Full renovations

What is a General Protection Box (CGP)? Function, rules and when it is replaced

By the Tu Nuevo Piso teamPublished 8 July 202616 min read

Indicative prices · VAT not included. Not a binding offer.

What is a CGP (general protection box) and when is it replaced?

The CGP, or general protection box, is the insulating, self-extinguishing box that houses the fuses of the building's General Supply Line (LGA) and marks where the distributor's network ends and the building's installation begins. It is regulated by ITC-BT-13 of the REBT. It is replaced because of deterioration, a power increase, defects flagged in an inspection or overheating.

Key points to know today

  • The electrical boundary: The CGP marks the point where the distributor's network ends and the building's installation begins.
  • Vital protection: Its main job is to house fuses that protect the building against short circuits and overloads.
  • REBT rules: It is strictly governed by the complementary technical instruction ITC-BT-13.
  • Reasons to replace it: Faults, rust, a power increase, or adaptations for electric vehicle charging.
  • Ownership and costs: It belongs to the owner or the community, who are responsible for its upkeep, although the box can be sealed and work on its connections requires prior notice to the supply company.

Let's be honest. Nobody gets up in the morning thinking about the grey or beige box built into the façade of their building. We walk past it every day, laden with shopping bags or looking at our phones, with no idea that this mysterious reinforced plastic box is the only real shield protecting the electrical system of our homes. For most people, electricity simply comes out of the socket by magic. The technical reality is very different, and rather more complicated.

In 2026, with the unstoppable electrification of homes, the spread of electric vehicle charging points and the rise of climate control systems such as aerothermal heating, the electricity network in our buildings is under pressure like never before. This is exactly where the General Protection Box (Caja General de Protección, CGP) plays an absolutely crucial role. It is the first physical and technical barrier between your home and any electrical disaster coming in from the street. Understanding what it is, how it is regulated and when it must be replaced will save you enormous headaches and costly fines from the distributor.

If you are planning to renovate your home, or you are concerned about the condition of your owners' community, it is worth taking a close look at the state of the electrical installation in homes. Understanding the whole route electricity takes, from the public distribution network to the last switch in your living room, will show you why the CGP is not just decorative plastic but a vital safety element.

What exactly is a General Protection Box (CGP)?

The General Protection Box, known in the trade as the CGP, is a box made from insulating, self-extinguishing materials that houses the protection devices of the General Supply Line (LGA). Basically, it acts as the entry point for electricity into a property. It is the first physical point of the building reached by the heavy cables of the external service connection installed by the distribution company (such as Endesa, Iberdrola or Naturgy).

Beyond its technical definition, the CGP represents an extremely important legal and responsibility boundary. Imagine an invisible line drawn right at the incoming terminals of this box. Everything before the CGP (the cables running under the pavement or across the street overhead) belongs to the energy distributor. Everything from the CGP onwards, including the box itself (together with the General Supply Line, the meter room and the individual branch line that reaches your flat), is part of the connection installations, which belong to the user, that is, the building or the community of owners.

This means that if a cable breaks in the middle of the street, the distribution company must repair it straight away without charging you a cent. However, if the CGP burns because its internal components have degraded after forty years exposed to the weather, the replacement and maintenance fall entirely to the owners. Not knowing this often causes tense disputes among neighbours at community meetings, when an unfavourable inspection notice arrives.

The critical function of the CGP: much more than fuses

The main job of the CGP is not to carry electricity but to protect. But protect against what, exactly? Imagine a devastating short circuit on the main line that runs up to the building's meters because of water seeping into the walls. Without the CGP, that huge short-circuit current would travel straight back into the distributor's medium- or low-voltage outdoor network, causing mass blackouts across the neighbourhood and even destroying local transformers. In the same way, the CGP stops surges from the public network from passing uncontrolled into your community of owners.

To achieve this, general protection boxes house fuse cut-outs on all the phase conductors (excluding the neutral, which has a solid removable connection). These fuses are a special type of high breaking-capacity device, known in the electrical trade as NH blade fuses. They are calibrated very precisely so that, if the maximum permitted current of the General Supply Line is exceeded, the metal inside melts instantly, cutting off the supply at source before the line can catch fire.

