Completed

Flat renovation with a terrazzo floor in Granollers

Carrer d'Anselm Clavé, Granollers · 85 m² · 2026

The living room with the polished terrazzo, track spotlights and a black pendant light

Project details

Floor area
85 m²
Property type
Flat
Duration
4 weeks
Year
2026
Status
Completed
Budget
15,000–17,000 €
What we did
Original terrazzo ground and polished · Existing doors lacquered black, glazed panels included · Walls and ceilings painted white · White skirting boards · Track spotlights and a pendant lamp · Reading wall lights

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Instead of covering the terrazzo, it was polished and made the star: doors lacquered black, light paint and track spotlights.

This flat had what many people cover with a floating floor: an original terrazzo in good condition. The brave decision was to keep it — it was ground and polished until the grain came back, and everything else was thought out to go with it.

The original doors were not replaced: they were lacquered black, glazed panels included, and went from being a budget problem to being the detail that orders the whole flat. Off-white walls, track spotlights in the passageways and the odd wall light where reading light was needed.

It is a renovation that gets a great deal out of every euro: without touching the layout or the hidden services, the flat changed decade while keeping just what gave it character. A flat renovation in Granollers that shows that modernising is not erasing.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.