Same square metres, double the price: the 6 factors that separate two quotes
Two quotes for the same flat almost never price the same job. These are the six factors that separate the price, each with its figure.

Indicative prices · VAT not included. Not a binding offer.
Why can two renovations of the same size cost double?
Two renovations of the same size can cost double because the price is set by scope, quality levels, services, layout, the building and what the contract includes, not by square metres. In the same 80 m² flat, our standard quote runs from 43,372 € at functional quality to 89,392 € at high quality: 2.06 times, without changing a single metre.
So when two quotes for the same flat look nothing alike, it is usually not because someone is misleading you. It is usually because they are not pricing the same job.
The same flat, three quotes
The same 80 m² flat, with the same bathroom, the same cloakroom and the same kitchen, comes to 43,372 €, 62,747 € or 89,392 € depending on quality. These are the three quality levels of our standard quote for that size, with identical items.
| Quality | Total | €/m² | Compared with functional |
|---|---|---|---|
| Functional | 43,372 € | 542 € | - |
| Medium | 62,747 € | 784 € | 1.45 times |
| High | 89,392 € | 1,117 € | 2.06 times |
Guide prices · VAT not included. Standard quote, not a binding offer: the fixed quote for your flat is drawn up after the free technical visit.
The items are the same in all three rows; what changes is what is inside each one. The five windows in the 80 m² example add up to 2,765 € at functional quality and 11,080 € at high quality. The complete kitchen costs 5,518 € or 14,961 €. Same opening, same kitchen, different product.
And that is only the first of six factors. The other five can move the price just as much or more, and none of them shows up when you look at the square metres.
The six factors
These are the six factors that separate two quotes for a home of the same size, each with its figure, taken from our price table and from our price-by-size pages:
- Scope. What is renovated and what is left. One quote may include a cloakroom of about 2 m² and the other not: that piece alone runs from 837 € at functional quality to 2,161 € at high quality, and rises quite a bit if there is no drain stack nearby. The same goes for windows or doors that one quote replaces and the other keeps.
- Quality levels. Functional, medium and high are three steps, and in 80 m² they separate 43,372 € from 89,392 €. If a quote just says «mid-range», you do not know which step it is on. That is why it is worth asking for a quality specification with the type of material and finish for each item.
- Original services. In a flat from the 60s-70s, renewing the services with their certificates can add 2,000-4,000 € compared with a home that already has them updated. A quote that says «electrical adaptation» and another that says «new installation with certificate» are not describing the same job.
- Layout. Removing a non-structural partition wall, with its rubble and finishing, runs from 1,030 € to 2,062 € depending on quality. Opening the living room to the kitchen when there is a load-bearing wall is a different league: an inspection opening, a lintel, a project and technical supervision add up to 1,500-3,000 €, not counting demolition or finishes, and the job then needs a technical project and site supervision (Building Act LOE, Law 38/1999 on Building Regulation) and a major works licence from the town hall.
- The building and access. In a block without a lift, materials go up and rubble comes down by hand, and that adds around 5-8 % to the job. If one quote counts it and the other does not, that is where the difference lies.
- What the contract includes. Site supervision, licences and technicians (from 106 € to 2,450 € depending on the procedure), waste management, protection of common areas, final cleaning and certificates. And VAT: our figures are the base without VAT; if one offer includes it and the other does not, they can no longer be compared.
An example with figures for factor five. In the functional 80 m² example, 5 % of 43,372 € is about 2,170 €, and 8 % is about 3,470 €. That money does not show in any finish: it is hours spent carrying sacks up the stairs.
Guide prices · VAT not included. None of these figures is a binding offer; the price of your works is fixed after the free technical visit.

How to tell which factor is moving your quote
Put the two quotes side by side and ask each the same six questions: the factor where the answers do not match is the one that explains the difference. The two quotes people most often bring us to «see if it is expensive» almost never include the same things. If you want to learn how to sort items, spot what is missing and understand what each line includes, this guide explains step by step how to read and compare a quote.
| Factor | The question |
|---|---|
| Scope | Are the same rooms being renovated, with the same bathrooms and cloakrooms, and are the same windows and doors being replaced? |
| Quality levels | Is there a quality specification with the material for each item, or just a range label? |
| Services | Are the electrics and plumbing new, with their certificate, or are the existing ones adapted? |
| Layout | Is any load-bearing wall touched? Who signs the project and who handles the technical supervision? |
| Building | Is it planned how materials go up and how rubble comes down? |
| Contract | Are site supervision, licences, waste and cleaning included? Does the price include VAT or not? |
If all six answers match and the prices are still apart, then you really are comparing like with like, and the difference lies with the company: margin, team or way of working. That is the only difference worth discussing.
One thing is not a factor of the works but does affect the final price: the type of quote. A fixed quote fixes the price of what is described; an open one leaves the final figure to whatever turns up. With the same scope, the open quote can look cheaper on paper and not be once the job is finished.
Frequently asked questions about different quotes for the same flat
Why are two quotes for the same flat so different?
Because they almost never price the same job. The scope, quality levels, condition of the services, layout, access to the building and what the contract includes all change. On quality alone, our standard 80 m² quote runs from 43,372 € at functional quality to 89,392 € at high quality, as a guide and base without VAT: 2.06 times with the same square metres.
What should a quote include to be comparable?
The same rooms and wet areas, a quality specification for each item, the scope of the services with their certificates, any layout change with its procedure, access to the building and a clear list of what is included: site supervision, licences, waste and cleaning. And both must say whether the price includes VAT or not.
How much more does renovating a flat without a lift cost?
On our price pages we put it at around 5-8 % of the job, because materials go up and rubble comes down by hand, and that is hours of work that do not show in any finish. The bigger the flat, the more rubble comes out. A sound quote counts it from the start, not as an extra.
Further reading
If you have two quotes on the table and do not understand the difference, follow this order.
- How to read and compare a renovation quote - how to compare the two documents, line by line.
- Fixed vs open quotes in renovations: what they are and why they matter - why the type of quote changes who bears the risk.
- Why a renovation does not cost double with double the square metres - the other side of the problem: when what changes is the size.
- Which rooms push up renovation costs: bathrooms and kitchen versus bedrooms - why one extra cloakroom weighs so much in the total.
- Renovating an 80 m² flat in Barcelona: 2026 prices - the standard 80 m² quote at the three quality levels, item by item.
- Full home renovations in Catalonia - how a full renovation works, from the visit to the end of the works.
Sources
Keep reading
Functional, mid-range or high quality: what changes in each item of a renovation
Quality shows in what you see and touch, not in what is hidden. We show you, item by item, where the price rises and where spending more is not worth it.
Prices and quotesUsable or built area: which one to use when budgeting your renovation
Floors, paint and tiling are measured inside the walls. If a quote uses the square metres on the deeds, its price per metre can no longer be compared.
Prices and quotesWhich rooms make a renovation more expensive: bathrooms and kitchens versus bedrooms
A square metre of bathroom costs about 15 times a bedroom's, and a kitchen's about 3.5 times. Here is the calculation for each room, with the bedroom broken down.