It is also worth remembering its use as a cut-off point. In an extreme emergency, such as a fire in the building or severe flooding in the service basement, firefighters or the distributor's technicians will not risk going in to cut the power. They will go straight to the outside façade, open the CGP niche with a special approved key, and remove the fuses with an insulated handle. In about a minute, the building will be completely de-energised, so evacuation and firefighting can be carried out safely.

It is important to remember that the CGP is directly linked to the main electrical panel of the home. While the flat's own panel protects you from low-intensity domestic problems (such as a burnt-out socket or a faulty appliance), the CGP handles enormous power loads and protects the structural integrity of the whole building.

The rules that apply: ITC-BT-13 of the REBT

The installation, technical requirements, location and design of the General Protection Box are not left to whichever installer happens to turn up. Everything is regulated precisely in the Low-Voltage Electrotechnical Regulation (Reglamento Electrotécnico para Baja Tensión, REBT), specifically in its complementary technical instruction ITC-BT-13. This regulatory guide sets out the requirements that guarantee the overall safety of the connection installations.

The REBT rules set out, among many other things, the mandatory mechanical and physical location characteristics of CGPs:

  • Free-access location: The CGP is installed preferably on the outside façades of buildings, in places with free and permanent access, and its position is agreed between the owner and the supply company, so that the distributor has free access at any time of day or night without asking residents for permission or entering private common areas.
  • Underground connections: If the street cables come up through the ground, the box must sit in a wall niche closed by a door, preferably metal, with anti-corrosion protection and a minimum impact protection rating of IK 10.
  • Overhead connections: In established urban areas where the network runs overhead along the façade, the CGP can be surface-mounted, at a height above the ground of between 3 and 4 metres to prevent vandalism or accidents with tall vehicles.
  • Self-extinguishing materials: Boxes must be made from composite materials that do not spread fire under any circumstances (usually glass-fibre-reinforced polyester), and must withstand prolonged direct exposure to ultraviolet sunlight and sudden changes in temperature.

So if you live in an old block where the CGP is inside the entrance hall, under the timber staircase or hidden behind a plasterboard panel in the lobby, it is worth reviewing its position. ITC-BT-13 asks for the CGP to be installed preferably on the outside façade, in places with free and permanent access, with its position agreed between the owner and the supply company. The REBT applies to new installations and to the modified or extended part of existing ones, and to existing ones whose condition poses a serious risk, in the judgement of the competent body of the regional government. If the box is hidden or has no free and permanent access, discuss it with an authorised installer and the distributor.

Types of CGP and distribution layouts

Not all residential buildings or industrial units use the same amount of energy or are supplied in the same way. For that reason, manufacturers offer an approved range of CGPs with different physical configurations, designed around the maximum amperage and the number of general supply lines in the building.

The main differences between models are usually linked to the type of electrical layout used to feed the meters:

  • Single LGA layout: Designed for standard medium or small residential blocks. It has a single set of three-phase fuses for one line connecting the façade to the centralised meter bank.
  • Multiple LGA layout: Reserved for large residential complexes or multi-storey towers where distances and power demands mean the load has to be split across several independent lines. Remember: ITC-BT-13 provides for one general protection box per general supply line, and no more than two boxes in the same niche.
  • Protection and metering boxes (CPM): In buildings without a community of owners, such as a detached house or a street-level shop with moderate power, it makes no sense to install a CGP and then a separate meter cabinet. For these cases, CPMs are installed, which combine the protection fuse and the distributor's smart remote-reading meter in the same sealed unit.

To make things clearer visually, here is an indicative guide to common CGP types. Note that ITC-BT-13 refers to the technical specifications of the supply company that have been approved by the authorities, and that company determines the specific layout, so models and current ratings may vary:

Common CGP modelAssociated layoutMaximum current (A)Preferred locationTypical use
CGP-1-100Layout 1 (basic)100 AExternal façade / surface-mountedSmall buildings with few flats and small premises.
CGP-7-160Layout 7 (three-phase)160 AWall niche in the façadeMedium-sized communities with a shared lift.
CGP-9-250Layout 9 (reinforced)250 ANiche with IK10 metal doorMedium buildings, shared garages with EV charging.
CGP-10-400Layout 10 (high power)400 ALarge-format nicheLarge communities and multi-family complexes.
CPM (unified box)Single-phase / three-phase layoutUp to 63 A / 80 AAccessible external façadeIndividual detached house, commercial premises or shared services.

