Completed

Hydraulic-tile and porcelain floors in El Besòs, Barcelona

Rambla de Prim, Barcelona · 12 m² · 2026

Hydraulic-effect flooring during laying, with spacers and wedges

Project details

Floor area
12 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
Completed
Budget
6,800 €
What we did
Hydraulic-effect flooring · Layout with contrast inserts on the diagonal · Setting out from the centre line and spreading the cuts · Laying with spacers and a levelling system

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Patterned floors — hydraulic, ornamental and a layout with inserts on the diagonal — where the setting-out matters more than the tile.

A patterned floor does not allow the method of starting in one corner and seeing what happens. The pattern repeats every few pieces, so the starting point decides how the whole room turns out.

In all three cases the setting-out was done from the centre line: the centre of the space is marked, a dry check confirms that the pattern ends the same way against the two opposite walls, and laying works outwards from there. The cut pieces are spread equally around the perimeter, where the skirting covers them, instead of piling up on one side.

The layout with contrast inserts adds one more condition: the four inserts have to meet at the corner where four pieces come together. A couple of millimetres of drift is enough for the insert to look off-centre, and from then on the error is carried across the whole floor.

Ceramic floors in El Besòs, set out before starting.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.