Black kitchen renovation with a wooden worktop in the Vila Olímpica, Barcelona
Carrer de Ramon Turró, Barcelona · 16 m² · 2026

Project details
- Floor area
- 16 m²
- Property type
- Flat
- Duration
- 11 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 28,000–31,500 €
- What we did
- Kitchen open to the living room · Island with a gas hob · Solid-wood worktop · Hood built into the ceiling · LED lighting in the plinth and under the units · Oak floor
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A black kitchen open to the living room, with an island, a solid-wood worktop and a hood built into the ceiling so as not to cut the view.
The brief was to open the kitchen to the living room without the kitchen swallowing the living room. The answer was colour: matt black fronts that read as one more piece of furniture, and a solid-wood worktop that breaks the black right where the hands rest.
The island holds the gas hob and the hood is built into the ceiling, not hung: nothing interrupts the view from one end of the space to the other. The LED light runs along the plinth and under the wall units, so at night the kitchen lights itself without switching on the ceiling light.
The living room keeps its masonry fireplace and the oak floor runs through both areas, which is what makes them read as a single room and not as two connected rooms.
A kitchen renovation in the Vila Olímpica where the hard part was not the cabinetry, but deciding what would NOT be seen.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.








