Living and dining room renovation: open kitchen, floors and light
The living-dining room is the heart of the home. Here is how to renovate it in Barcelona: opening the kitchen, getting the floor right and making the most of natural and artificial light.
Indicative prices · VAT not included. Not a binding offer.
The living-dining room is the heart of the home: where life happens, where guests are received, and where you really notice whether a renovation has been well thought out. In Barcelona, where long, narrow flats with little light are common, renovating this room usually means three key decisions: whether to open the kitchen, how to choose the right floor and how to bring in as much natural light as possible. Tu Nuevo Piso renovates living rooms regularly, and this guide explains how to get each of these decisions right, with 2026 prices.
Where to start: define how you really use the living room
Before knocking down any partitions, stop and think about how you live. A living room for a couple who work from home is not the same as one for a family with children, or one in a flat designed to rent out. These are the questions worth asking at the start:
- Do you want an open-plan kitchen, or do you prefer it separate to keep smells and noise in check?
- Do you need a work or study area inside the living room?
- How many people do you usually need to seat, and how many only on occasion?
- Is the room for your own use, or are you renovating to add value and rent or sell?
If your goal is return on investment, our guide on renovating a flat to rent out covers the items that have the biggest impact on market value.
Open kitchen to the living room: advantages, drawbacks and regulations
Opening the kitchen to the living room is the dominant trend and, when done well, it transforms a flat. But it is not only an aesthetic decision. It has technical and sometimes regulatory implications.
Advantages of an open kitchen
- A greater sense of space and light, especially in small flats.
- A social space: whoever is cooking is not cut off from the rest of the room.
- It allows islands or peninsulas that add work surface and seating.
Drawbacks to consider
- Smells and fumes: you need a good extractor hood with an outside vent.
- Appliance noise in the living area.
- The kitchen needs to be kept tidier, because it is on view.
Technically, opening the kitchen usually means knocking down a wall. If that wall is load-bearing, you will need a structural reinforcement (a lintel or beam) calculated by a technician, and the works move from minor to major. This is where the choice of the new partition comes in: we explain it in plasterboard or brick partition: which to choose for your renovation. And remember that in some municipalities, and for certain uses, habitability rules require kitchen ventilation. It is worth checking whether this affects your habitability certificate (cédula de habitabilidad).
Living-dining room floors: comparison and prices
The floor is the surface you see most and that takes the most wear. In a living-dining room you need a balance between looks, durability and upkeep. These are the usual options, with guide prices for 2026, materials and labour included.
| Type of floor | Price (€/m²) | Advantages | To consider |
|---|---|---|---|
| Laminate flooring (AC4-AC5) | 25 – 45 €/m² | Affordable, quick, warm | Sensitive to moisture unless water-resistant |
| Vinyl / SPC flooring | 35 – 60 €/m² | Water-resistant, easy to clean | Less refined finish than wood |
| Natural wood flooring | 60 – 120 €/m² | Warm, refined, can be sanded | Higher maintenance |
| Large-format porcelain | 45 – 90 €/m² | Very durable, ideal with underfloor heating | Feels colder to the touch |
| Microcement | 70 – 110 €/m² | Seamless, no joints, very contemporary | Needs a specialist applicator |
If you want to renovate without lifting the existing floor, in many cases wood or vinyl flooring can be laid on top of the current one. We explain this in changing the floor without building work in Barcelona. And if you like a seamless finish with no joints, read our guide to microcement in Barcelona: price, application and where to use it, a popular choice for modern living rooms.
A trick for visual continuity
In flats where the kitchen is opened to the living room, using the same floor in both zones (or a wood-effect porcelain) creates continuity and makes the space look larger. Changing material between kitchen and living room, on the other hand, breaks up the space visually and usually reduces the sense of size.
Natural and artificial light: the factor you notice most
Light is what separates a living room you fall in love with from one that feels like a corridor. The approach works on two levels: making the most of natural light and designing artificial light well.
Maximising natural light
- Remove partitions that block the light coming in from balconies or windows.
- Use glass doors or glazed panels when you want to separate spaces without darkening them.
- Choose light colours for walls and ceilings, and mid-tone floors that reflect light.
- When there is a terrace or balcony, integrate it visually with the living room. If that is your case, our guide to renovating a terrace and balcony in Barcelona will help.
