Bathroom with a corner bath and floral tiles in Sabadell
La Rambla, Sabadell · 6 m² · 2026

Project details
- Floor area
- 6 m²
- Property type
- Flat
- Duration
- 2 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 12,000–14,000 €
- What we did
- Corner bath · Tiling with a floral motif · Double basin · Glass screen
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A bathroom made for a long soak: corner bath, double basin and beige tiling with a wavy floral motif.
Not everyone wants a shower: here the owner was clear that the bath was staying, and in a big version. A corner bath was installed with a deck-mounted tap and a glass screen for the shower function, without giving up the long Sunday soak.
The tiling went for a soft beige with a wavy relief and floral-motif pieces placed with judgement — a classic nod without sliding into the granny bathroom. The double basin takes care of the mornings in a full house.
It is the kind of renovation that does not chase the catalogue photo but real comfort, which is why it will age well.
A bathroom renovation in the centre of Sabadell that keeps the bath? It can be done, and this room shows it: real comfort, with no catalogue photo.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.




