Costa Brava renovations: detached houses, masías and second homes
Renovating a home on the Costa Brava means planning for sea air, the outdoor areas and a pool that is often the heart of the property, and co-ordinating the works even when you live far away. This is the full guide.
Indicative prices · VAT not included. Not a binding offer.
The Costa Brava is home to some of Catalonia's most charming properties: centuries-old stone masías (traditional stone farmhouses) in the inland Empordà, detached houses with sea views in Begur or Cadaqués, and second homes that are only lived in during the summer. Renovating them has little in common with renovating a flat in Barcelona. The challenge is not just aesthetic. It is the stone, the damp, the access, the distance and the seasonality. In this guide we explain how to approach a renovation on the Costa Brava without nasty surprises and with a result that suits the setting.
Why renovating on the Costa Brava is different
Three factors set it apart from an urban renovation. The first is the type of construction: stone rubble walls 50–70 cm thick, timber beam floors, and clay tile roofs laid on reed mats. The second is the climate: salt air that attacks window frames and railings, damp that rises through the walls of masías by capillary action, and strong temperature swings. The third is logistics: many sites are 1.5–2 hours from Barcelona, in old village centres with streets that lorries cannot reach, or in rural estates with no services nearby. All of this affects the price and, above all, the planning.
That is why a renovation here is more like a well-managed full renovation than a simple facelift. You have to understand the building before you touch it.
Renovating a masía: respecting the stone and solving the damp
The Empordà masía is a gem, but it is also a building that breathes differently. The usual mistake is to apply new-build solutions (cement, waterproof mortars, plastic paints) that seal the walls and trap moisture inside, causing salt deposits, flaking plaster and a stale smell. Good practice is the opposite: breathable lime mortars, perimeter drainage and cross-ventilation that lets the wall do its job.
Key items in a masía
- Wall and damp treatment: drainage, lime mortars and, sometimes, chemical damp-proof barriers injected against capillary rise.
- Reinforcing or replacing timber floors: treatment against wood-boring insects, or replacement with laminated timber or a mixed structure.
- Roof: a full check, insulation (often missing) and waterproofing under the tiles, keeping the original look.
- Thermal insulation: essential so the house can be lived in all year round without the bills going through the roof.
- Installations from scratch: electrical work to the Technical Building Code (CTE) and the REBT low-voltage regulations, plumbing and, almost always, efficient climate control.
To heat and cool a masía we almost always recommend aerothermal heating with underfloor heating. It is the option that works best with thick walls and large volumes, as we explain in our guide to aerothermal heating in renovations.
Renovating a detached house on the coast: salt, views and outdoor areas
Detached houses in Begur, Calella de Palafrugell, Llançà or Cadaqués suffer mainly from the marine environment. Salt corrodes low-quality aluminium, rusts fittings and railings, and calls for materials designed for the coast: aluminium window frames with thermal break and anti-corrosion treatment, high-performance glass that makes the most of the views without losing efficiency, and top-quality terrace waterproofing, because water and sun show no mercy. Here, the renovation of terraces and outdoor areas is often as important as the interior, because on the Costa Brava life happens outside.
And, of course, many clients use the renovation to build or refurbish a built-in swimming pool, which in these properties is practically a standard and a major factor in adding value.
Guide prices for renovation on the Costa Brava, 2026
Labour costs on the Costa Brava are comparable to those in the Barcelona area, but they rise because of travel, difficult access and the condition of older buildings. These are realistic turnkey ranges for 2026, given as guide prices excluding VAT:
| Type of work | Guide price 2026 |
|---|---|
| Full renovation of a detached house (mid-range finish) | 700 – 1,100 €/m² |
| Full rehabilitation of a masía | 1,000 – 1,800 €/m² |
| High-end renovation / sea views | 1,500 – 2,500 €/m²+ |
| Kitchen | 9,000 – 20,000 € |
| Full bathroom | 5,000 – 10,000 € |
| Terrace waterproofing | 90 – 180 €/m² |
| Climate control (aerothermal + underfloor heating) | 15,000 – 35,000 € |
The range is wide on purpose. A masía with timber floors to replace and structural damp can cost twice as much per m² as a detached house from the '90s that only needs updating. That is why we never quote without visiting the property.
Regulations, licences and rural land
Renovating on the Costa Brava adds layers of regulation that do not exist in an urban flat renovation:
- Municipal works licence: major works for masía rehabilitation; some municipalities have strict design by-laws to protect the traditional character.
- Non-developable land: many masías are on rural land, with limits on extensions and uses. Catalan planning rules give special protection to listed masías.
- Masía catalogue and heritage: if the property is listed, changes to the façade and volume need specific permits.
- Habitability certificate (cédula de habitabilidad): required to rent or sell a property, or to connect supplies. We explain when you need it in our guide to the habitability certificate.
- Coastal protection: homes close to the sea may be affected by the Coastal Law (Ley de Costas), with additional restrictions.
Sorting this out requires a technician who knows the terrain. At Tu Nuevo Piso we have a registered architect who handles the project and the licence. A second home managed from a distance needs solid guarantees, and a company that belongs to a trade body such as Greincat is one more thing to check. You are not on site every day, so you need to trust the person running the works.
Managing works from a distance: the challenge of a second home
The biggest worry for anyone renovating a second home is not being able to control the works because they live in Barcelona, Girona or abroad. We handle this with a clear method:
- A fixed plan before work starts: measurements, finishes and timescales defined in writing to avoid surprises.
- A fixed quote: no open items that rise when you are not there.
- A site manager as the single point of contact: one person answers for all the trades.
- Regular reports with photos and video: you follow progress from wherever you are.
- Payment milestones tied to work completed, not to the calendar.
It is the same approach to control and peace of mind that we apply in a turnkey renovation, and it is especially valuable when the house is two hours away from your day-to-day life.
Grants and energy efficiency
Older homes on the Costa Brava are strong candidates for energy rehabilitation grants. Improving insulation and window frames, and replacing boilers with aerothermal heating, can give access to significant subsidies and tax deductions. It is worth checking before you start, because many grants must be applied for in advance and require a minimum improvement in efficiency. We cover this in our guide to Next Generation grants and income tax (IRPF) deductions.
Frequently asked questions
How much does it cost to rehabilitate a masía in the Empordà?
A full rehabilitation usually falls between 1,000 and 1,800 €/m², and it can go higher if floors need replacing, the roof needs rebuilding or structural damp must be treated. The starting condition has a huge effect on the price, which is why we always visit the property before quoting.
Can you renovate a masía on rural land?
Yes, but with limits. Rehabilitation and maintenance are usually allowed. Extensions to the volume and changes of use depend on the municipal planning rules and on whether the masía is listed. A technician must check this before any design work begins.
How long does a renovation on the Costa Brava take?
A mid-range detached house: 3–5 months of works. A masía with structural intervention: easily 6–10 months, plus the time for the licence. Seasonality matters: it is best to have the works running in autumn and winter so you can enjoy the house in summer.
Do you work far from Barcelona?
Yes. We regularly work on the Costa Brava and in the Empordà, with a remote works system based on a fixed quote, a site manager as your single point of contact and regular reports, so you can follow everything without travelling.
Is renovating a second home a good investment?
Generally, yes. It improves comfort, reduces energy spending and adds a lot of value to the property, especially if it is intended for seasonal rental. A well-done renovation on the Costa Brava pays off both in enjoyment and in market value.
Conclusion
Renovating a detached house, a masía or a second home on the Costa Brava takes more than a good builder. It requires understanding the stone, beating the damp and the salt, mastering stricter regulations and being able to manage the works even when you are not there. At Tu Nuevo Piso we do this with a registered architect, a site manager and a fixed quote, so your home by the sea gains comfort and value without distance becoming a problem. Tell us about your property on the Costa Brava and, once we have visited it, we will prepare a fixed quote with no obligation.
Keep reading
Renovating a flat in Gràcia: old buildings, no lift and neighbours
How to renovate an old flat in Gràcia, Barcelona: carrying materials with no lift, structural defects, permits and getting on with the neighbours.
Renovations by areaRenovating a flat in Barri Gòtic: protected buildings and permits
Renovation guide for the Barri Gòtic and Ciutat Vella: Barcelona's heritage catalogue, deferred prior notifications and the structural challenges on site.
Renovations by areaRenovations in Sant Cugat del Vallès: houses and high-end flats
Sant Cugat has large houses with gardens and quality flats, where renovation focuses on comfort, energy efficiency and upper mid-range to high-end finishes. We explain prices, timescales and local specifics.