Designing artificial light in layers
- General light: recessed spotlights or LED strips for even illumination.
- Zone light: over the dining table and the sofa area.
- Ambient light: floor lamps, indirect LED strips and dimmers.
The whole electrical installation of a renovated living room must comply with the Low-Voltage Electrotechnical Regulation (REBT): the right number of circuits, protections and light points. In older flats the installation almost always needs renewing, and that is an item not to skimp on.
How much does a living-dining room renovation cost in Barcelona?
The budget depends on the scope. Changing the floor and painting is not the same as opening the kitchen, renewing the installations and redoing the ceilings. These are the ranges we work with in 2026.
| Level of renovation | What it includes | Guide price |
|---|---|---|
| Quick refresh | Paint, new floor, lighting | 3,000 – 7,000 € |
| Mid-range renovation | Floor, electrics, false ceiling, joinery | 8,000 – 16,000 € |
| Renovation with open kitchen | Demolition, reinforcement, kitchen, floor and lighting | 15,000 – 30,000 €+ |
As a general reference, a full renovation in Barcelona ranges between 600 and 1,000 €/m². If the renovation includes the kitchen, see the specific prices in kitchen renovation in Barcelona: prices and trends 2026, where a kitchen usually costs between 6,000 and 15,000 € depending on the quality. And if the living room is part of a full flat renovation, see our guide to the price of a full renovation in Barcelona 2026.
Heating, cooling and comfort in the living room
A beautiful living room that is cold in winter or hot in summer is a failed living room. A renovation is the ideal moment to sort out climate control: ducted air conditioning hidden in the false ceiling, underfloor heating, or an aerothermal system that covers heating, cooling and hot water. If you want an efficient, future-proof solution, read our guide to aerothermal heating and climate control in a full renovation.
Common mistakes when renovating a living-dining room
- Opening the kitchen without solving the fume extraction properly: the smell ends up invading the sofa.
- Cutting corners on the electrical installation and running out of sockets or light points.
- Choosing the floor on looks alone, without considering pets, children or upkeep.
- Forgetting acoustics: hard, open surfaces create echo.
- Not planning storage: a living room without cupboards ends up cluttered.
Frequently asked questions
Do I need a licence to renovate the living room?
Changing the floor, painting or renewing installations usually needs only a minor works prior notice. But if you knock down a load-bearing partition to open the kitchen, the works become major and need a technical project and a licence. It is worth checking before you start.
Is it a good idea to open the kitchen to the living room?
In most flats in Barcelona, yes: it gains light and space. The key is to invest in a good extractor hood with an outside vent and, if the partition is load-bearing, in a properly calculated reinforcement.
Which floor is best for a living room with children or pets?
SPC vinyl and porcelain are the most resistant to wear, scratches and moisture, and the easiest to clean. AC5 laminate flooring is also a good, affordable option.
How long does a living-dining room renovation take?
A quick refresh can be ready in 1–2 weeks. A mid-range renovation takes around 3–5 weeks, and a renovation with an opened kitchen and renewed installations can take 6–8 weeks, depending on the scope.
Can I renovate just the living room without touching the rest of the flat?
Yes, that is very common. If you renew the electrical installation, however, check that the consumer unit and circuits are compatible with the rest of the home, so you do not create problems.
Conclusion
Renovating the living-dining room is the intervention that changes the way you live in a flat the most. An open kitchen done well, the right floor and a good lighting strategy turn an anonymous room into the centre of the home. The key is to decide from how you really use it, respect the regulations (structural reinforcements, REBT, habitability) and plan the budget carefully. Tu Nuevo Piso designs and carries out your living room with a registered architect, a site manager and a fixed quote, with no surprises. Tell us about your flat and request your free quote: we will suggest the best way to gain light, space and comfort.
Keep reading
Architect fees for a renovation: how much the project costs
What an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Full renovationsHow to choose materials for your renovation: a room-by-room guide
Not sure which materials to pick for your renovation? A practical room-by-room guide to floors, worktops, bathroom finishes and paint, with what to check.
Full renovationsUrgent damp and leak repair in your home: what to do first
Urgent guide to fixing leaks, damp and water stains at home for good. Diagnosis, what to do first, typical costs and solutions for 2026.

