Completed

Bathrooms and kitchens renovated in Barcelona

Carrer de Balmes, Barcelona · 45 m² · 2026

Bathroom in marble-effect porcelain with a bath and a wall-hung toilet

Project details

Floor area
45 m²
Property type
Flat
Duration
8 weeks
Year
2026
Status
Completed
Budget
19,000–21,000 €
What we did
Complete bathrooms · Kitchens with a ceramic splashback · Tiling: hexagonal, metro and mosaic · Shower trays and baths · Ceramic and laminate floors

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A collection of renovated bathrooms and kitchens: from the pastel hexagonal splashback to the black cloakroom with a basin on wood, with their stages of work included.

These photos gather several renovated bathrooms and kitchens, each with its own character. There is a kitchen with a splashback of pastel hexagons and a black-and-white hexagonal floor; a rustic-feel bathroom with a patchwork border; another with a corner bath and floral tiles; a small cloakroom played all in black with a basin on a wooden slab; and a bathroom in marble-effect porcelain with a wall-hung toilet.

Among the finishes you will find the stages that are not normally shown: tiling half laid with the grout still fresh, furniture protected with plastic, the first course of a floor. It is the part of the trade that holds up the pretty photo.

If you are thinking about your bathroom or your kitchen, there are plenty of ideas here: different materials, different budgets and the same level of finish. Whichever is closest to what you have in mind is where we start talking.

If you are turning over a bathroom renovation in Barcelona or a new kitchen, any of these finishes can be adapted to your flat: show us yours and we will advise you.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →