Site-built swimming pool and terrace in Mira-sol, Sant Cugat del Vallès
Carrer de Mira-sol, Sant Cugat del Vallès · 35 m² · 2026

Project details
- Floor area
- 35 m²
- Property type
- House
- Duration
- 10 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 32,000 €
- What we did
- Site-built pool shell · Waterproofing · Site-built steps · Stone coping · Perimeter terrace
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A site-built pool with integrated steps, waterproofed and capped with pale stone, with its perimeter terrace.
A site-built pool is decided at two moments: when the shell is waterproofed and when the coping is finished. The rest can be seen; this cannot, and it is what decides whether the shell holds.
The shell has its own integrated site-built steps instead of a prefabricated set, and the coping was done in pale stone, which does not scorch in the sun and does not slip when wet. The perimeter terrace was levelled so that the water runs off outwards, never towards the shell.
A swimming pool in Mira-sol planned for decades of use, not for a single season.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.