Completed

Plasterboard arches and false ceilings in Molins de Rei

Carrer Major, Molins de Rei · 45 m² · 2026

Plasterboard arch with recessed niches, already skimmed and painted

Project details

Floor area
45 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
8,500–9,000 €
What we did
Plasterboard arches with recessed niches · Double-level false ceilings with a curved band · Indirect light and recessed spotlights · Skim coat and a finish ready to paint

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Arches and double-level false ceilings done in plasterboard, with the niches recessed into the partition itself and the indirect light inside the curved band.

A curve in plasterboard is not bought: it is made. The board is dampened and bent over a frame built beforehand, with the profiles cut and folded every few centimetres, and that frame decides whether the curve comes out clean or in sections.

In arches the critical point is where the curve meets the plane: if the profile does not end up flush with the face of the partition, the joint shows as soon as it is painted and no skim coat can fix it. It is checked with a straightedge before the second face is closed.

The niches are recessed into the partition itself, not added on: the opening is left in the frame from the start, with its reinforcement, so that the back is plumb and the edge does not look fattened.

In double-level ceilings the curved band hides the indirect light, so its height and its overhang are set out with the light fitting in hand, not afterwards.

Plasterboard work in Molins de Rei.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.