Stone and decorative brick cladding in Sant Feliu de Llobregat
Carrer Falguera, Sant Feliu de Llobregat · 4 m² · 2026

Project details
- Floor area
- 4 m²
- Property type
- Flat
- Duration
- 1 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 4,500 €
- What we did
- Stone slips on reveals and openings · Staggered edge finish · with no trim profile · Staggered brick slips · Grouting and final clean
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Door reveals and wall panels clad in stone slips, with the edge left staggered instead of finished in a straight line.
Stone slips are almost always used on small panels — a door reveal, a feature wall in the entrance hall — and there the problem is not the surface but how it ends. An edge cut to a ruler immediately gives away that it is a one-centimetre cladding stuck to a partition wall.
That is why the edge is left staggered: the pieces step along following their own shape, so that the cladding fades out irregularly against the plaster. It costs more because each piece on the edge has to be chosen, not just laid.
On the reveals there is one more condition: the stone takes up thickness, so the opening is measured with the planned cladding from the start, or the door stops closing.
Decorative cladding work in Sant Feliu de Llobregat.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.