Full renovation of a flat in the Eixample, Barcelona
Carrer de Provença, Barcelona · 70 m² · 2026

Project details
- Floor area
- 70 m²
- Property type
- Flat
- Duration
- 10 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 50,000–53,000 €
- What we did
- Demolition down to the brick · New electrical installation · New plumbing · Plasterboard false ceilings · PVC windows · New kitchen and bathroom · Air conditioning · Wood-effect porcelain floor
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A full renovation in earnest: the flat was stripped back to the brick and rebuilt entirely — services, ceilings, windows, a blue kitchen with a wooden worktop and a bathroom in beige stone.
This flat was taken back to its skeleton: walls hacked back to the brick, services torn out and the original ceiling bare. On that base the whole electrical system was set out again — the chases marked in red in the photos — with a new consumer unit, and the plumbing with new risers and an electric water heater.
The ceilings were rebuilt in plasterboard with a perimeter cove and recessed spotlights, the windows were replaced with double-glazed PVC and a wood-effect porcelain was laid throughout, levelled piece by piece with levelling spacers.
The kitchen is the signature of the home: blue lacquered fronts with a solid-wood worktop and breakfast bar and gold taps, facing the terrace. The bathroom went for beige stone with a textured relief in the shower area, a built-in niche, an extra-flat tray and black taps over a countertop basin on a wooden unit.
With air conditioning by split units, the doors lacquered and the wardrobes still to be assembled, the flat was ready to move into. From works to finish there are sixty photos: they are all here because the process is half the value.
A full renovation in the Eixample, as everywhere in Barcelona, is decided at the technical visit: we see the flat, tell you what is behind each wall, and the quote you sign is the one you pay.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.