Prices and quotes

From 80 to 100 m²: what really changes in a renovation budget

From 80 to 100 m² the functional budget rises by 15,596 €. The extra 20 metres add 4,372 €; the second full bathroom adds 9,418 €. Here are the numbers.

By the Tu Nuevo Piso teamPublished 3 November 202612 min read
Bright, spacious renovated flat with living room and long hallway towards a bedroom

Indicative prices · VAT not included. Not a binding offer.

How much more does it cost to renovate a 100 m² flat than an 80 m² one?

Renovating a 100 m² flat costs 15,596 € more than an 80 m² one at functional quality: from 43,372 to 58,968 € in our standard budgets, 36 % more for 25 % more floor area. At medium quality the difference is 23,020 € and at high quality 29,756 €, and in all three more than half of it comes not from the 20 metres but from the second full bathroom.

The nuance is in the scope. The 80 m² budget includes one bathroom and a guest toilet of about 2 m²; the 100 m² budget includes two full bathrooms. If you compare the two totals without looking at that line, you will draw the wrong conclusion about what the metres cost.

All figures come from our price table, which is built from real signed quotes. They are guide figures and base excluding VAT.

Key points

  • From 80 to 100 m² the functional budget rises by 15,596 €, from 43,372 to 58,968 €: 36 % more for 25 % more metres.
  • Swapping "bathroom plus guest toilet" for "two full bathrooms" explains 9,418 € of that difference, more than half.
  • The full kitchen does not move: 5,518 € at functional quality in both flats.
  • The items that truly depend on floor area (demolition, brickwork, plasterboard, flooring, screed and painting) add up to a 4,372 € difference at functional quality.
  • The functional cost per metre goes from 542 to 590 €: at 100 m² the flat costs more per metre than at 80 m².

The answer in figures: three quality levels

At any quality level, going from 80 to 100 m² raises the budget by quite a lot more than the metres grow. The table puts the two standard budgets side by side, calculated on the same basis: a full home renovation with new installations, full kitchen, flooring, doors, windows and painting.

Quality80 m²100 m²Difference€/m² at 80 m²€/m² at 100 m²
Functional43,372 €58,968 €+15,596 € (+36 %)542 €590 €
Medium62,747 €85,767 €+23,020 € (+37 %)784 €858 €
High89,392 €119,148 €+29,756 € (+33 %)1,117 €1,191 €

Guide prices · VAT not included. These are standard budgets, not a binding offer: the fixed price for your flat comes after the free technical visit, in a fixed quote broken down by item.

Look at the last two columns. The cost per metre rises at all three quality levels: from 542 to 590 € at functional, from 784 to 858 € at medium and from 1,117 to 1,191 € at high. This is the exception to the rule that the metre gets cheaper as the flat grows, a rule that has its own article and that we do not repeat here. If you want to understand why the cost does not double when you have double the metres, that article explains which items do not grow in proportion.

So, how much does it cost to renovate 20 m² more? It depends on what those 20 metres bring. If they bring a full second bathroom, 15,596 € at functional quality. If they do not, less than half of that.

Where the 15,596 € goes: item by item

Most of it goes to a single row, the bathrooms. This is the full comparison of the items in the two standard budgets: the first two columns give the functional amounts and the last three show how much each item rises at each quality level.

Item80 m² functional100 m² functionalFunctional diff.Medium diff.High diff.
Demolition and rubble removal1,504 €1,912 €+408 €+544 €+1,224 €
Brickwork and labour support2,624 €3,200 €+576 €+576 €+608 €
Plasterboard and false ceilings1,472 €1,840 €+368 €+432 €+520 €
Plumbing3,006 €3,786 €+780 €+1,092 €+1,533 €
Electrics1,561 €1,784 €+223 €+318 €+549 €
Full bathrooms10,255 €20,510 €+10,255 €+15,759 €+20,467 €
Guest toilet837 €0 €-837 €-1,286 €-2,161 €
Full kitchen5,518 €5,518 €0 €0 €0 €
Flooring (AC5 wood)2,960 €3,700 €+740 €+860 €+960 €
Interior joinery1,750 €2,000 €+250 €+575 €+780 €
Windows2,765 €3,318 €+553 €+1,150 €+2,216 €
Screed and full painting9,120 €11,400 €+2,280 €+3,000 €+3,060 €
Total43,372 €58,968 €+15,596 €+23,020 €+29,756 €

Guide prices · VAT not included. Standard budgets, not binding. The 100 m² one has no guest toilet: it has two full bathrooms.

In the functional difference column, only one row reaches five figures. The bathrooms go from 10,255 € to 20,510 € because the second full bathroom costs the same as the first; if you subtract the 837 € of the guest toilet that is no longer built, the net jump is 9,418 €. The remaining ten rows together add up to 6,178 €.

At medium and high quality the same happens with bigger numbers. The second bathroom adds 15,759 € and 20,467 €, and the guest toilet that disappears subtracts 1,286 € and 2,161 €. At all three quality levels, the bathroom row weighs more than all the others together.

Two renovated bathrooms side by side along the hallway of the same flat
The second full bathroom explains more than half of the jump from 80 to 100 m².

The second bathroom is the real jump, not the 20 metres

The second bathroom makes the jump because a full bathroom costs the same in a 100 m² flat as in a 60 m² one: 10,255 € at functional, 15,759 € at medium and 20,467 € at high quality, according to the "full bathroom renovation" item in our price table. It includes building work, tiling, sanitaryware and shower. None of that depends on the size of the living room.

The guest toilet in the 80 m² flat is a different piece: about 2 m² with toilet, basin, taps, fitting and tiling, without a shower. That is why it costs 837 € at functional quality and not 10,255 €. The difference between the two budgets is, at heart, the difference between those two pieces.

When we visit 100 m² flats, the owner's question is almost never "how much more do 20 metres cost?", but "shall we add another bathroom?". And they are right to put it that way, because that is where the money is.

Is a second full bathroom needed in 100 m²? The regulations do not require it. The Decret 141/2012 on habitability, under its conditions for new builds, requires one toilet, one basin and a shower or bath up to three bedrooms, and two toilets and two basins from four: one bathroom plus a guest toilet meets that. Which regime of the decree applies to your flat should be confirmed by a technician.

Watch out for a step that is often forgotten. If the renovation changes the number of bathrooms, it is worth asking the technician whether a new habitability certificate (cédula de habitabilidad) must be processed. Where to put the second bathroom, and how much it rises depending on how far away the soil stack is, we cover separately.

Our opinion, for what it is worth: with four bedrooms, or two people who shower at the same time, the second full bathroom is noticeable every day. If it is for guests, a guest toilet does the same job for a fraction of the price.

What grows with floor area and what stays the same

Five items grow with the metres and nothing else. The rest of the rise has another cause, or does not exist. Sorted by cause, the numbers for the step from 80 to 100 m² look like this:

  1. Grows with floor area: 4,372 €. Demolition (+408 €), brickwork (+576 €), plasterboard (+368 €), flooring (+740 €) and screed and painting (+2,280 €). These are the items that scale with the metres of floor, wall and ceiling.
  2. Grows with the number of pieces: 1,806 €. One more window (+553 €), one more door (+250 €), one more room to wire (+223 €) and three more water points (+780 €). They are paid per unit, not per metre.
  3. Grows with the scope: 9,418 €. The second full bathroom, minus the guest toilet that is no longer built.
  4. Does not grow: 0 €. The full kitchen, the same item in both flats.

So the 20 metres, as metres, cost 4,372 € at functional quality. The rest is a window, a door, a room, three water points and a bathroom.

Within what is floor area, the item that grows most is the one people look at least: screed and painting, 2,280 € more. It makes sense. Our standard budgets count about 3 m² of wall and ceiling for every m² of floor, so 20 m² more flat is about 60 m² more surface, at 15 € for screed and 23 € for painting per metre at functional quality.

The flooring is a direct calculation: 20 m² of AC5 wood at 37 € gives the 740 € in the table. Plumbing, on the other hand, rises by 780 € and not because of the metres. It is three more water points, from 10 to 13, at 260 € each at functional quality: points are counted by fixtures, and a flat with two full bathrooms has more fixtures.

