Renovations · Tarragona

Kitchen renovations in Tarragona

Kitchens renovated in Part Alta buildings, expansion-district flats and Ponent blocks: new services where they are needed, light where there was none and a quote fixed item by item.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Kitchen renovation

Renovating the kitchen in Tarragona, from the Part Alta to Ponent.

Tarragona has no typical kitchen: it has three. That of the century-old building in the Part Alta, between stone walls and staircases that were earned the hard way; that of the expansion-district flat, with its gallery and its ceiling height; and that of the block in Ponent or Sant Pere i Sant Pau, built in the sixties with the smallest kitchen in the home. We renovate them all, each with its own recipe.

In the Part Alta the work starts with what you cannot see: original services that have to be redone in full, walls that do not allow careless chasing and a historic-quarter regulation that we respect and process. In return, few kitchens turn out like those here — old stone and timber with a new kitchen well placed have no rival.

In the expansion-district flats and the inland neighbourhoods the usual renovation is to open up: kitchen to living room or gallery, a continuous run, and the Mediterranean light doing the rest. And four streets from the port salt does not escape us: ironmongery and mechanisms that stand up to it and well-solved ventilation, because the air here is laden with sea.

The paperwork, sorted before starting: comunicació prèvia to the Ajuntament de Tarragona for the kitchen, a technical project if the structure is touched and the heritage procedure when the building is inside the historic quarter. You choose worktop and finishes; the forms are our business.

On the projects map you can see finished kitchens with their metres and price band, in case you want to compare yours before calling us.

The kitchen with a wooden island and herringbone parquet
What we find

The three problems we solve most in Tarragona kitchens.

Before choosing tiles you have to solve what lies beneath. This is what turns up again and again when kitchens are opened here.

Original services

Lead or iron plumbing and consumer units short of power, above all in the Part Alta and in the blocks of the ’60s. They are renewed in full with the kitchen open — doing it afterwards costs double — and left legalised with their certificate.

Salt and damp

Near the port and the Serrallo, anything metallic suffers: pitted hinges, runners that seize, rusted mechanisms. We fit treated ironmongery, finishes that do not absorb damp and extraction that really renews the air.

Closed, dark kitchens

The cupboard-kitchen of the Ponent block or the windowless back of an old-town building. The answer is almost always to open up — to the living room or the gallery — and compensate with lighting in layers: general, under-unit and worktop.

Week by week

Your Tarragona kitchen, week by week.

This is how a typical job of three and a half weeks is divided.

Week 0 — measuring and design

Free visit, measurement to the millimetre and a check of smoke extraction, walls and consumer unit. With that, a plan and a quote fixed item by item — and a firm start date when the units are ordered.

Week 1 — demolition and services

Protection, demolition, removal in sacks and the new services first: plumbing, drains and circuits. The noisiest week, notified to the community in advance.

Weeks 2 and 3 — finishing and fitting

Tiling or cladding, floor, ceiling and lighting, and the fitting of the units with the worktop templated. The kitchen goes from skeleton to kitchen in a matter of days.

Final week — finishing touches and handover

Appliances connected, sealants, paint touch-up and site clean. A walk-round with you point by point, a snagging list if there is one and a written guarantee at handover.

Prices

What a kitchen renovation costs.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.

What a kitchen renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution4,800 – 7,500 €
Design / high endPremium materials and high-end interior design13,300 – 19,500 €
Indicative prices · VAT not included. The kitchen is the room where the range is widest, because appliances, the worktop and the units can multiply the cost on an identical layout. Opening the kitchen into the living room typically adds 1,500 to 4,000 € depending on the wall and whether it carries load. We itemise all of it so you can choose where the money goes.
Calculator

What might your new kitchen cost?

Indicative estimate4,800 – 7,500 €Functional · Medium (8–12 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by kitchen size.

Indicative ranges for a full kitchen renovation, VAT excluded.

Small kitchenUp to 8 m²4,800 – 17,400 €

The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.

Medium kitchen8 – 14 m²5,000 – 18,600 €

The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.

Large kitchenOver 14 m²5,900 – 19,500 €

Island and dining space. At this size the design and the appliances set the price, not the square metres.

Opened into the living roomOpen-planFrom 15,000 €

The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.

In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.

No small print

What is included and what is not.