When is it compulsory or advisable to replace the CGP?

Unless an obvious disaster occurs, such as the box suddenly catching fire, most communities stretch the working life of their CGPs to surprising lengths. However, there are situations where the distributor or regional regulations will inevitably require you to replace this element of your connection installation. This is not an industry whim but a logical question of infrastructure safety.

Replacement cases can be grouped into four main scenarios that come up regularly in electrical renovations in Spain:

1. Deterioration, severe ageing and defects

Buildings put up in the seventies or eighties often had thin sheet-metal protection boxes or early phenolic casings. Over the years, rain, sea salt in coastal areas and CO2 from car pollution eat away at the metal joints of the niches or crack the old plastic. Cracked plastic lets moisture or rainwater in gradually. Salt water combined with high-voltage fuses creates an explosive mix of short circuits, electric shock risk when touching the façade, and serious fires.

2. Power changes and new connections

If you buy a commercial premises and need a higher-power supply, or if a neighbour in the block buys an electric car and asks to install a fast charger that requires raising the three-phase power, the distributor will require a review of the technical documentation for the installation. If the building's CGP does not suit the power requested, it may have to be adapted together with the General Supply Line: ITC-BT-13 says the CGP layout depends on the needs of the supply requested and the type of supply network, and is determined by the supply company.

This is a particularly common issue when you plan to renovate old buildings in Barcelona. The high density of flats in historic districts that lack connection installations ready for the new electric loads of climate control directly forces the CGP to be restructured from the street itself.

3. Non-compliance found in periodic inspections (OCA)

Under ITC-BT-05 of the REBT, the common installations of residential buildings with a total installed power above 100 kW must be inspected every 10 years by a Control Body (popularly called an OCA). The body classifies defects as minor, serious or very serious. If it finds at least one serious defect, the installation is rated “conditional” and, for an installation already in service, a deadline for correction is set that cannot exceed 6 months; if it finds a very serious defect, the rating is “negative” and the certificate is sent to the competent body of the regional government.

4. Insulation loss or internal overheating

Watch out for this silent enemy of connection installations: accumulated heat. Over the years, the screws on the terminals that clamp the fuse blades can gradually loosen as a result of repeated thermal expansion and contraction from the electric current. A loose terminal leaves a tiny air gap that triggers a harmful physical effect known as contact resistance, generating high localised temperatures of up to 300 degrees. This irreversibly melts the plastic support of the box and damages the terminal cables without the fuse itself blowing, which can make the entire CGP unusable.

The replacement process step by step: who does it and what does it cost?

It is now clear that the CGP is in a poor state and your community is legally obliged to renew it as soon as possible to avoid unwanted supply cuts. But before you call the first electrician you find online, it helps to understand that replacing a box where cables carrying lethal voltages come directly from the neighbourhood transformers requires a strict administrative and technical co-ordination procedure.

The usual procedure for a compliant replacement follows this exact order:

  1. Assessment by an authorised installer: Use only a professional renovation company or an electrician working for a low-voltage installation company registered with the regional government; the basic category covers installations in buildings that are not reserved for the specialist category (ITC-BT-03). This technician will check the right layout for the size of your flats and shared premises.
  2. Official contact with the distributor: Because the CGP fuses are sealed by the distributor to protect the network from tampering, the installer must request a permit to break the seal and a line isolation (a scheduled temporary power cut in the area) so that the old box can be removed without working live, preventing serious arc-flash accidents.
  3. Fitting and technical connections: The old casing is removed from its niche, the wall is made good, and the new approved glass-fibre box is installed with its safety fuse bases and robust terminals.
  4. Checks, certification and CIE: To confirm that the work meets the levels required by the regulations, the installer will issue an official electrical certificate (CIE) confirming the suitability and safety of the new CGP. This document is essential for the distributor to reconnect the electricity to the building after the change.
  5. Safety sealing: As a final step, the official technicians of the local supply company visit the building to inspect the cable sections and the neutral connection, and fit new numbered plastic seals that stop any neighbour or outside professional from opening the box without authorisation.

And now the eternal question from property managers and owners' meetings: what budget are we really talking about for this electrical special levy? It depends. For a detached house, or a premises replacing its old external CPM with a current model, the box plus the electrician's labour usually comes to between 300 € and 600 €.

