Completed

Luxury flat with herringbone parquet and travertine in Santa Coloma

Carrer Major, Santa Coloma de Gramenet · 120 m² · 2026

The living room with the ceiling moulding and the gallery at the back

Project details

Floor area
120 m²
Property type
Flat
Duration
16 weeks
Year
2026
Status
Completed
Budget
111,500–122,500 €
What we did
Herringbone oak parquet · Mouldings and Catalan vaults recovered · Gallery and windows in black workshop-style framing · Travertine and microcement bathrooms · Kitchen with a timber island · Made-to-measure walk-in wardrobe and wardrobes · Staircase with a glass balustrade

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

The main floor played in another league: herringbone oak parquet, a black workshop-style gallery, travertine and microcement bathrooms and a kitchen with an island.

There are renovations that raise the level of a flat and renovations that change its category. This is one of the second kind: wall-to-wall herringbone oak parquet, mouldings recovered in the ceilings and a glazed gallery with black workshop-style framing that turns the back of the living room into the place where everyone wants to sit.

The bathrooms set the tone — travertine with a black basin on wood and round wall lights in one, microcement with recessed black taps in the other — and the kitchen with a timber island works facing the dining room. The made-to-measure walk-in wardrobe beside the window with small panes and the staircase with a glass balustrade under skylights complete a floor without a single corner left unthought.

A luxury renovation in the centre of Santa Coloma that holds its own against any main-floor flat in the Eixample — and we say so with the photos in front of us.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →