Functional, mid-range or high quality: what changes in each item of a renovation

Quality shows in what you see and touch, not in what is hidden. We show you, item by item, where the price rises and where spending more is not worth it.

By the Tu Nuevo Piso teamPublished 16 November 202610 min read
Three tile sample boards of different quality laid on a building site floor

Indicative prices · VAT not included. Not a binding offer.

What really changes between a functional, mid-range and high quality renovation?

Between a functional, mid-range and high quality renovation, what changes most is what you see and touch: sanitaryware, kitchen units, windows, doors and flooring. What is hidden (demolition, electrics and, to a lesser extent, plumbing) varies little in price between quality levels, and that is where you should not cut back.

In an 80 m² flat, mid-range quality works out 1.45 times more expensive than functional and high quality 2.06 times. But that multiplier is not spread evenly: it is concentrated in a few items.

Key points

  • In an 80 m² flat, mid-range quality costs 1.45 times the functional level and high quality 2.06 times (43,372 € versus 89,392 €, guide prices, VAT not included).
  • An electrical point goes from 23 € to 30 € between functional and high; an aluminium window, from 553 € to 2,216 €.
  • The extra cost of quality lives in what is visible: sanitaryware, kitchen units, windows, doors and floors.
  • You can mix quality levels in the same renovation, and it is the most sensible approach: upgrade where you use things every day, go lower where it is not noticeable.

What each quality level means: functional, mid-range and high

The three levels are not three levels of building work, but three levels of finish and product on the same well-built job.

Functional quality does the job: standard sanitaryware, a basic kitchen unit, simple ceramic flooring, plain doors, adequate windows. Mid-range goes up in materials and in fitting details that you notice with use. High adds large formats, better ironmongery, higher-grade taps and higher-performance window and door frames.

This is what you should see written in the quality specification of your quote. If it just says "sanitaryware", with no range or reference, you do not know what you are buying. And without that, comparing two offers is impossible.

One clarification that saves misunderstandings: "functional" does not mean poor work. The plumbing, electrics and waterproofing of a well-executed functional renovation are the same as in a high-quality one. What changes is what you choose to touch and see.

Items where the price barely changes: installations, demolition and building work

What is hidden behind the wall costs almost the same at any quality level, because the work is the same and the material barely changes.

Look at the electrics. An electrical point or switch costs 23 € at functional level, 25 € at mid-range and 30 € at high. An LED lighting point, 27 €, 28 € and 32 €. The complete electrical installation item in the price table is around 3,793 €, 3,867 € and 3,976 €. There is almost no difference.

Item (unit)FunctionalMid-rangeHigh
Electrical point / switch (unit)23 €25 €30 €
LED lighting point (unit)27 €28 €32 €
Electrical installation, complete item3,793 €3,867 €3,976 €
Valves and drains (unit)58 €58 €67 €
Building work: rendering and screeds (m²)36 €36 €38 €
Painting walls and ceilings (m²)23 €26 €26 €

Guide prices · VAT not included. This is not a binding offer: the fixed quote comes after the free technical visit.

Plumbing moves quite a bit more than electrics: a plumbing and drainage point goes from 260 € to 364 € and 511 €, almost double between the extremes. Even so, the total also depends on how many points you ask for and on any higher-grade fittings you want.

Here is the mistake we see most: cutting back on this to pay for better sanitaryware. It should be the other way round. A badly planned electrical or plumbing installation cannot be fixed without opening up walls, and saving a few euros per point gives you nothing back. If you want to understand how the fixed part of a renovation scales, it is explained in the breakdown by flat size.

Items where quality soars: sanitaryware, kitchen, windows and doors

Here the range really opens up. A sanitary fitting (toilet or bidet) costs 108 € at functional level, 215 € at mid-range and 477 € at high. More than four times between the extremes.

Kitchen units go from 2,565 € to 5,423 € and 6,907 €. The worktop, from 1,640 € to 2,388 € and 3,289 €. Aluminium windows, from 553 € to 1,150 € and 2,216 € each. And an interior door, from 250 € to 575 € and 780 €.

Item (unit)FunctionalMid-rangeHigh
Sanitary fitting, toilet or bidet (unit)108 €215 €477 €
Bathroom vanity unit with basin (unit)96 €161 €302 €
Shower tray / screen (unit)183 €228 €325 €
Kitchen units (furniture)2,565 €5,423 €6,907 €
Kitchen worktop1,640 €2,388 €3,289 €
Aluminium window (unit)553 €1,150 €2,216 €
Interior door (unit)250 €575 €780 €
Ceramic / porcelain flooring (m²)27 €40 €73 €
Wall tiling, fitting (m²)23 €30 €58 €

Guide prices · VAT not included. This is not a binding offer: the fixed quote comes after the free technical visit.

Flooring also scales, but with nuances. Ceramic or porcelain goes from 27 € to 40 € and 73 € per m². AC5 laminate flooring, however, barely moves: 37 €, 43 € and 48 € per m². If your priority is a floor that lasts, mid-range AC5 laminate already does the job without blowing the budget.

Equipment follows a similar pattern. A water heater or hot water boiler goes from 355 € to 1,713 € and 1,882 €; an air-conditioning split, from 523 € to 1,352 € and 2,061 €. There the jump from functional to mid-range is usually the biggest, and from mid-range to high, small.

Renovated kitchen in an Eixample flat with floor-to-ceiling units and original hydraulic tile floor
A renovated kitchen in the Eixample: this is where upgrading quality pays off most.

Complete bathroom and kitchen: how far apart the quality levels are

A complete bathroom of around 4 m² costs 10,255 € at functional level, 15,759 € at mid-range and 20,467 € at high, according to the price table. And a complete kitchen, 5,518 €, 7,650 € and 14,961 €.

These are guide figures, VAT not included, and not a binding offer. But they show something clear: in the bathroom, each step up in quality adds a similar amount; in the kitchen, the big jump comes when moving to high.

At the technical visit, almost all owners ask us for "mid-range quality throughout" without having decided what they will use every day. When we go through the flat room by room, most end up upgrading the bathroom and kitchen and staying at functional for what is hidden or not used.

That split is smarter than a flat mid-range level. The bathroom and kitchen concentrate the items where the product counts: taps, sanitaryware, worktop, units. A guest bedroom, on the other hand, rarely justifies a high-end door.

And watch out for a common trap: in the price table the complete kitchen gives the same figure for 6, 9, 10 or 12 m². What really changes with size is the units and the worktop, so always ask for the quote to detail those two lines.

An 80 m² flat at the three quality levels: what each step adds

An 80 m² flat (bathroom and second WC) comes to around 43,372 € at functional level, 62,747 € at mid-range and 89,392 € at high, VAT not included and as a guide. That is 1.45 times from functional to mid-range and 2.06 times from functional to high.

Item (80 m²)FunctionalMid-rangeHigh
Building work and assistance2,624 €2,703 €3,073 €
Plumbing (adaptation + 10 points)3,006 €4,168 €5,795 €
Complete bathroom (~4 m²)10,255 €15,759 €20,467 €
Second WC (~2 m²)837 €1,286 €2,161 €
Complete kitchen (~9 m²)5,518 €7,650 €14,961 €
Flooring throughout (AC5 laminate)2,960 €3,440 €3,840 €
Interior joinery (7 doors)1,750 €4,025 €5,460 €
Windows (5 units)2,765 €5,750 €11,080 €
Smoothing and full painting9,120 €12,000 €12,240 €
Flat total (with other items not broken down)43,372 €62,747 €89,392 €

Guide prices · VAT not included. This is not a binding offer: the fixed quote comes after the free technical visit.

See how the rows behave. Building work barely moves and painting rises mainly from functional to mid-range. Windows, joinery and the kitchen multiply. The bathroom rises more gradually but steadily.

A practical reading: if you want to stay close to functional quality in the total, windows and doors are the items that take you out of that range fastest. And if the flat has acceptable windows, keeping them can be the decision that weighs most on the total.

The price by size and its full breakdown have their own page, linked below. What matters here is the pattern: quality does not scale equally across the whole flat.

Where to upgrade and where it is not worth it

Upgrade where you touch things every day and where changing them later means building work: bathroom, kitchen, windows. Go lower where use is occasional or where the spend stays hidden.

My approach, which I defend after many visits, is this:

  1. Installations and hidden work: keep the level appropriate to the flat. Saving here costs dearly later.
  2. Windows: if they face a noisy street or a north-facing facade, upgrade. It is one of the things you notice most in comfort.
  3. Bathroom and kitchen: upgrade the taps, shower tray and worktop before the rest. They are what you use most.
  4. Doors of secondary bedrooms, floors in passageways, painting: functional or mid-range without hesitation.

Can you mix quality levels? Yes, and it is normal. A fixed quote broken down by items lets you assign a different quality to each one, and you can clearly see what each decision costs.

In a full home renovation this matters more than in a partial one, because there are more items to spread it across. But the logic holds just as well if you only do the bathroom.

One last warning about the total price: if two quotes for the same flat differ a lot and neither details brands, ranges or references, they are most likely talking about different quality levels without saying so. Ask which sanitaryware, which worktop and which window each one includes before comparing figures. For projects close to the extremes of the market, the low-cost renovation and luxury renovations are covered separately, because they raise other issues.

Frequently asked questions about renovation quality levels

What does functional quality mean in a renovation?

It means the materials and equipment do their job at a moderate price: standard sanitaryware, a basic kitchen unit, simple ceramic tiles and plain doors. The hidden work, such as plumbing, electrics or waterproofing, is carried out the same as at the other quality levels. It is not a worse renovation, it is a renovation with more basic products.

How much more does a high quality renovation cost than a functional one?

In an 80 m² flat with a bathroom and a second WC, high quality costs about 2.06 times the functional level and mid-range about 1.45 times, according to our price table, with guide prices and VAT not included. The increase is concentrated in the kitchen, windows, doors and sanitaryware, not in the installations.

Can I mix quality levels in the same renovation?

Yes, and it is usually the most sensible approach. The usual choice is to upgrade the bathroom, kitchen and windows, and stay at functional or mid-range in secondary bedrooms, painting or floors in passageways. For this to work, the quote must be broken down by item, with the quality of each one stated in the specification.

How much does an aluminium window cost depending on quality?

According to the price table, an aluminium window is around 553 € at functional level, 1,150 € at mid-range and 2,216 € at high, per unit, as a guide and VAT not included. It is one of the items where the jump is most noticeable, so it is worth deciding which ones to replace and which to keep.

What is a quality specification?

It is the part of the quote that describes which materials and equipment are installed in each item: the range of the sanitaryware, type of flooring, joinery, taps. Without it, the words "mid-range quality" mean nothing concrete. Ask for it in writing and compare it item by item before signing.