Renovations · Les Franqueses del Vallès

Old house restoration in Les Franqueses del Vallès

Restoring old village houses and buildings in Corró d’Amunt, Corró d’Avall, Llerona and Marata: timber structure, large roofs, drainage and a quote fixed item by item.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Full home renovation

An old house in the countryside is restored differently from one in a town centre.

Les Franqueses is not one village, it is four: Corró d’Amunt, Corró d’Avall, Llerona and Marata. That changes the job more than it seems. A party-wall village house in Corró d’Avall is restored like an urban house; a detached house or a farm building in Llerona or Marata is another trade, with other problems. Before talking about finishes, we go and see how you get to the property, what the structure is made of and what is under the floor.

In old houses in the rural area the first thing is the timber structure: beams, round poles and ceramic or board infill that have spent decades with damp or woodworm. It is checked beam by beam. The sound ones are treated and stay; the damaged ones are replaced or reinforced with a steel section, and if the whole floor has lost its capacity it is rebuilt. The same goes for large roofs: before insulating, you have to know whether the truss can take the new weight.

Access rules the quote. On a narrow country track a crane lorry or a big concrete mixer cannot get in, and that turns into wheelbarrows, mini-dumpers and more labour days. And if the property has no mains sewer, drainage is solved with a septic tank or an individual treatment plant, which is designed and applied for before a single partition goes up. In a town centre none of this arises; here it is an item of its own, and we put it in writing from day one.

We also restore whole buildings: a house with its outbuildings, an old barn or stable that becomes a home, or a party-wall building divided into several dwellings. That brings in a project signed by a competent technician, a works licence and, on non-developable land, a longer procedure than on urban land. We run it, with a dedicated site manager who keeps you regularly informed of progress. The exact price per square metre is fixed after seeing the house, never over the phone.

Empty living room under construction, with a chandelier hanging from the ceiling, floor covered in debris and bags of rubble beside the wall
Prices

What a full renovation costs.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.

What a full renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution520 – 650 €/m²
High specification / luxuryPremium materials and high-end interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. A full renovation of an 80–100 m² home typically lands between 41,300 and 103,000 € depending on specification. What moves the number is not the paint. It is how many wet rooms you have, whether the layout changes, and whether the building can take it. A flat where the kitchen and bathroom stay put sits at the bottom of each band; moving both, plus opening a load-bearing wall with a calculated steel, sits at the top. VAT is 10% on a renovation of a home that has been built and occupied for at least two years, and 21% otherwise — we show it as its own line so you can check which applies to you.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by floor area.

Full renovation of the whole property, from functional to mid-range specification, VAT excluded.

Studio or one-bedUp to 60 m²31,400 – 63,000 €

One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².

Two-bed flat60 – 90 m²34,400 – 78,600 €

The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.

Three-bed flat90 – 120 m²43,300 – 111,800 €

More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.

Large flat or houseOver 120 m²From 61,100 €

Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.

These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.

No small print

What is included and what is not.

The scope of a turnkey full renovation, and the things that genuinely sit outside it.

✓ Included in the price

  • Strip-out, clearance, skips and skip permits
  • New water supply and waste runs throughout
  • New consumer unit, circuits and earthing, with electrical certificate
  • Extraction and ventilation to kitchen and bathrooms
  • New partitions and the agreed layout
  • Levelling, plastering and making good
  • Flooring throughout
  • Bathrooms: waterproofing, tiling, sanitaryware and brassware
  • Kitchen: units, worktop, sink, tap and extractor
  • Internal doors, skirting and fitted wardrobe carcasses
  • Two coats of paint throughout
  • Sockets, switches and light fittings
  • Permit filing and the submission to the residents’ association
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, unless listed in your quote
  • Loose furniture, blinds and decoration
  • Structural work — steels, slabs, underpinning — priced separately once calculated
  • Façade, roof and communal areas, which belong to the building, not the flat
  • Damp or concrete repair found during the strip-out
  • Air conditioning, unless listed in your quote
  • Council taxes and fees where they apply
  • Architect’s fees where a full project is legally required

VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.

The same work, elsewhere

Old house restoration in other areas

What you find inside an old house changes with the area and with the period it was built.

Common questions

Frequently asked questions

Restoring in Les Franqueses del Vallès: what the owners of old houses ask us.

How much does it cost per m² to renovate an old house in Les Franqueses del Vallès?

As a guide, a functional renovation runs between 580 and 740 €/m² and a mid-range one between 860 and 1,090 €/m², always excluding VAT and as a reference for housing: a village house with structure to be touched comes out above that. In an old house the figure is decided by the structure (beams, floor, roof) and by services that almost always have to be redone. In the rural area, access and drainage add to it. After the free visit we give you the price fixed item by item.

How is a village house renovated in Les Franqueses del Vallès?

It starts with a diagnosis: the state of walls, beams, roof, damp and services. Then what can be kept is separated from what has to be replaced. The usual run is to treat damp, reinforce or replace damaged timber, redo electrics and plumbing, insulate the roof and renew the kitchen and bathrooms. If the layout changes or the structure is touched, you need a technical project and a municipal licence.

Do you renovate village houses in Corró d’Amunt, Llerona and Marata?

Yes, and in Corró d’Avall too. Each village asks for something different: in the most rural ones, machinery access, the roof and drainage weigh most; in the more urban ones, party walls and the owners’ community. We see it on the visit, which is free, and the quote comes out fixed and in writing.

Do you restore whole buildings in Les Franqueses del Vallès?

Yes: houses with outbuildings, old barns or stables that become homes, and party-wall buildings with several dwellings. We start from a project signed by a competent technician and from the works licence. On non-developable land the procedure is longer and may require additional reports, which is why it is worth checking before you buy.

What is the difference between restoring an old house in the countryside and in a town centre?

Three things. Access: on a narrow track big machinery cannot get in and the job gets dearer. Drainage: with no sewer network you need a septic tank or a treatment plant. And scale: larger roofs and timber structures. In a town centre, party walls, yards and noise hours with the neighbours weigh more.

Can the original timber and stone of the house be kept?

Often yes, and it usually pays off. Sound beams are treated against woodworm and damp and left exposed. Stone is cleaned, repointed and, if there is rising damp, the base of the wall is drained. What we do not do is leave a doubtful beam to save money: if it does not meet the standard, it is reinforced or replaced, and we explain it with photographs.

How long does a full restoration of an old house take?

It depends on the scope. A house with a sound structure can take a few months; if floors or roof have to be rebuilt, more. On top of that comes the prior processing of the project and licence, which does not depend on us. At the visit we give you a realistic timescale and a phased programme, not a date promised in advance.

What about insulation and heating in a stone house?

You insulate where most is lost, which is the roof, and on the inside of the walls if you do not want to cover the stone. Heating is chosen to suit the house: aerothermal with underfloor heating or low-temperature radiators fit well. Good insulation allows smaller equipment and a lower bill, so it is decided before the quote is closed.

Free quote

Get your old house restoration quote in Les Franqueses del Vallès

Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →