Restoring an old home in L’Hospitalet: block flats from the ’50s–’70s with worn-out services, structure checked and a quote item by item after the technical visit.
Let us be clear: there are almost no village houses left to restore in L’Hospitalet. What you have in hand, if you bought or inherited something old, is almost certainly a post-war block flat in Collblanc, La Torrassa, La Florida or Les Planes, put up in a hurry to house the migration of the 50s, 60s and 70s, in one of the most densely populated cities in Europe. Restoring here is not about restoring a façade: it is about giving a flat of 40 to 60 m² services and a layout that actually work again.
The first thing we look at is what you cannot see. The cast-iron or fibre-cement downpipes, which, if they are fibre cement, are removed by a firm on the asbestos-risk register (RERA). The consumer unit with no earth. And the structure: some blocks of the 60s and 70s used high-alumina cement (“aluminosis”), so at the visit we check floors and beams and, if there are symptoms, we tell you before quoting, with the checks and reinforcement that follow. We do not give figures for how many buildings have it: it is checked in yours.
Then comes space. A block flat of that period tends to have a long corridor, a closed kitchen, a bathroom with a bath and bedrooms that are little more than a bed. At 40 or 60 m², the re-planning is half the value of the job: opening the kitchen to the living room if the wall allows it, turning part of the corridor into wardrobes, swapping the bath for a flush shower. If the partition is load-bearing, there is a lintel and a project. In the same job, the single-glazed aluminium windows are replaced with thermally broken frames and the façade wall is insulated on the inside.
We take care of the paperwork. If the renovation is interior and does not touch the structure, L’Hospitalet’s Ajuntament asks for a prior works notification: it is filed, the fee is paid and work starts. If you touch the structure, the façade or the use, there is a licence with a technical project and you have to count in weeks. On narrow streets the skip carries its own permit to occupy the public highway, and with the community we agree noise hours and lift use before the first day. The price is fixed item by item after seeing your flat, not before.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification / luxury | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Full renovation of the whole property, from functional to mid-range specification, VAT excluded.
One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².
The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.
More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.
Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.
These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.
The scope of a turnkey full renovation, and the things that genuinely sit outside it.
VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.
The same team and the same fixed quote, for the rest of the home in L’Hospitalet.
What you find inside an old house changes with the area and with the period it was built.
One team for the whole job, in Barcelona and across Catalonia.
Restoring an old flat in L’Hospitalet: what you really ask us.
As a guide, a full restoration in L’Hospitalet runs from 520 to 650 euros per square metre at functional standard and from 750 to 940 euros per square metre at mid-range, excluding VAT. It is not an offer: in a flat from the ’50s–’70s what moves the figure is what is hidden, meaning downpipes, electrics and the state of the floors. That is why the firm quote, fixed item by item, comes after the technical visit, which is free.
In a post-war block flat, normally: controlled demolition, new downpipes and plumbing, electrics with a consumer unit and earth, the electrical certificate, a new layout, windows, internal insulation, tiling, floors, interior joinery and paint. What does not come in until it has been seen is the structural work: if there are symptoms at the visit, it is quoted separately and with its checks. And the paperwork with the Ajuntament is included.
First the technical visit, where we check downpipes, electrics, damp and floors. Then a quote item by item and, where relevant, prior notification or a licence. On site the order is the usual one: demolition, services, building work, insulation and windows, wall and floor finishes and the finishing touches. A 60 m² flat is a matter of several weeks, not several days, and surprises are avoided by looking before chopping, not after.
It can happen in buildings of that period, which is why we check it on the visit without taking it for granted. We look at the state of floors and beams and, when there are symptoms, a competent technician is called in for the study and the reinforcement required. If it affects common elements, it has to be discussed with the community. We will not give you a prevalence figure for the city: it depends on the building, and it is checked in yours.
Almost always, if the structure is sound. With little floor area, every centimetre counts: a kitchen open to the living room, a bathroom with a flush shower, wardrobes instead of a corridor and new electrics change the flat more than any expensive finish. What we do not recommend is paying for top-range finishes on top of services that will have to be opened up in five years. If your case does not pay off, we tell you at the visit.
For an interior renovation that does not touch the structure, prior works notification is enough; we file it, and it lets you start without waiting for a resolution. If it affects the structure or the façade, or changes the use, you need a licence with a technical project, and you should allow weeks for the processing. The skip on the public highway has its own permit, and we handle that too.
We do not recommend it. In a full renovation of a small flat there are weeks with no water or services, dust in every room and constant noise, and it pays to spend them elsewhere. In partial renovations, a bathroom or a kitchen, you can stay by phasing the work and protecting the rest. We tell you plainly at the visit, before you sign anything.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.