Prices and quotes

How much does it cost to add a second bathroom to a flat (and where to put it)

2 m² cloakroom: 837-2,161 €. 4 m² full bathroom: 10,255-20,467 €. The toilet decides the location: the CTE allows it 1.00 m from the soil stack at most.

By the Tu Nuevo Piso teamPublished 4 November 202611 min read
Small newly renovated cloakroom with wall-hung toilet, compact basin and light tiling

Indicative prices · VAT not included. Not a binding offer.

How much does it cost to add a second bathroom to a flat?

Adding a second bathroom to a flat costs between 837 € and 2,161 € for a roughly 2 m² cloakroom toilet with a soil stack nearby, and between 10,255 € and 20,467 € for a roughly 4 m² full bathroom, depending on quality and always before VAT. What drives the bill is not the tiling or the sanitaryware: it is the distance to the soil stack.

Both figures come from our price table, built from real quotes. The first is a cloakroom with toilet, basin, taps, fitting and tiling; the second, a bathroom with building work, tiling, sanitaryware and shower. The cost of bringing water and waste to them is the part that changes from one flat to another.

Key points

  • A cloakroom of about 2 m² costs 837 € in basic quality, 1,286 € in mid-range and 2,161 € in high-end, with a soil stack nearby.
  • A full bathroom of about 4 m² costs 10,255 €, 15,759 € or 20,467 €: in basic quality, more than twelve times the cloakroom.
  • CTE DB-HS 5 wants the toilet connected to the soil stack directly or with a branch of 1.00 m at most, and that is why the toilet decides where the bathroom goes.
  • Decret 141/2012 requires the bathroom to be a separate room that does not serve as a passage to other rooms.
  • A bathroom without a window is possible with mechanical extraction through a duct, as CTE DB-HS 3 provides.

Cloakroom or full bathroom: the two figures

A cloakroom costs between 837 € and 2,161 €; a full bathroom, between 10,255 € and 20,467 €. The difference is the shower and everything it brings: twice the surface area, more tiling, a shower tray or screen, its taps and the waterproofing of the wet area.

ItemWhat it includesBasicMid-rangeHigh-end
Cloakroom (about 2 m²)Toilet, basin, taps, fitting and tiling837 €1,286 €2,161 €
Full bathroom (about 4 m²)Building work, tiling, sanitaryware and shower10,255 €15,759 €20,467 €

Guide prices · VAT not included. Not a binding offer: the fixed quote comes after the free technical visit. The cloakroom figure comes from our standard 80 and 90 m² quotes, with a soil stack nearby; the full bathroom is the "full bathroom renovation" item of our price table, calculated from three jobs.

The cloakroom figure assumes a soil stack nearby. If there is one, the cloakroom is a small item within any renovation. If there is not, the price rises considerably, and the reason has nothing to do with the tile you choose.

In our standard quotes, the cloakroom appears from 80 m²: the 70 m² flat has a single bathroom, the 80 and 90 m² ones have a bathroom and a cloakroom, and the 100 m² one already has two full bathrooms. That is why the second bathroom question comes up right at 70 m².

What decides the cost: the distance to the soil stack

The cost is decided by the distance between each fitting and the soil stack, because the CTE DB-HS, in its drainage section (DB-HS 5), sets how far each waste pipe can run:

  • Toilet: directly to the soil stack or with a branch connection of 1.00 m at most.
  • Siphon box: 2.00 m at most from the soil stack.
  • Basins, sinks and bidets with an individual trap: up to 4.00 m from the soil stack.

These are DB-HS 5 values, and the technician confirms them on the plan of your flat. The practical reading is immediate: the basin has leeway and the toilet almost none. The toilet decides where the bathroom goes; everything else is placed around it.

In flats from the 60s and 70s in the metropolitan area, the second bathroom is almost always decided by looking at where the building's soil stack is, and the layout plan comes afterwards.

Can you build a bathroom where there is no soil stack? The basin can be far away; the toilet cannot.

If no soil stack is within one metre of the toilet, the way out (moving it next to another stack or putting the fitting somewhere else) is decided by the technician on the plan and, if the building's stack has to be touched, together with the owners' community. Moving the toilet within an existing bathroom runs into the same rule.

When the soil stack is close but the water is not, the difference is paid for in network items. These are the unit prices from our price table:

ItemUnitBasicMid-rangeHigh-end
Plumbing and drainage pointunit260 €364 €511 €
Plumbing adaptationitem406 €528 €685 €
Valves and waste pipesunit58 €58 €67 €
Bricklaying assistanceitem320 €399 €641 €
Electrical point or switchunit23 €25 €30 €

Guide prices · VAT not included. Unit prices, not a binding offer.

An example with figures, in basic quality: a cloakroom with the toilet next to a soil stack but no water supply nearby. To the 837 € cloakroom you add two new plumbing points (2 × 260 = 520 €), the network adaptation (406 €), valves and waste pipes (58 €) and bricklaying assistance for chasing and pipe runs (320 €).

That is 1,304 € of network, more than the cloakroom itself. The total rises to 2,141 €, and the tile has not changed.

That calculation does not include the mechanical extraction that a windowless cloakroom needs, or the lighting. Electrical points are cheap; what matters in a bathroom is where they go, because of the electrical protection zone.

Bathroom under construction with new waste and water pipes running to the soil stack
What decides the cost of a new bathroom: the distance to the soil stack.

Where to put it: five places that usually work

The places that work are those close to a soil stack or to a wet area that already exists. These are the five usual ones, each with its catch:

  1. Wall to wall with the current bathroom. The new cloakroom shares the soil stack and pipe runs with the bathroom you already have, so the network barely lengthens. The catch: on the other side of that wall there has to be something you can give up.
  2. Next to the kitchen or the utility balcony (galería). These are the places in the flat where there is usually water and waste already. The galería brings two conditions: if it is part of the façade or a common element, its enclosure is not touched without checking the community statutes; and since the bathroom cannot be a passage to other rooms, the cloakroom cannot become the way to the clothes-drying area.
  3. A wardrobe or storage room next to a wet area. A cloakroom of about 2 m² fits in spaces that today hold coats and suitcases. Take care if the wardrobe belongs to a bedroom: under new-build conditions, Decret 141/2012 requires each bedroom to have its own storage space.
  4. A stretch of corridor. A long hallway hides metres that nobody uses. It works if the soil stack passes nearby; if not, the toilet rules and the corridor stays as it is.
  5. A corner of the main bedroom. This is the en suite: the bathroom opens from the bedroom, which is not the same as serving as a passage to another room. It has its own requirements and cost, and we cover it separately.

If the place you have in mind requires moving partition walls, count that item too: the layout change has its own price, which is added to that of the bathroom.

What the regulations require

The regulations ask four things of a second bathroom: that it drains within the DB-HS 5 distances, that it is ventilated, that it is a separate room and that the work is processed. The distances are covered above; the rest is as follows:

RuleWhat it requiresWhat it means for your work
CTE DB-HS 3 (air quality)Ventilation in wet rooms: bathrooms, toilets and kitchensA windowless cloakroom is solved with mechanical extraction through a duct
Decret 141/2012 on habitabilityThe hygiene room (cámara higiénica) is a separate room and cannot be a passage to other roomsA cloakroom that serves as the way to the galería or another room is not valid
Decret 141/2012, new-build conditionsUp to three bedrooms, one toilet, one basin and a shower or bath; from four, two toilets and two basinsWith four bedrooms, the second toilet and second basin stop being optional
Decret 141/2012, art. 9Certificate before occupying a home whose habitability conditions have been alteredIf the number of bathrooms changes, the technician assesses whether a new habitability certificate (cédula de habitabilidad) must be processed

Is a bathroom without a window legal? Yes, if it is ventilated. CTE DB-HS 3 solves it with mechanical extraction through a duct, and Decret 141/2012, for homes built before 1984 (Annex 2), accepts ventilation to the outside, either direct or through a duct with mechanical activation. The route and power of the extractor are set by the technician for your case.

