Completed

Renovation of a duplex penthouse with a terrace in the Congrés, Barcelona

Carrer de Biscaia, Barcelona · 105 m² · 2026

The penthouse terrace, with herringbone ceramic paving and the original lattice railing

Project details

Floor area
105 m²
Property type
Penthouse
Duration
16 weeks
Year
2026
Status
Completed
Budget
48,000–52,500 €
What we did
Two floors joined by a spiral staircase · Terrace with herringbone ceramic paving · Kitchen open to the living room · Three bathrooms with a black-framed screen · Oak laminate and lacquered doors throughout the home

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A duplex penthouse renovated throughout: two floors joined by a wrought-iron spiral staircase, three bathrooms with the same black-framed screen and a herringbone terrace that doubles the living room.

In a duplex penthouse two things rule over the rest of the project: the staircase and the terrace. The staircase because it takes up room on both floors and decides where you can walk; the terrace because it is half the reason for buying a penthouse.

The spiral staircase in wrought iron with wooden treads was kept and built in: it is the piece with the most character in the home, and replacing it with a straight flight would have cost usable metres on both floors. The circulation was reorganised around it so that the foot and the top of the stair fall on landings, not in the middle of a room.

Downstairs, the kitchen was opened to the living room and leads straight out to the terrace, which was paved in herringbone ceramic while respecting the building’s original lattice railing. Upstairs, under the roof, are the rooms with the sloping ceiling and a bathroom of their own. The three bathrooms were done on the same principle — backlit round mirror, black-framed screen, wooden unit — so that the home reads as a whole.

A penthouse renovation in the Congrés i els Indians in which the effort went into putting two small floors in order, not into changing style from room to room.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.