Installations

Home electrical installation: full guide to the board, circuits, certificate and rules

By the Tu Nuevo Piso teamPublished 7 July 202615 min read

Indicative prices · VAT not included. Not a binding offer.

When you think about renovating your home, your mind usually goes straight to finish catalogues, open-plan kitchens or modern designer tiles. But the technical reality is that there is a hidden, silent and absolutely essential network bringing everything to life: the home's electrical installation. If the walls are the skeleton of a building, the electrical system is its central nervous system, safely powering every corner of your daily routine.

Our homes today place far greater demands on electricity than they did only a couple of decades ago. We no longer just switch on a few filament lamps and run a basic fridge. We now live with powerful induction hobs, high-consumption pyrolytic ovens, advanced washing machines, aerothermal heating and climate control, and an electric car charging point. This growth in power demand has pushed safety regulations to tighten considerably to prevent serious faults.

If you think about it logically, ignoring what happens behind your walls can cause enormous headaches. If you are planning a major change, a deep renovation, or simply want to check whether your current flat is still safe for your family, you are in the right place. In this detailed practical guide, we look closely at each part of a residential electrical network, from the protection board to the paperwork that grid operators require in Spain.

Crucial points before you start your project:
  • Technical evolution of the board: The old fuse-based board is a thing of the past. Today it is a complex safety system that combines advanced residual-current devices against leaks, protection against short circuits and active protection against voltage surges that damage your appliances.
  • Essential legal sign-off: Every substantial renovation of your network must be certified by qualified professionals under the national regulations, to avoid supply interruptions or failed inspections with your local electricity distributor.
  • Coordination in your renovation: If you are thinking of a deep renovation of your home, it is strongly advisable to study the steps of a full home renovation in detail. That way you can align the electrical chasing plan with the plumbing and general partition work.
  • Older buildings in Catalonia: A well-structured design of loads and installations is essential if you are going ahead with full renovations in Barcelona, where the age of residential blocks often hides old wiring that does not meet the law.

The distribution board: heart and safeguard of the home

The main electrical distribution board, known technically in the trade as the General Control and Protection Panel (CGMP), is the plastic or metal box, usually recessed near the front door, where the main cable from the street meter meets the separate branches that carry power to each room. Its job is not limited to letting you switch the main supply on or off. Its real purpose is to protect the home and its occupants around the clock against electric shocks and accidental fires.

So what are the real components that determine the safety of this system? When you open the front cover of the board, you will find a row of devices neatly mounted on a rail. The first of these, at the head of the distribution, is the main automatic switch (IGA). Its job is to act as a guardian of the maximum power for the whole installation. If you draw more power than the system is rated for, or a serious short circuit occurs in the network, the IGA cuts all power immediately to protect the wiring against overheating and possible fires. This device must have all-pole disconnection, switching off the live and neutral at the same time, with ratings typically of 25 A or 40 A.

Next to the IGA, current technical regulations for 2026 require a surge protector (PCS) to be fitted. This device automatically neutralises sudden voltage spikes on the public network (usually caused by thunderstorms or faults in external transformers), diverting them to the building's main earth in a fraction of a second, so your television, your work computer or the controls of your air conditioning are not damaged.

Right next to it is the residual-current device (ID), without question the biggest technical lifesaver in the home. The RCD continuously checks that all the current flowing out through the live conductor returns in full through the neutral. If it detects a small difference or leak of more than 30 milliamps, it assumes electricity is escaping through damaged insulation or through direct contact with a person, and trips to cut the supply in less than 50 milliseconds. At this point, the 2026 update of the REBT has ruled out the old AC-type RCDs entirely, as they are ineffective against the pulsating rectified currents from modern induction hobs, inverter washing machines or laptop chargers. Smart RCDs of type A or higher are now mandatory.

Finally, at the bottom of the row of switches, you find the miniature circuit breakers (PIA), generally known as magnetothermal switches. Each one protects a separate circuit in the home, such as the ceiling lights, the ordinary sockets in the living room or the ceramic hob, limiting dangerous heating in each circuit according to the thickness of the cable it protects. If a toaster fails in the kitchen, only its own breaker trips, so the whole home is not left in the dark.

If you live in an older flat that still has the classic screw-in fuses or lacks separate protection for each area, upgrading this part should be your top safety priority. To find out what each breaker does and whether your installation is outdated or needs a complete replacement, you can read our article on the distribution board in a home.

Electrical circuits: ITC-BT-25

To make sure you do not suffer annoying overloads from plugging in too many appliances at once, the regulations require homes to split their sockets into separate power branches or circuits. This stops the whole home from sharing a single main conductor and overloading the wiring within the walls. Depending on the home's needs, there are two clearly defined electrification levels:

Basic electrification level (up to 5,750 W)

This power level is intended for smaller homes with reasonable general consumption that do not need powerful heating or a general electric heat pump. This level requires the home to be structured into five basic circuits, each controlled by its own miniature circuit breaker:

  • Circuit C1 (general and lighting): Supplies only the ceiling light points and the fixed recessed lamps in the rooms. It uses copper conductors with a cross-section of 1.5 mm² and is protected by a dedicated 10 A breaker.
  • Circuit C2 (general-use sockets and fridge): Serves all the ordinary sockets spread through the bedrooms, living room and hallways, as well as the fridge and the kitchen extractor. Its official wiring requires a minimum copper cross-section of 2.5 mm², with a thermomagnetic breaker rated at 16 A.
  • Circuit C3 (cooker and oven): This special circuit feeds the induction hob and the oven. Because these heating elements draw a heavy load, the regulations require thick copper cables of 6 mm², protected by a breaker rated at 25 A.
  • Circuit C4 (washing machine, dishwasher and electric water heater): In theory this is for these three appliances with heating elements. In current renovation practice, however, we usually split C4 into three separate auxiliary lines, each with 2.5 mm² cable and an independent 16 A breaker, for safety and for the owner's convenience.
  • Circuit C5 (kitchen and auxiliary bathroom sockets): This line supplies small temporary appliances on the kitchen worktop (microwaves, capsule coffee machines or toasters) or hair dryers in the bathrooms. Official conductors must be 2.5 mm² and protected by a 16 A breaker.

High electrification level (power above 5,750 W)

Conversely, when the flat's needs exceed the basic power supply, you must move to the high electrification level, which is typically designed for a maximum admissible power of around 9,200 W. This level is essential if the usable floor area of the home is over 160 square metres. It is also required by technical design if you plan general air conditioning with ducted systems, aerothermal boilers, a separate tumble dryer, or if the kitchen far exceeds the standard number of sockets.

In this case, the main board must include additional circuits identified as C6 (duplicating the basic lighting lines), C7 (additional general sockets), C8 (fixed heating through electric radiators), C9 (air conditioning and separate heat pumps), C10 (a dedicated 16 A tumble dryer), C11 (lines for home automation and smart control of blinds and lighting) and C12 (additional sockets for kitchen appliances). In addition, the 2026 regulations impose a mandatory consideration in line with the move towards urban sustainability: a dedicated circuit C13 solely for smart home charging of hybrid or electric vehicles, under ITC-BT-52.

Current rules in Spain: the REBT and its ITCs

Carrying out any electrical renovation correctly requires full respect for national legislation. Otherwise the installation will be unsafe and illegal. In Spain, the overarching framework that governs these installations is the Low-Voltage Electrotechnical Regulation (REBT), established under Royal Decree 842/2002. Far from being an outdated or rigid document, it is regularly updated with binding improvements through its Complementary Technical Instructions (ITC-BT).

In the first months of 2026, the adaptation of these rules has strengthened an already very protective framework, driven by the rapid integration of domestic photovoltaic energy on DC circuits (with its new ITC-BT-53), smart vehicle chargers and efficient home automation systems, all of which need stable and reliable networks in every home in the country. Working outside this code not only puts your family seriously at risk through possible faults, but also makes it impossible for electricity suppliers to register a new supply contract or increase the contracted power of your home.

For this reason, it is essential that you understand in detail the design procedures set out in the current REBT and ITC-BT regulations. Only then can you be sure that the electrician on your job respects the mandatory distances when cutting chases into the partitions and runs the standard copper cross-sections required.

According to the regulations, all the insulated conductors in the home must be run concealed, always inside flexible corrugated tubes of certified flame-retardant plastic. The outer diameter of these protective tubes is calculated to leave a considerable amount of free space inside (around a third of their volume). This makes it easier for future electricians to pull out a worn cable or thread additional wires without having to break or demolish the plaster in the room.

The legal paperwork: the electrical certificate (CIE) and the General Protection Box (CGP)

Once all the physical connections are finished and the plaster in the chases has fully dried, it is vital to complete the legal paperwork for the home's electrical system. The final certificate confirming that your internal network is fully suitable is called the electrical certificate (boletín eléctrico), or the Electrical Installation Certificate (CIE). Without this document, you cannot register the supply, change your contract with your energy supplier or increase the power for your air conditioning equipment.

This document is issued, dated and signed by an authorised electrical installer who takes full legal responsibility for the proper working of the system. The electrician will test your home before it is signed off, checking insulation resistance, confirming that the residual-current device trips correctly and checking the condition of the building's earthing network, using calibrated certified equipment. If everything complies with the regulations, the electrician files the official certificate with the relevant industry authority in your autonomous community to validate the supply.

If you need to check how this legal document works, its mandatory validity periods and what it costs a private homeowner in Catalonia, you can read our detailed article on the electrical certificate (CIE).

But your home's network does not start freely at the main board. The utility line first connects to the General Protection Box (CGP) of the building. The CGP is a fire-resistant, sealed box that houses the mechanical main fuses, marking where the private installation begins and where the public supply company's responsibility ends. In individual homes or ground-floor premises being renovated, checking that it complies with the recommended insulating materials is an essential priority.

For this reason, knowing the right maintenance conditions, and understanding when this publicly accessible component must be replaced, is a clear technical advantage. If you want to learn more about this main power distribution box, see our specific report on the CGP (general protection box) for a home.

