In progress

Façade restoration in El Clot, Barcelona

Carrer del Clot, Barcelona · 800 m² · 2026

Façade with scaffolding and netting during the restoration

Project details

Floor area
800 m²
Property type
Commercial unit
Duration
12 weeks
Year
2026
Status
In progress
Budget
147,000–155,000 €
What we did
Scaffolding erection · Protective netting · Restoration of the main façade and courtyard

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

The restoration of the façade of a building between party walls, with scaffolding and netting erected on the main façade and in the inner courtyard.

A façade is restored from the scaffold, and the scaffold is the first serious decision of the job: how it is put up, where the neighbours get through and how long it will stay up.

Here it was put up over the full height of the main façade and also in the inner courtyard — which is where loose pieces that nobody sees from the street tend to turn up — with protective netting so that work can go on without anything falling onto the pavement.

The work is under way. The full before and after will go on this page once the scaffolding comes down.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.