)% of totalWhat it includes
Demolition and rubble3,200 €7%Removing old furniture and sanitaryware, stripping partitions, bagging rubble and landfill charges included.
Masonry and plasterboard9,500 €19%Plasterboard partitions with rock wool insulation inside, false ceilings and smooth levelling of worn walls.
Plumbing and gas4,800 €10%Replacing old asbestos downpipes with copper and multilayer cross-linked polyethylene pipe.
Electrics and telecoms5,300 €11%Chasing, halogen-free cabling to REBT standards, 65 switches and sockets, main fuse board and the official electrical certificate (CIE).
Flooring and tiling6,200 €13%AC5 laminate flooring of European origin, a set of satin-white skirting boards and fine tiling in the bathrooms.
External joinery5,800 €12%Five casement windows in aluminium or PVC with thermal breaks and low-emissivity toughened glass.
Internal joinery3,400 €7%Six solid-wood internal doors in satin lacquer, with hinges and soft-close magnetic seals.
Kitchen and bathroom fittings8,500 €17%Units with soft-close hinges, quartz or porcelain worktop, sanitaryware, anti-slip mineral-resin shower tray and efficient taps.
General emulsion paint2,100 €4%Wall preparation, sealing primer, repair skim and two coats of washable white emulsion paint.

The percentages are calculated on the sum of the nine items and rounded to whole numbers, so they add up to 100%.

Strategies and expert tips to avoid unexpected costs

Let's talk about money plainly. When comparing quotes from different firms, it is very easy to fall into the trap of signing the cheapest figure. In this trade, however, an excessive discount is a direct route to disaster. A common tactic is to leave out basic items on purpose, then add fake "extras" that become unavoidable once all the partitions are down. To avoid this kind of squeeze, it is wise to set aside a contingency for renovation surprises in advance. It makes sense to put aside 10% to 15% of the quote amount and keep it in a separate account. Another key decision is whether to hire a renovation company or a self-employed builder. With a legally registered firm you get a site manager who coordinates all the trades, and insurance against common accidents on site. Do also consider applying the reduced 10% VAT rate to renovation works, which can save a considerable sum legally if the requirements of the VAT Act are met (a private individual or owners' community as client, a home whose construction or rehabilitation was completed at least two years before the works, and materials supplied not above 40% of the taxable base; the linked guide also covers the change planned from 1 December 2026).

Useful resources and further reading for your renovation

Planning a full renovation takes careful technical groundwork. We invite you to read these guides for more on the subject, starting with our detailed 2026 guide to full renovations. If your project is in Catalonia, see the local grants for renovations in Catalonia that are currently open, or the detailed prices for renovating in Barcelona to estimate your costs accurately.

Frequently asked questions about full renovation quotes (FAQ)

Do I need an architect's project and a technical architect (arquitecto técnico) for a full renovation?

It depends on how big the changes are. If the full renovation changes the layout of internal partitions without touching the structure, you only need a minor works licence or a prior works notification. However, if you are going to knock down an old load-bearing wall, open a new hole in the façade or alter any structural element, you must submit an execution project signed by an architect and have a registered technical architect supervise the works. Professional college approval (visado) is compulsory only for the execution project and the final works certificate, and only for works that require a project under article 2.2 of Law 38/1999 on building regulation (Royal Decree 1000/2010, art. 2).

What is the real difference between a fixed quote and an open quote for works?

A fixed quote is a contract document that details every item and sets an exact, unchangeable price for labour and materials before the works start. In this model, the builder takes the risk of any calculation error or unexpected change in wholesale prices. An open quote, billed on time and materials, means the price is worked out from the hours the workers put in and the materials actually used as the job goes on. This makes the final price less predictable for an ordinary household, because it depends on the hours worked and the materials actually used.

What share of a full renovation budget do the kitchen and bathrooms take?

The kitchen and bathrooms are the most complex rooms to renovate in the home. That is because most of the most technically demanding work is concentrated there: sanitary plumbing, high-power electrics, ceramic stoneware tiling and a lot of mid-range fittings. Together, the kitchen and bathrooms usually take between 30% and 40% of the total cost of a full flat renovation, so it is worth choosing materials for these rooms carefully if your budget is tight.

How can I be sure the materials quoted are the ones actually installed?

The only real guarantee is to ask the builder to list the brands, catalogue references and exact model of each product in the quote (for example, Porcelanosa tile model X, Grohe tap model Y, AC5 Quick-Step floating laminate). During the works you have every right to ask for the technical data sheets and the supplier's delivery notes before the materials are fitted in your home. A professional technical architect who visits the site regularly for quality checks will also give you confidence that they are not fitting low-grade materials at premium prices.

And to close this look inside your quote, remember this: personal trust is a fine thing, but a written contract, signed and dated, is what protects you. Never agree to verbal changes noted down in a hurry. The right professional is the one who takes the time to explain why every euro in the detailed quote is there. So lay out your plans, ask for three quotes built on the same basic template, and say goodbye to improvised works. That way your wallet, your peace of mind and your bank balance will thank you on the day you celebrate moving into your dream home.

Do you give me an itemised quote in writing before the renovation starts?

Yes. After the technical visit we give you a fixed quote in writing, broken down item by item. The visit is free and without obligation, and it takes place before we quote. The duration of the works is also set in writing in the quote, so you know what each item includes and when we will finish.