Full renovation of a flat in an old building in Vic
Carrer de Verdaguer, Vic · 75 m² · 2026

Project details
- Floor area
- 75 m²
- Property type
- Flat
- Duration
- 10 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 59,500–62,000 €
- What we did
- Pine-slat partitions · Laminate flooring · New kitchen with grey metro tile · Bathroom with green herringbone tile and a black screen · Recessed spotlights · Painting of walls and ceilings
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A flat in an old building solved with pine-slat partitions, a green herringbone bathroom and a grey metro-tile kitchen.
Instead of closing off the entrance with solid partitions, this flat was organised with pine-slat screens: they separate the hall from the living room without taking away a ray of light, and the gesture is repeated in the matching shelving. It is the kind of joinery that lets a flat in an old building breathe like a current one without ceasing to be what it is.
The bathroom went for herringbone green with a round backlit mirror and an oak unit; the kitchen, for a grey metro tile with a stone-effect worktop that stands up to daily use without asking for care. The bedrooms were left in light grey with laminate, and the building’s brick-vault balconies stayed where they were.
A full renovation in Vic that respects the building without living in the past: noble materials where you touch and calm colours where you live.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.