The scope of a turnkey kitchen renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old kitchen
  • New water supply, waste runs and extraction duct
  • Dedicated appliance circuits with electrical certificate
  • Splashback tiling or cladding, and the floor
  • Base and wall units and the worktop
  • Sink, tap and extractor hood
  • Task lighting and general lighting
  • Fitting and integration of appliances you supply
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, other than those itemised in your quote
  • Pans, crockery and small accessories
  • Opening the kitchen into the living room, unless itemised
  • Relocating the boiler or the gas installation, unless planned
  • Council taxes and fees where they apply
  • Loose furniture and decoration

VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.

In the same town

Other services in Tarragona

The same team and the same fixed quote, for the rest of the home in Tarragona.

The same work, elsewhere

Kitchen renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Kitchen renovations in Tarragona: the questions everyone arrives with.

How much does it cost to renovate a kitchen in Tarragona?

Between 4,800 and 7,500 € excluding VAT at functional specification, and 6,600 to 10,300 € at mid-range. The variable that weighs most in Tarragona is the condition of the services: where there is original plumbing and electrics it is worth renewing them with the kitchen open, and the quote — fixed and itemised — tells you so from day one.

My flat is in the Part Alta: can I renovate the kitchen?

Yes. Being inside the historic quarter, internal renovation is processed with more care — prior notification and, depending on what is touched, a heritage report — and the work respects old walls and floors. None of this prevents a modern kitchen: it only asks for a team that knows where it is treading.

Does sea salt really affect a kitchen?

It does, and it shows within a few years: pitted ironmongery, stained handles and appliances that age sooner. Near the port we fit hinges and runners with anti-corrosion treatment, avoid finishes that absorb damp and look after the ventilation. It is the difference between a kitchen that lasts eight years and one that lasts twenty.

Can the kitchen be opened to the living room in a Ponent block?

In most cases, yes: the partitions in these blocks are usually dividing walls. We check on the visit and, if a lintel is needed, it is calculated and processed with a project. In flats of 60-70 m² it is the renovation that gives back most space and most light per euro invested.

It is a second home on the coast: can you do the work out of season?

It is what we recommend: we plan the job between September and June, coordinate access with the community even if you are not there and send you regular progress updates with photos. You arrive in summer and the kitchen is ready, without having lived a single day with the dust.

What permit does Tarragona’s Ajuntament require?

To renew the kitchen without touching the structure, a comunicació prèvia, which we file and which does not delay the start. With a load-bearing partition knocked down or a listed building, a technical project and the corresponding procedure. We hand it all over done, with its fees clear in the quote.

How long does a kitchen renovation take?

Two weeks if it is a change of fronts and worktop; three or four if partitions are opened and services renewed. The programme comes in writing with the quote, and the rubble goes down in sacks with its permit for occupying the public highway — in the narrow streets of the old town as well.

Do you work outside Tarragona city?

Yes: we work across the whole area — Salou, Vila-seca, La Canonja, Constantí, Torredembarra, Altafulla and El Catllar — with the same free technical visit. If your kitchen is in a beach apartment, we also know how to deal with seasonal communities.

What guarantee do I have when the kitchen is finished?

A written guarantee on the work and the manufacturers’ own warranties for appliances and units, with their invoices in your name. If something moves in the first months — a hinge, a joint — we come and adjust it without argument.

Can you coordinate with my residents’ community?

Yes, and we prefer to: written notice before starting, agreed noise hours, lift use agreed if there is one and the entrance as it was every afternoon. An informed community is half a peaceful job — in the seasonal buildings of the coast too.

Do you fit small kitchens for rental apartments?

Yes, and with a criterion of our own: in a holiday or seasonal apartment, resilience and easy replacement come first — fronts that wipe clean in one pass, a forgiving worktop, honest-range appliances with quick spares. A pretty kitchen that survives a hundred tenants is worth more than a spectacular one that does not reach ten.

Who takes away the old kitchen and the rubble?

We do, with paperwork: we dismantle, separate what is reusable, and the rubble goes in sacks or a skip to an authorised handler with its certificate. If a unit or appliance is fit to donate, we set it aside and tell you. You do not carry a bag — it is included in the demolition item.

Free quote

Get your kitchen quote in Tarragona

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →