Black cloakroom with a basin on wood in Terrassa
Carrer de Sant Pere, Terrassa · 7 m² · 2026

Project details
- Floor area
- 7 m²
- Property type
- Flat
- Duration
- 1 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 11,000–13,000 €
- What we did
- Black tiling · Basin on a wooden worktop · Backlit mirror · Decorative mosaic
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A small cloakroom that bets everything on one card: glossy black tiles, a porcelain basin on a wooden slab and a backlit mirror.
In a cloakroom of two square metres there is no room for half measures, so it went all in: glossy black tile grouted in white, which draws the grid and makes the room deeper than it is.
The basin is a white porcelain piece on an exposed wooden slab — the only warm material in the room, which is why it works — with a tall-spout tap. The backlit mirror provides the light on the face that an internal cloakroom does not have, and a strip of sparkling mosaic finishes the back wall.
Small, dark and with more personality than many large bathrooms: guest cloakrooms are the perfect place to be bold.
A bathroom renovation in the centre of Terrassa does not need many square metres to have personality: two well-played square metres are enough, as in this cloakroom.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.


