Renovating a bathroom and kitchen at the same time: which items are shared
Combining bathroom and kitchen shares the paperwork, protection, rubble removal and cleaning. Both projects are still paid in full. Here is what counts in each case.

Indicative prices · VAT not included. Not a binding offer.
What do you save by renovating a bathroom and kitchen at the same time?
When you renovate a bathroom and kitchen at the same time, you pay only once for what does not depend on the room: paperwork, protection, skip, final cleaning and site management. The bathroom and the kitchen themselves are paid in full, whether you combine the works or not.
That is why we do not give you a percentage saving: we have not measured it, and anyone who promises one without seeing your flat is guessing. What we can do is separate what is duplicated from what is not.
Key points
- Combining the works avoids paying twice for paperwork, protection of common areas, rubble removal and final cleaning.
- The full bathroom and the full kitchen are paid in full: at functional quality they add up to 15,773 € (guide price, base without VAT).
- Plumbing is shared very little: bathroom and kitchen usually have different supply points and drains.
- The real cost of combining them is day-to-day living: a period without a bathroom and a kitchen at the same time.
Which items you pay for only once when you combine bathroom and kitchen
These are the items that exist because of the works, not because of the room. You will see them in any quote with well-itemised chapters.
| Item | Unit | Functional | Medium | High |
|---|---|---|---|---|
| Licences and technicians | unit | 106 € | 250 € | 2,450 € |
| Auxiliary equipment and protection | unit | 151 € | 170 € | 237 € |
| Removal of rubble and waste | m³ | 28 € | 41 € | 65 € |
| Final site cleaning | item | 1,058 € | 1,335 € | 1,613 € |
Guide prices · VAT not included. This is not a binding offer: the fixed quote is given after the free technical visit.
The prior notification of works or the licence is processed once, with its cost as a separate item. The protection of the entrance hall, stairs and lift is put up once and removed once. And the skip comes and goes with both works inside.
Final cleaning is the most striking item in the table. It is invoiced once instead of twice, and that is what is really shared, together with site management and the initial visit.
Here is what we see on site. When an owner asks us for the kitchen only and calls again about the bathroom two months later, they almost always end up paying twice for what has nothing to do with the room: protection, the skip, end-of-works cleaning and the initial visit. Until the second job is done, nobody adds it up.
What is not shared: the bathroom and kitchen are paid in full
Combining the works does not make the two projects cheaper. The bathroom has its tiling, sanitary ware, shower tray or bath, taps, vanity unit and screen. The kitchen has units, worktop, sink, extractor hood and appliances.
| Project | Functional | Medium | High |
|---|---|---|---|
| Full bathroom renovation | 10,255 € | 15,759 € | 20,467 € |
| Full kitchen renovation | 5,518 € | 7,650 € | 14,961 € |
| Total of both | 15,773 € | 23,409 € | 35,428 € |
Guide prices · VAT not included. This is not a binding offer: the fixed quote is given after the free technical visit.
That total is the floor of the renovation, not a ceiling. If someone offers you bathroom and kitchen for much less, check what they say about installations, waterproofing and site management before you celebrate.
And note: the kitchen price in our price table is the same for kitchens of different sizes. What changes with the square metres is the units and the worktop, so your real figure depends on the specification of finishes.

Plumbing and electrics: where work is shared and where it is not
People expect more savings here than there are. Bathroom and kitchen share a drainage stack in many flats, but each room needs its own water points and drains.
A plumbing point costs around 260-511 € depending on quality, and plumbing adaptation 406-685 € (guide price, base without VAT): you pay per point and per item, and it is not split between rooms. What is shared is the team's travel and coordination: the plumber opens up once, finishes both areas and does not set up scaffolding or protect the floor again.
Electrics work in a similar way. The electrical upgrade of each room is counted separately (223-549 € per room, guide price, base without VAT), but if the consumer unit has to be modified or an electrical certificate is needed, it is done only once for everything.
The distance to the drainage stack weighs more than any discount. If the kitchen is far away, the pipe run costs more, and combining works does not fix that.
Disruption and timing: living without a bathroom and kitchen at once
This is the real price of combining them. While the works last, you have no kitchen and, depending on how it is planned, no working bathroom either. If you live in the flat, you need a plan: eating out, a temporary bathroom or another solution for one room.
With separate works, you always keep one of the two rooms. With combined works, the renovation finishes sooner on the overall calendar, but it is harder to live through while it lasts.
We do not give the specific timeline in the abstract: it depends on the scope, on whether installations have to be moved and on the materials. It comes in the quote after the technical visit and should be stated in writing, as should the order of the trades.
When to separate them and when to combine them
Combine the works if you are going to renovate both in the next few months, if both rooms share a drainage stack or a wall, or if you plan a partial renovation with more rooms. There, the shared items work in your favour.
Separate them if you cannot live without a kitchen and a bathroom at the same time, if the budget does not stretch to both or if one of the rooms is in good condition. Renovating for the sake of it does not pay off.
Our practical recommendation: ask for the fixed quote for both rooms together and also separately. Comparing the two figures item by item will tell you what is really shared in your flat, and it is the only way to settle the doubt without relying on percentages.
Frequently asked questions about renovating a bathroom and kitchen at the same time
Is it cheaper to renovate a kitchen and bathroom together?
Somewhat, but not the projects themselves. You pay only once for the paperwork, protection, skip, final cleaning and site management. The full bathroom and the full kitchen are paid in full. There is no fixed percentage: it depends on your flat.
Do I pay for just one licence if I renovate a bathroom and kitchen at the same time?
Normally a single prior notification or licence is processed for the whole job, and its cost appears as a separate item in the quote. Which procedure applies is decided by the town hall according to the scope; it is worth confirming with a technician or through the council's preliminary enquiry.
Can I live at home while I renovate the bathroom and kitchen?
You can, but with serious inconvenience: no kitchen and, depending on how it is planned, part of the time without a full bathroom. You need to plan a temporary bathroom and eating out. If you cannot, it is better to separate the works or keep one of the two rooms working.
Are plumbing points shared between bathroom and kitchen?
No, each room needs its own water points and drains, and they are counted separately. What you gain is the plumber's coordination, as they open up once, and the drainage stack if both rooms are close. The further apart they are, the longer the pipe run.
Further reading
- Bathroom renovations in Barcelona - To see how we handle a bathroom renovation on its own.
- Kitchen renovations in Barcelona - To see how a kitchen renovation is planned and what it includes.
- Functional, mid-range or high quality: what changes in each item of a renovation - To decide which quality level to price both rooms at before combining them.
- Calculate your renovation budget - To get a first guide figure for bathroom and kitchen before the technical visit.
Keep reading
Which rooms make a renovation more expensive: bathrooms and kitchens versus bedrooms
A square metre of bathroom costs about 15 times a bedroom's, and a kitchen's about 3.5 times. Here is the calculation for each room, with the bedroom broken down.
Prices and quotesFunctional, mid-range or high quality: what changes in each item of a renovation
Quality shows in what you see and touch, not in what is hidden. We show you, item by item, where the price rises and where spending more is not worth it.
Prices and quotesUsable or built area: which one to use when budgeting your renovation
Floors, paint and tiling are measured inside the walls. If a quote uses the square metres on the deeds, its price per metre can no longer be compared.