The kitchen is the opposite case. In the 80 m² budget it measures about 9 m² and in the 100 m² one about 10 m², and the item is identical: 5,518 € at functional, 7,650 € at medium and 14,961 € at high quality. What moves the price of a kitchen is the units, the worktop and the appliances, not one more metre of floor.

If the budget rules: three decisions that cut it

The decisions that cut a 100 m² budget most have nothing to do with the metres. Before seeing which, a yardstick: in the same 80 m² flat, going from functional to high quality multiplies the budget by 2.06, while the extra 20 metres raise it by 36 %. The quality you choose weighs more than the size of the flat.

  1. Bathroom and guest toilet instead of two full bathrooms. With the other items unchanged, the functional total of the 100 m² flat falls by about 9,418 €, from 58,968 € to 49,550 €. At medium quality it would be 14,473 € less and at high quality 18,306 € less: the full bathroom of each quality level minus its guest toilet. It is the biggest decision and the only one that changes how you live in the home.
  2. Keep what is paid per unit. In the 100 m² budget, six windows add up to 3,318 € at functional and 6,900 € at medium quality, at 553 € and 1,150 € each; eight interior doors, 2,000 € and 4,600 €. Every window that insulates well and every door that can take a lacquer finish is a whole unit price that comes out of the budget.
  3. Leave the kitchen and bathrooms where they are. Moving the kitchen to another wall adds 2,212 € at functional, 2,929 € at medium and 4,161 € at high quality, on top of the price of the kitchen itself: new water points, chases, pipework to the soil stack, extraction outlet and electrical adaptation.

Guide prices · VAT not included. These are calculations on standard budgets, not a binding offer.

Something similar to the windows happens with the floor. In the flat in Granollers on Carrer d'Anselm Clavé, the original terrazzo was kept and polished instead of being taken up; in a 100 m² budget, new wood flooring is 3,700 € at functional quality.

What we would not cut under any circumstances: waterproofing in both bathrooms and the new installations with their certificate. If you receive a 100 m² quote well below these figures, first check what it says about installations, waterproofing and who runs the works.

Frequently asked questions about renovating an 80 or 100 m² flat

How much does it cost to renovate a 100 m² flat compared with an 80 m² one?

In our standard budgets, a 100 m² flat costs 58,968 € at functional quality, 85,767 € at medium and 119,148 € at high, compared with 43,372 €, 62,747 € and 89,392 € for the 80 m² one. The difference runs from 15,596 € to 29,756 €, base excluding VAT. The fixed price for your flat comes after the free technical visit.

Why does the price per metre go up at 100 m²?

Because the 100 m² standard budget includes two full bathrooms and the 80 m² one a bathroom and a guest toilet. A full bathroom costs the same in any flat, 10,255 € at functional quality, so the cost per metre goes from 542 to 590 €. With the same scope in both flats, the cost per metre would fall as the area grows.

Can I renovate a 100 m² flat with only one bathroom?

Yes, if it has up to three bedrooms. Decret 141/2012, under its new-build conditions, asks for one toilet, one basin and a shower or bath up to three bedrooms, and two toilets and two basins from four, which one bathroom plus a guest toilet already meets. Which regime applies to your flat should be confirmed by a technician.

Which item weighs most when going from 80 to 100 m²?

The bathrooms, by a long way. Going from a bathroom and a guest toilet to two full bathrooms adds 9,418 € net at functional quality, out of the 15,596 € that separate the two standard budgets. Next come screed and painting, with 2,280 €, and plumbing, with 780 €. The full kitchen does not change.

How much does it cost to renovate 20 m² more of flat?

It depends on what they bring. In our standard budgets, the items that grow only with floor area (demolition, brickwork, plasterboard, flooring, screed and painting) add up to 4,372 € at functional quality for 20 m² more. If those metres also bring a second full bathroom, the total difference rises to 15,596 €, base excluding VAT.

If you are comparing two flat sizes or deciding whether to add another bathroom, this is the order in which the questions tend to come up.

Sources

Keep reading

✆ Call✦ WhatsAppGet a quote →