Renovations · Vacarisses

Full home renovations in Vacarisses: estate houses and old centre, with a fixed quote

We renovate in the Vacarisses settlements — Can Serra, Torreblanca, El Palà, Els Caus and the old centre — a municipality of detached houses at the western edge of the Vallès Occidental. A fixed written quote, the municipal permit handled for you and a single site manager.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Vacarisses
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Vacarisses
Warrantyon the work
Renovations in Vacarisses

Renovating in Vacarisses,
house by house.

Vacarisses is not divided into neighbourhoods of flats, but into more than fifteen settlements and estates — Can Serra, Torreblanca I and II, El Palà, Els Caus, La Coma, Bonavista… — as well as the old centre (nucli antic). That is why almost everything we renovate here is a house: a home with its plot, its roof and its relationship with the hillside. If you are looking for the price of a full renovation in Vacarisses, the answer depends on the square metres and the state of the envelope; in the price section of this page you have two complete examples worked out from our quotes, and the 120 m² house is the one closest to the typical home in the municipality.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Room at work in progress with one wall painted grey, a stepladder and parquet covered with protective paper
By type of building

Every house in Vacarisses calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Estate houses

Detached homes with a plot: we check roof, façade, joinery and services before touching the interiors.

02

Old-centre houses

Village houses in the original core, where structure, damp and light rule.

03

Outdoor space and terraces

Porches, retaining walls and plot access, coordinated with the work on the house.

04

Efficiency and climate control

Insulation, windows, aerothermal and photovoltaic for houses that use more than they should.

A municipality of settlements

Many settlements, one way of working

Vacarisses is made up of the old centre and a long list of estates — Can Serra, Torreblanca I and II, El Palà, Els Caus, La Coma, Bonavista, Carena Llarga… — rather than continuous neighbourhoods. That means travel between settlements, plot access and jobs that are planned around a lorry, a skip and materials stored inside the property.

We deal with it through a single site manager who visits the house before quoting, checks the access and puts the programme in writing. For larger houses, see also house renovations and detached-house renovations.

  • Free technical visit in any settlement
  • Access, skip and storage sorted before starting
  • Programme in writing
House renovations →
The detached house

The envelope first: roof, façade and windows

In an estate house, what weighs most on comfort and bills is the envelope. Before choosing a kitchen or a floor we check the roof, waterproofing, insulation and joinery, because that is where the leaks, damp and cold are that later spoil the new finishes.

When the house calls for it, we do in the same job the roof, the insulation and waterproofing, the aerothermal heating and the solar energy, with a single fixed quote.

  • Roof and waterproofing
  • Insulation and windows
  • Aerothermal and photovoltaic
Houses beside the hillside

The 25-metre strip and what it means for your job

Law 5/2003 on forest-fire prevention in residential estates requires estates and buildings in contact with forest land to keep a protective perimeter strip of 25 metres. Which plots are affected is confirmed for you by Vacarisses’ Ajuntament.

For a renovation, the practical thing is to bear it in mind when designing outdoor space, porches or extensions, and not to leave dry vegetation next to the house. We talk it over on the visit and, if a query to the Ajuntament is needed, we include it in the handling.

  • Prior query to the Ajuntament if your plot borders the hillside
  • Outdoor space designed with the surroundings in mind
  • Handling included in the quote
Licences and projects →
Close to Terrassa

A real job a few kilometres away: a cloakroom in Terrassa

Terrassa is the neighbouring city of reference. There we carried out a black cloakroom with a basin on wood: 7 m² and a week of work. It is not a job in Vacarisses, but it shows the level of finish we bring to the houses of the area.

If you would rather talk about your case, the steps are always the same: a visit, a quote fixed item by item and a single site manager. We also work in Terrassa and Matadepera.

See the Terrassa cloakroom →
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Prices

What it costs to renovate in Vacarisses.

Indicative ranges in Vacarisses, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Vacarisses — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Vacarisses

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Vacarisses.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Vacarisses.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Vacarisses settlements where we renovate.

The municipality is organised in separate settlements; these are the main ones.

We renovate mainly in:

Can Serra

The most populated settlement, where the Vacarisses Rodalies station (line R4) is.

Torreblanca I and II

An estate with its own R4 halt, Vacarisses-Torreblanca.

El Palà, Els Caus and La Coma

Estates of detached houses where the job usually includes the envelope and outdoor space.

Old centre

The original core, with village houses restored through their structure and services.

And also in:

Can SerraTorreblancaEl PalàEls CausLa ComaBonavistaCarena LlargaTerrassaMatadeperaMonistrol de Montserrat
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Vacarisses: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Vacarisses?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; in Vacarisses, where almost everything is a house, the second is the more representative. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Vacarisses?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Vacarisses?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

What is the price of a complete renovation in Vacarisses?

We do not give loose figures because in a house the range is moved by the envelope, the roof and the services. Look at the 120 m² house example on this page and the price guides for a 120 m² house or a 200 m² detached house, and work out yours in the budget calculator. After the free visit we give you the fixed quote.

What is the price to renovate a whole flat in Vacarisses?

There are few flats in Vacarisses compared with houses, but if you have one, the 80 m² example on this page and the price guide for an 80 m² flat give you the reference. With the free technical visit we turn it into a fixed quote broken down item by item.

My house borders the forest: does it affect the renovation?

It can affect the surroundings more than the work. Law 5/2003 on forest-fire prevention in residential estates requires a protective perimeter strip of 25 metres to be kept. Before designing porches, firewood stores or extensions, we recommend checking with the Ajuntament how it affects your plot.

Do you renovate roofs and insulation in estate houses?

Yes. In a detached house the roof and the façade are the largest surfaces for heat loss and water getting in, so we check them on the visit. We do roofs, insulation, waterproofing and window replacement within the same job.

Do you handle the permit with Vacarisses’ Ajuntament?

Yes. We prepare the documents that apply to the work — works notification or a licence with a project if the structure or façade is touched — and file them with Vacarisses’ Ajuntament, and also the habitability certificate and the energy certificate.

Does it make sense to install aerothermal heating or solar panels in my house?

In a detached house with a roof and a plot, normally yes, but always after improving the insulation. On the visit we measure what to do first and quote it separately, so you can decide with data.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Vacarisses and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →