In progress

Underfloor heating installation in a flat in El Putxet, Barcelona

Carrer de Vallirana, Barcelona · 70 m² · 2026

Underfloor heating laid in the room, with the building’s arches beyond

Project details

Floor area
70 m²
Property type
Flat
Duration
7 weeks
Year
2026
Status
In progress
Budget
16,400 €
What we did
Water-based underfloor heating · Circuits for each room · Preparation for the screed

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

The underfloor heating of a flat in an old building, photographed just before being covered: spiral circuits in each room under the original arches.

Underfloor heating is the part of a renovation that nobody sees again once the screed is down, which is why it was documented first. In this flat in El Putxet, water circuits were laid in every room, bathrooms included, with the original arches of the building as witnesses.

Each room has its own circuit, laid in a spiral that spreads the heat without cold spots. Before the screed is poured, the installation is pressure-tested, as in any well-made underfloor heating.

The job is still under way. When the flat is finished, these photos will be what lies beneath the floor.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.