On the other hand, for a large residential block with underground three-phase connections that requires opening a niche in the wall, replacing the embedded copper General Supply Line and re-certifying the installation with the regional Industry office, the overall cost can easily rise to 1,500 € to 4,000 €. In any case, this is a compulsory investment for the collective physical safety of the building.

When you commission joint works in your block, do not neglect legal protection. To make sure no job is left unfinished and that the contractor takes responsibility for any later defects, it is worth reading up thoroughly on the time limits and cover of the warranty on a renovation set out by the Building Act (Ley de Ordenación de la Edificación, LOE) in Spain.

Frequent defects a CGP suffers

As a property owner or building manager, it is very useful to learn to recognise at a glance the signs that a building's CGP is crying out for urgent renewal. As we said, problems rarely give a gentle warning. They tend to erupt suddenly, leaving you without heating, lift or cooker in the middle of the weekend.

Here are the visual signs and defects most often found in building inspections:

  • Cracks or breaks in the plastic casing: If the afternoon sun has baked the polyester resins of the old CGP and you can see cracks or a missing piece of the lid, moisture, insects and dust will speed up the internal rusting of the copper connections on the terminals.
  • Soot marks or a smell of burnt plastic near the niche: If you notice a persistent smell of scorched cable as you walk past the box, or blackening around the vents, call a professional urgently. A "hot spot" caused by an internal loose contact is probably developing, and the box is at risk of sudden combustion with disastrous consequences.
  • Rusted or stuck niche doors: For underground connections, the outer metal door must open easily for maintenance technicians. If it has rusted fused to the wall or the standard star-key lock is broken, it is an accessibility problem (ITC-BT-13 asks for free and permanent access) that should be fixed as soon as possible.
  • Pest infestation inside: Mice, ants and, above all, wasps find the warm, sheltered interior of the CGP a perfect place to nest. Wasp nests and the mud in their structures can hold moisture and cause direct earth leaks, with the fuses consequently melting.

Frequently asked questions about the General Protection Box

Can the General Protection Box (CGP) be opened freely?

Absolutely not. Although the box and the fuses it contains are usually owned by the community of owners or the property owner, direct access to the inside is strictly restricted to the electricity distributor or authorised installers after prior notice. It is usually sealed to prevent fraud, energy theft and extremely serious accidents.

Where is the CGP of my home or building exactly located?

The rules in force, specifically ITC-BT-13 of the REBT, state that the CGP is installed preferably on the outside façades of buildings, in places with free and permanent access, with its position agreed between the owner and the supply company; where the façade does not border the public road, it is placed at the boundary between public and private property. This ensures that the distributor's technicians and emergency services (such as firefighters) can reach it without having to enter the building or premises in the event of a fire.

How much does it cost to replace a CGP and who pays?

The replacement of an obsolete or broken CGP is paid for by the owners (the community of owners or the sole owner if it is a detached house). The budget varies greatly depending on whether only the box itself needs replacing (roughly 300 to 600 euros, materials and labour included) or whether it involves reworking the external service connection or the General Supply Line, which can raise the total cost of the electrical renovation.

What is the difference between a CGP and a CPM?

The main difference lies in their purpose and integration. The CGP contains only the safety fuses that protect the supply line, whereas the CPM (Protection and Metering Box) combines the protection fuses and the metering equipment (the electricity meter) in a single enclosure. CPMs are usually reserved for simple supplies, such as individual detached houses, low-power premises or temporary building supplies.

Further reading and useful resources

If the mandatory technical inspection of your block is just around the corner, or you simply want to improve the habitability and running of your shared services, you can ask for a personalised renovation quote. A qualified team will review the weak points of your connection installation from the façade itself, to make sure you comply strictly with the most demanding electrical safety rules in Spain.

In short, the General Protection Box is much more than that boring plastic box that gets covered in street graffiti. It is the master fuse of your building, an insurance policy against serious electrical problems, and a critical connection point that governs your present and future energy-use options. Keeping it clean, free of damp, properly sealed and up to date with ITC-BT-13 of the current REBT is a shared duty that will give you peace of mind and safety in your everyday domestic life.

Sources

Keep reading

✆ Call✦ WhatsAppGet a quote →