Calculated item by item with our price table for a 90 m² flat with 3-4 bedrooms, a full bathroom, a guest WC and a 9 m² kitchen: 45,558 € at a functional specification, 65,453 € at mid-range and 92,578 € for high specification, excluding VAT; the cards above wrap them in the indicative range our calculator uses. And here is the fact that makes this size unusual: 506 €/m² is the lowest price per metre in our whole flat series, below the 80 m² figure and, as you will see, below the 100 m² one too.

Standard finishes, layout unchanged
Selected materials, possible re-planning
Premium materials and interior design
Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.
The 90 m² flat in the Barcelona area comes in two very different flavours. One is the seventies block with 3-4 bedrooms, a bathroom, a WC and a 9 m² kitchen. The other, more interesting, is the small grand period flat: the principal floor of a 1900–1930 building in Gràcia, Poble-sec, Sant Andreu or the old town of Vic, with ceilings over three metres, Catalan vaults, balcony doors and a corridor that runs the length of the home.
Both share what matters for the budget: seven rooms, seven doors, five windows and two wet rooms, but only one of them full. That combination — generous floor area and a single shower to waterproof — is exactly what puts 90 m² at the bottom of the €/m² curve.
The difference between the two flavours is not in the base cost but in the corridor: in the modern block it is three or four metres long, and in the period flat it can take ten square metres of the home.

Figures calculated item by item from our price table (real, signed quotes), for a 90 m² scope with 3-4 bedrooms, a full bathroom, a guest WC and a kitchen. Excluding VAT; not a binding offer. Your quote comes itemised and fixed after the free technical visit.
| Item | Functional | Mid-range | High spec | % of total |
|---|---|---|---|---|
| Demolition and rubble clearance · floor lifted + strip-out | 1,708 € | 2,284 € | 5,004 € | 3% |
| Building work and labouring | 2,912 € | 2,991 € | 3,377 € | 5% |
| Plasterboard and suspended ceilings (~36 m²) | 1,656 € | 1,944 € | 2,340 € | 3% |
| Plumbing (adaptation + 10 points) · bathroom, WC and kitchen | 3,006 € | 4,168 € | 5,795 € | 6% |
| Electrics (7 rooms) · with certificate (CIE) | 1,561 € | 2,226 € | 3,843 € | 3% |
| Complete bathroom (~4 m²) · building work + tiling + sanitaryware | 10,255 € | 15,759 € | 20,467 € | 24% |
| Second WC (~2 m²) · toilet, basin and tiling | 837 € | 1,286 € | 2,161 € | 2% |
| Complete kitchen (~9 m²) · units, worktop and appliances | 5,518 € | 7,650 € | 14,961 € | 12% |
| Flooring throughout (AC5 timber laminate) | 3,330 € | 3,870 € | 4,320 € | 6% |
| Internal joinery (7 doors) | 1,750 € | 4,025 € | 5,460 € | 6% |
| Windows (5 units) · if you keep yours, subtract this line | 2,765 € | 5,750 € | 11,080 € | 9% |
| Skimming and full repaint · ~270 m² of wall and ceiling surface | 10,260 € | 13,500 € | 13,770 € | 21% |
| Total for the example budget | 45,558 € | 65,453 € | 92,578 € | |
| Equivalent per m² | 506 €/m² | 727 €/m² | 1,029 €/m² |
In this page’s functional budget, kitchen, bathroom, WC, plumbing and electrics come to 21,177 €: 46% of the total. That is the lowest share of any flat size we have published — at 50 m² it is around 60% and at 60 m², 54%. There are more metres of bedroom and corridor spreading the weight of the expensive parts, and still only one shower to waterproof.
Put the other way round: here 54% of the budget — 24,381 € — goes on demolition, building work, flooring, painting, plasterboard, joinery and windows, that is, on what you see and walk on. Painting alone is 10,260 € — some 270 m² of wall surface — more than double plumbing and electrics together. It is rare for the money in a renovation to be spread so well towards what you actually enjoy.
From here the curve breaks: in 100 m² two full bathrooms fit and the metre rises again. If you are choosing between two flats and one is 90 m², the renovation is an argument in its favour.

In a 90 m² flat in an old building, the central corridor can be twelve metres long by ninety centimetres wide. That is almost eleven square metres — one in every eight of the home — that you paint, floor, light and pay for, and where nobody ever stays.
That corridor is also the juiciest variable item in the budget. The 10,260 € of painting and the 3,330 € of flooring on this page include its surface; redesigning it does not remove them, but it does decide whether that money ends up in a corridor or inside the rooms. There are three ways forward, and all three are legitimate:
Absorb it: remove the corridor by sharing its metres between the neighbouring rooms. It gains the most usable floor area and demands the most demolition and new partitions. Make it earn its keep: leave it where it is and line one whole side with floor-to-ceiling built-in wardrobes; in 80 cm of depth there is room for four linear metres of storage that then does not have to go into the bedrooms. Make a feature of it: in a grand period flat with vaults, arches and mouldings, the corridor is what makes the flat look like what it is; it is solved with recessed lighting, good flooring and doors to match, as in the Barri Gòtic project in the photo.
What we do not recommend is the fourth option, the one we see most often: not deciding, painting it white and letting it carry on being a corridor. In 90 m² that is the most expensive square metre in the home, because it is the only one that does nothing.