Comparison table: circuits, cable sizes and uses

To help you understand how a modern home is structured, here is a clear summary of the wiring the REBT requires for the main domestic supplies:

Circuit codeCopper cable cross-section (mm²)Breaker rating (PIA)Main purpose and design considerations
C11.5 mm²10 AGeneral lighting points throughout the home. Includes switches, two-way switches and ceiling or wall lights.
C22.5 mm²16 ASockets for everyday household use, the fridge, the television and the kitchen extractor.
C36 mm²25 ABranch for a ceramic or induction hob and the electric oven. Requires high-power sockets.
C42.5 to 4 mm²20 A or 3x16 ASupplies the washing machine, the dishwasher and the domestic hot water cylinder. Commonly split.
C52.5 mm²16 APower outlets in damp areas exposed to direct splashes, such as main bathrooms and kitchens.
C96 mm²25 ADedicated systems for ducted air conditioning, heat pumps or high-capacity multi-zone inverter air conditioning.
C132.5 to 10 mm²16 to 40 AElectric vehicle charging infrastructure. Cabling must be sized for voltage drop and needs specific protection.

Recommendations for successful electrical planning

If you are planning the electrical layout of your home, whether as part of a major building work project or a new build, we advise drawing up a detailed plan of exactly where every socket, switch and light control will go before you start fitting the back boxes. This will prevent awkward layout problems in day-to-day life later.

First, pay special attention to the kitchen. This area accounts for about a third of typical household consumption and needs many sockets with suitable cable sizes. Make sure that the sockets for built-in appliances (the dishwasher, the washing machine or the fridge) are not placed directly behind their metal bodies. That way they can be disconnected from the adjacent wooden kitchen cabinets if a short-circuit fault occurs in the internal heating elements.

Second, plan the living room and dining area carefully. This space has become the main entertainment hub of the flat, so it will benefit greatly from grouping several standard Schuko sockets where the television, the Wi-Fi router, the sound system or the games consoles will be. This way you avoid relying on extension leads or poor-quality adapters on the floor. It is also worth planning separate telecoms ducting for coaxial TV cables and Category 6 RJ45 Ethernet cabling, to avoid interference from the power cables.

Last, pay priority attention to the strict safety rules for bathrooms. Under the directives of general technical instruction ITC-BT-27 for dwellings, bathrooms are divided into critical damp zones. Running any power cabling, or installing switches and light controls near taps or less than 2.25 metres above the floor of the bath or shower tray, is strictly forbidden. The aim is to protect people from accidents caused by moisture.

Frequently asked questions about home electrical installations

Why are AC-type residual-current devices no longer allowed?

Traditional AC-class residual-current devices were designed to detect leaks of purely sinusoidal alternating current. However, in today's technology-filled homes in 2026, the widespread use of appliances with sensitive electronics (smart televisions, lithium battery chargers, inverter air conditioners or fast induction hobs) rectifies the mains current internally and generates leaks with a pulsating direct-current component that an ordinary AC-type device cannot detect. This carries the serious risk that the switch becomes magnetically saturated and its trip mechanism locks, so it would not trip in the event of a fault. This is why advanced type A devices must be installed to guarantee disconnection in milliseconds.

When is it compulsory to replace and renew all the wiring in a flat?

Replacing all the concealed cables becomes compulsory straight away if your home has no safety earthing network (the green and yellow two-colour cable), if the conductors are old solid single-strand copper without suitable insulation, or if the wiring is inside old fabric sheathing that is very prone to cracking. Likewise, if you are starting any major renovation or want to formally request a significant increase in power from your local electricity distributor to install heaters or fast car chargers, the energy company will ask for a CIE certificate. You will only obtain one after certifying that every section complies with the current low-voltage regulations.

What is the approximate cost of upgrading the full electrical installation of a home?

For a standard residential flat of around 80 square metres of usable floor area, the approximate budget for redoing the whole electrical network is usually between 3,500 € and 6,000 € plus VAT. This total covers the mechanical cutting of chases into the walls by builders, the clean installation of new self-extinguishing flexible corrugated tubes, the wiring with suitably sized low-halogen cables, the assembly of a modern distribution board with type A residual-current devices and permanent surge protection modules, and the neat fitting of all the switches and decorative light fittings on the walls.

Can I issue the electrical certificate myself, or does my energy supplier do it?

No. Under no circumstances can a private homeowner certify it, and it is not one of the technical or commercial obligations of the energy company you buy your monthly supply from. The Electrical Installation Certificate (CIE) must be issued, dated and signed by an authorised electrical installer approved by the Spanish Ministry of Industry, or by a qualified renovation company. The professional must visit the property in person to test the internal wiring, check the real trip speed of the safety residual-current device on the board using calibrated equipment, and formally certify to the regional inspection body that the whole installation is safe before the flat is registered as legal.

Further reading for your renovation project

If you are planning a deep transformation of your property and want to clear up any doubts about costs, required paperwork and site supervision, we suggest reading these practical guides carefully:

Keep reading

✆ Call✦ WhatsAppGet a quote →