Restoring old houses in the Vallès Oriental: how the job changes between the urban axis of Granollers, the town centres and villas of the comarca and the masía of the Montseny.
In the Vallès Oriental there is no single old house; there are three cases that have little in common. The party-wall house on the urban axis of Granollers or Mollet, the villa or village house of the town centres and villa towns of La Garriga, Cardedeu or Caldes de Montbui, and the stone masía towards the Montseny. Before asking for a quote it pays to know which one you are in, because access, procedures and the part of the job that weighs most all change.
On the urban axis the house is usually among neighbours, with street and yard tight. You work with little storage space, and the challenge is the structure you cannot see: floors, roof and old drainage. In thermal-spa town centres like Caldes de Montbui, the narrow street adds to it, conditioning how material gets in, along with the damp of old walls. In La Garriga and Cardedeu many houses are summer villas with a glazed gallery, joinery and features that may be protected: there, what is distinctive is restored and the rest renewed.
The masía is another job. In Sant Celoni, Cànoves or Aiguafreda the stone house calls for reinforcement of walls and beams, insulation and heating designed for an inland climate. Here access along a track and the state of the roof weigh more than the kitchen. Restoring a village house and restoring a masía share a trade, but not the order of work or the timescales, which is why they are not quoted the same way.
On price per square metre: we do not give a figure for an old house, because two houses that look alike from outside differ greatly in roof, floors and services. What we do tell you is what drives it: the state of the structure, damp, access to the site and whether there are protected elements. After the technical visit you receive a quote fixed item by item, and you see how much goes on structure, how much on services and how much on finishes. If you already know your municipality, there is a page of its own for Granollers and Les Franqueses.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification / luxury | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Full renovation of the whole property, from functional to mid-range specification, VAT excluded.
One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².
The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.
More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.
Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.
These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.
The scope of a turnkey full renovation, and the things that genuinely sit outside it.
VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.
The comarca gives the context; each municipality has its own housing stock and its own council.
One team for the whole job, in Barcelona and across Catalonia.
Restoring an old house in the Vallès Oriental: doubts of someone who does not yet know whether theirs is urban or rural.
We do not give a figure per square metre, and be wary of anyone who does without seeing the house. A village house in Granollers, a villa in La Garriga and a masía in the Montseny have very different structures, access and procedures. What moves the price is the state of roof and floors, damp, access to the site and protected elements. After the technical visit the quote is fixed and itemised.
From the top down and from the outside in. First the diagnosis: roof, floors, walls and drainage. Then the structure is reinforced, damp is treated and only then are chases opened for new services, with their electrical certificate. Joinery, wall finishes and paint go last. What changes between an urban case and a masía is not the order, but which item weighs most and how you get to the site.
Start by finding out whether the structure holds. If roof and floors are sound, you can work mostly on the inside: layout, services and finishes. If there are damaged beams or walls with rising damp, that comes before the kitchen. In a town centre with a narrow street, like Caldes de Montbui, you also have to plan how material gets in and where it is stored.
It may. In La Garriga and Cardedeu there are summer villas with galleries and distinctive joinery, and in historic centres there is heritage review. We do not take it for granted in any house: it is checked before the façade or original features are touched, and what is distinctive is restored rather than replaced. It is a fact worth having before you decide the scope of the job.
Yes. In stone masías we work on reinforcing walls and beams, the roof, insulation and heating suited to the inland climate, keeping the character of the house. Access along a track and the distance from services affect timescales and logistics, and we assess them on the visit before closing the quote.
Renovating is renewing what already works: layout, kitchen, bathrooms, finishes. Restoring touches the skeleton and the skin of the building: roof, floors, walls, drainage and damp. In an old house you often need the second before the first. That is why the technical visit decides what is done now and what can wait.
A simple clue: if your house is a party-wall one and you reach it from a street, it is the urban or town-centre case. If it is a villa with a garden in La Garriga or Cardedeu, think villa restoration. If it is stone, detached and reached by a track, it is a masía. Many sit halfway, and then the technical visit is what clarifies what job you need.
Yes: Granollers, Mollet, La Garriga, Cardedeu, Caldes de Montbui, Sant Celoni, La Roca and Les Franqueses, among others. Granollers and Les Franqueses also have their own old-house restoration page, with the detail of each municipality. If yours is not on the list, contact us all the same.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.