The floor comes up (unless it is being restored, which is decided now), the bathroom and WC are stripped out and the partitions we can do without come down. Then the new corridor is set out. At 90 m² we estimate in the order of 11 m³ of rubble.
Plumbing with its 10 points for bathroom, WC and kitchen, electrics for the 7 rooms with a certificate, and the building work and plasterboard for the ~36 m² of suspended ceiling.
Waterproofing and tiling of the two wet rooms, fitting the 9 m² kitchen and laying the flooring throughout the home.
The seven doors, the fittings, skimming and painting some 270 m² of walls and ceilings, the final clean and a handover walk-round with the site manager.
11–12 weeks (full renovation) · ~4 weeks (update) — 11 to 12 weeks is the indicative estimate for a full 90 m² renovation — our own planning, not a figure from our price table: 2 for demolition, 4 for services and building work, 3 for wet rooms, kitchen and flooring, and 2-3 for joinery, painting and snagging. In a period flat allow a week more: high ceilings mean working from internal scaffolding, and the original plaster is not quickly repaired. To calibrate it against real timescales: our 85 m² project in Granollers, brought up to date with the terrazzo polished, took 4 weeks; the 75 m² one in Vic, a full renovation with made-to-measure joinery, took 10. The programme comes in writing with the quote.
Permits: what a 90 m² flat needs. For internal work that does not touch the structure, a prior notification to the council is enough. What is specific to this size is that many 90 m² flats are in buildings from before 1936, and two more things come in there. If the building has any degree of protection — common in Ciutat Vella, Gràcia and the old towns of the Vallès — any intervention on listed elements, balcony doors and façade joinery included, needs specific authorisation and sometimes a heritage report. And if the corridor is redesigned by touching a load-bearing wall, a project, a lintel calculation and a major-works licence are needed. We check it on the visit, we handle the paperwork ourselves and the cost appears as its own line in the quote.
Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.
This is the most interesting table in the whole series. From 80 to 90 m² the price per metre falls, as logic says it should. From 90 to 100 m² it rises again — and not because the work is any worse, but because in 100 m² two full bathrooms fit instead of a bathroom and a WC. We explain it in full on the 100 m² page.
| Floor area | Functional | Mid-range |
|---|---|---|
| 90 m² flat (3-4 bedrooms, bathroom and WC) | 45,558 € · 506 €/m² | 65,453 € · 727 €/m² |
| 80 m² flat (3 bedrooms, bathroom and WC) | 43,372 € · 542 €/m² | 62,747 € · 784 €/m² |
| 100 m² flat (4 bedrooms, 2 full bathrooms) | 58,968 € · 590 €/m² | 85,767 € · 858 €/m² |
* Indicative prices, excluding VAT. They vary with the starting condition of the home, the municipality and the finishes chosen.
Carrer d’Anselm Clavé, Granollers85 m²4 weeksReal projectRefresh of a flat in Granollers (85 m²)Five square metres smaller than this page’s example flatThe original terrazzo polished rather than liftedBlack-lacquered doors, light paint and track spotlightsBelow the example budget: the services were not touchedIndicative costindicative · excluding VAT15,000–17,000 €
Carrer de Verdaguer, Vic75 m²10 weeksReal projectFull renovation of an old-building flat in Vic (75 m²)Fifteen square metres smaller and a 30% bigger billA slatted screen and pine-slat partitions, made to measureA green herringbone-tiled bathroom and a grey metro-tile kitchenWorkshop-made joinery throughout the flat: that is where the difference liesIndicative costindicative · excluding VAT59,500–62,000 €The ones we are asked most before a quote is signed.
The example budget on this page comes to 45,558 € at a functional specification, 65,453 € at mid-range and 92,578 € for high specification, excluding VAT, for a scope of 3-4 bedrooms, a full bathroom, a WC and a kitchen. Keeping the five windows, the functional figure falls to 42,793 €. The figures come from our price table, calculated item by item.
Because it is the point where there is already plenty of “cheap” floor area — bedrooms and corridor — spreading the cost of the expensive rooms, and still only one shower to waterproof. The items that do not depend on floor area are 46% of the total, the lowest share in the series, and the result is 506 €/m² at functional. From 100 m² the metre rises again, because a second full bathroom comes in.
The base budget, little: the items are the same. What changes is the setting. Three-metre ceilings mean more wall surface to paint and internal scaffolding; plaster and mouldings are reproduced rather than covered; hydraulic-tile flooring, if sound, is restored and that is decided before demolition; and if the building is listed, the façade joinery needs specific authorisation. We assess all of it on the visit, not over the phone.
There are three reasonable ways out: absorb it by sharing its metres between the neighbouring rooms, make it earn its keep with floor-to-ceiling built-in wardrobes along one side, or keep it as a feature if the building deserves it, solved with recessed lighting and good flooring. What does not work is not deciding: in a 90 m² flat the corridor can be one in every eight square metres of the home.
In this page’s example budget, the second wet room of about 2 m² comes to between 837 € at functional and 2,161 € at high specification, with toilet, basin, taps, fitting and tiling. It is cheap because it is small and because, on a 90 m² floor, it almost always lands near an existing stack. If the drain had to be run far, the figure rises, and we tell you before you sign.
Not all the way through: there are four weeks without water or a kitchen. It is workable in phases if one of the two wet rooms stays in use while the other is redone, which is precisely an advantage of having a bathroom and a WC. It does not work out cheaper per metre, but it saves you temporary rental. We tell you on the visit which phases are compatible.
No: all prices on this page exclude VAT, as in our quotes. The applicable rate (10% reduced or 21%) depends on your case — private use, age of the building and the weight of materials — and we confirm it in writing in the quote.
Full renovations in Barcelona and across Catalonia. A fixed, itemised quote, a dedicated site manager who keeps you informed and a written warranty.
A free site visit, a fixed itemised quote and a written programme. What we sign is what you pay.