Full renovation of a flat in Gràcia, Barcelona
Carrer Gran de Gràcia, Barcelona · 80 m² · 2026

Project details
- Floor area
- 80 m²
- Property type
- Flat
- Duration
- 10 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 33,000–36,000 €
- What we did
- Full renovation · Demolition and removal · Electrics · Plumbing · Recovered Catalan vault · Skimming of walls and ceilings · Interior painting
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A full renovation of a flat in Gràcia: one room stripped back to the Catalan vault with new services, and the rest of the home skimmed and painted, changing palette.
It was a full renovation, done in phases with the home occupied. The Catalan-vault room was stripped back to the brick: the electrical installation was redone, the water supplies were left exposed until closing up, the window was replaced and the ceiling was recovered, leaving the vault on show.
In the rest of the home the bulk of the work was finishes. Ceilings and walls were skimmed —there were cracks and quite a few service trial holes to cover— and then everything was painted in a change of palette, because it came from white and the client wanted colour.
We went room by room instead of opening everything at once, since there was furniture inside and it was more practical to give each room back as it was finished. Most of the hours in a phase like this do not go on painting, they go on protecting: we covered the wooden doors and the glazed doors pane by pane, masked frames and skirting boards and taped over every socket and switch.
In the bedrooms and the living room we went for taupe and dark grey on the main panels, with a lighter tone on the rest so the rooms did not close in. One has green on a single wall, and it is the only strong colour in the home. The vault called for more hand work and more time between coats because brick absorbs differently, something that turns up in many old flats in Gràcia and is worth saying before giving a price.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.