Do you need a licence? If the new bathroom does not affect the structure or the façade, a prior works notification to the town hall is enough (in Barcelona, depending on the case, assabentat or notification). If making room for it means opening a load-bearing wall, a technical project and site supervision are required, under Law 38/1999 on Building (LOE), and a major works licence (obra mayor) from the town hall.

In our real quotes, the "Licences and technicians" item runs from 106 € to 2,450 € depending on the procedure (guide price, before VAT), and it always appears as a separate item.

Then there is the owners' community. If the work affects the community soil stack, which is a common element, check the statutes before opening anything: touching common elements may require the agreement of the owners' meeting, with the majority set by law and the statutes (in Catalonia, Book Five of the Codi civil).

When it is worth it and when it is not

It is worth it when there is a soil stack to hand and a space that is not earning its keep today. It is not worth it when freeing the space costs you a bedroom or means running the network from one end of the flat to the other.

The 70 m² flat is the borderline. On a standard quote of 38,803 € in basic quality (guide price, before VAT), a cloakroom of 837 € is a small line: what is expensive is not the cloakroom, it is the 2 m² you take from another room.

Our rule for 70 m² is simple. Cloakroom, yes, if it comes from a wardrobe, the galería or a stretch of corridor with the soil stack nearby. Full bathroom, only if it does not also eat into a bedroom.

With four bedrooms the question changes, because under new-build conditions the decree already requires two toilets and two basins. And if you are unsure between a cloakroom and a full bathroom, keep the proportion in mind: in basic quality, the full bathroom costs more than twelve times the cloakroom. That shower has to earn the difference through everyday morning use.

What is not cut in either case is the waterproofing of the wet area. A cheap bathroom that leaks into the neighbour below ends up costing twice.

Frequently asked questions about the second bathroom

How much does it cost to build a cloakroom toilet in a flat?

A cloakroom of about 2 m², with toilet, basin, taps, fitting and tiling, costs 837 € in basic quality, 1,286 € in mid-range and 2,161 € in high-end, before VAT, if there is a soil stack nearby. If there is not, network items are added: each plumbing point costs 260 € in basic quality and the network adaptation, 406 €.

Can you add a bathroom far from the soil stack?

The basin, yes: with an individual trap it can be up to 4.00 m from the soil stack, according to CTE DB-HS 5. The toilet, no: it has to connect directly or with a branch of 1.00 m at most. If no soil stack is that close to the toilet, the technician decides on the plan whether to move it to another stack or put the fitting elsewhere.

Do you need a licence to build a second bathroom?

If the work does not affect the structure or the façade, a prior works notification to the town hall is enough. If a load-bearing wall has to be opened, a technical project, site supervision and a major works licence are required. And if the number of bathrooms changes, the technician should assess whether a new habitability certificate must be processed, under Decret 141/2012.

Is a bathroom without a window legal?

Yes, if it is ventilated. CTE DB-HS 3 requires ventilation in wet rooms, and a windowless bathroom achieves it with mechanical extraction through a duct. Decret 141/2012, for homes built before 1984, also accepts ventilation through a duct with mechanical activation. The duct route and the extractor are defined by the technician in each case.

Is a second bathroom worth it in a 70 m² flat?

It depends on where the soil stack is and which room you lose. In our standard quotes, the 70 m² flat has a single bathroom and the cloakroom appears from 80 m², so 70 m² is the borderline. An 837 € cloakroom in basic quality is worth it if it comes from a wardrobe or a stretch of corridor with a soil stack nearby; if it costs you a bedroom, it is not.

If you are thinking about a second bathroom, these articles run from the installation to the budget and the rules.

Sources

Keep reading

✆ Call✦ WhatsAppGet a quote →