Prices and quotes

Which rooms make a renovation more expensive: bathrooms and kitchens versus bedrooms

A square metre of bathroom costs about 15 times a bedroom's, and a kitchen's about 3.5 times. Here is the calculation for each room, with the bedroom broken down.

By the Tu Nuevo Piso teamPublished 4 November 20267 min read
Renovated bathroom with a walk-in shower and a tidy bedroom in the background

Indicative prices · VAT not included. Not a binding offer.

Which rooms make a renovation more expensive?

The rooms that add most to the cost of a renovation are the bathroom and the kitchen. Per square metre, a full bathroom costs 2,564 € at functional quality and a full kitchen 613 €, against about 176 € for a bedroom: the bathroom is about 15 times more expensive per metre and the kitchen about 3.5 times.

These are guide figures, excluding VAT, calculated with our price table, which is built from real quotes. The bathroom and kitchen figures come straight from it; the bedroom has been put together item by item, and the calculations are below so you can redo them.

Key points

  • A full bathroom of about 4 m² costs 10,255 € at functional quality: 2,564 € per square metre.
  • A full kitchen of about 9 m² costs 5,518 € at functional quality: 613 € per metre.
  • A standard 10 m² bedroom, with floor, walls, ceiling and door, costs 1,760 €: 176 € per metre.
  • Per metre, the bathroom costs about 15 times the bedroom, and the kitchen about 3.5 times.

Euros per square metre for each room

A square metre of bathroom is the most expensive in the flat at all three quality levels, and a square metre of bedroom is the cheapest of the three. Here is the comparison, with the total for each room and the cost per metre:

RoomFunctionalMid-rangeHigh
Full bathroom (about 4 m²)10,255 € (2,564 €/m²)15,759 € (3,940 €/m²)20,467 € (5,117 €/m²)
Full kitchen (about 9 m²)5,518 € (613 €/m²)7,650 € (850 €/m²)14,961 € (1,662 €/m²)
Standard bedroom (10 m²)1,760 € (176 €/m²)2,505 € (250 €/m²)2,790 € (279 €/m²)

Guide prices · VAT not included. This is not a binding offer: the fixed quote for your renovation is given after the free technical visit.

The last row is the one almost nobody publishes, so here is how it is calculated. The standard bedroom is built from three items in our price table: laminate flooring, skim and paint, and a door.

ItemQuantityFunctionalMid-rangeHigh
AC5 laminate flooring10 m²370 €430 €480 €
Skim and paint for walls and ceiling30 m²1,140 €1,500 €1,530 €
Interior door1 unit250 €575 €780 €
Total1,760 €2,505 €2,790 €

The 30 m² of wall and ceiling surface come from a fixed rule: we count 3 m² of wall and ceiling for every m² of floor, the same rule used by our price pages by flat size. At functional quality, skim costs 15 € per metre and paint 23 €, so each metre of surface is 38 €. At mid-range they are 24 € and 26 €; at high quality, 25 € and 26 €.

Note what is left out: no electrics and no window, because in our standard quotes both are items for the whole home. Even if you charge the bedroom with the electrical work for one room, 223 € at functional quality, the cost per metre stays below 200 €. The gap with the bathroom is still there.

And it does not narrow as quality goes up. At mid-range, a metre of bathroom costs 3,940 € against 250 € for the bedroom; at high quality, 5,117 € against 279 €.

Why wet rooms weigh so much

They weigh so much because they pack into a few metres everything that is paid for per unit: fittings, taps, water points and drains. A bedroom is priced almost entirely by area; a bathroom mainly by pieces.

Look at the unit prices in our price table at functional quality. A toilet, 108 €. A vanity unit with basin, 96 €. A shower tray or a screen, 183 €. Shower taps, 220 €. Each plumbing and drainage point, 260 €. Then comes the building work: waterproofing, wall tiling and drains down to the stack.

In the bedroom, the most expensive piece is the door, 250 € at functional quality; the rest is flooring at 37 € per metre and wall surface at 38 €. In the bathroom, four square metres carry the toilet, basin, shower, taps, water supply, waterproofing and tiling. Divide all that by four and you get 2,564 €.

There is another difference that does not show in the table. A bedroom that turns out so-so can be fixed with another coat of paint. A wet area that is badly waterproofed cannot be fixed: it has to be taken up.

The kitchen sits in the middle. It concentrates money in the units and worktop (in our price table, 2,565 € and 1,640 € at functional quality), but it has fewer sanitary fittings than a bathroom and spreads its cost over more metres.

Its per-metre figure has a catch: our price table gives the same full kitchen for 6, 9 or 12 m², so in a small kitchen the cost per metre is well above that 613 €. To understand why the price per metre misleads in small rooms, see Fixed and variable costs, which explains which items do not depend on square metres.

Newly fitted kitchen with grey handleless units and a stone worktop
Per metre, the kitchen costs about three and a half times a bedroom.

What this means for your budget

It means the budget is decided in the bathroom and the kitchen, and that cutting back in the living room or bedrooms moves little money. When an owner asks to cut costs, they almost always look at the living room first, and the money is in the bathroom.

The figures make it clear. Taking a bedroom from functional to high quality moves it from 1,760 to 2,790 €. Taking the bathroom from functional to mid-range, a single step, moves it from 10,255 to 15,759 €. If you want to treat yourself to nicer finishes, in a bedroom it comes cheap; in the bathroom, each step is expensive.

Is it worth spending more on the bathroom than on the living room? It is worth spending well on the bathroom, which is not the same thing. It is where the money is anyway and the room that costs most to redo, so that is where we would not cut waterproofing or installations.

Where there is room to save is in the scope: moving the kitchen to another wall adds 2,212 € at functional quality (guide price, excluding VAT) on top of its price, and leaving it where it is saves all of that.

And one consequence for comparing quotes: the number of bathrooms moves the price per metre of the whole flat. In our standard quotes, a 90 m² flat with a bathroom and a toilet room comes to 506 € per metre at functional quality, and a 100 m² one with two full bathrooms to 590 €. Before comparing euros per metre, count the bathrooms.

Frequently asked questions about the cost of each room

What is the most expensive part of a flat renovation?

Per square metre, the bathroom. In our price table, a full bathroom of about 4 m² costs 10,255 € at functional quality, 2,564 € per metre, against 613 € for the full kitchen and about 176 € for a bedroom, excluding VAT. The order of items in total euros depends on the size of the flat and the scope.

How much does it cost to renovate a bedroom?

A standard 10 m² bedroom, with AC5 flooring, skim and paint on about 30 m² of walls and ceiling and a new door, costs 1,760 € at functional quality, 2,505 € at mid-range and 2,790 € at high quality, excluding VAT. That is 176, 250 and 279 € per metre. It does not include electrics or a window.

How much more does a bathroom cost than a living room?

Per metre, about 15 times more than the standard bedroom, and a living room without new installations is priced with similar items: flooring, skim and paint. The bedroom comes to 176 € per metre at functional quality; the full bathroom to 2,564 €, because it packs fittings, taps, water supply, waterproofing and tiling into about 4 m².

Why is a kitchen cheaper per metre than a bathroom?

Because it has fewer sanitary fittings and spreads its cost over more metres. A full kitchen of about 9 m² costs 5,518 € at functional quality, 613 € per metre, against 2,564 € for the bathroom. But our price table gives the same kitchen figure for 6, 9 or 12 m², so in a small kitchen the cost per metre is higher.

If you want to follow the money in your renovation room by room, this is the order we recommend.

Keep reading

✆ Call✦ WhatsAppGet a quote →