Completed

Luxury flat with a stone wall and a vertical garden in Les Tres Torres, Barcelona

Carrer dels Vergós, Barcelona · 200 m² · 2024

Freestanding bath on a bed of white pebbles in front of a vertical garden with a glass lamp

Project video

Project details

Floor area
200 m²
Property type
Flat
Duration
18 weeks
Year
2024
Status
Completed
Budget
143,500–157,500 €
What we did
Bathroom with a vertical garden and a freestanding bath · Natural stone walls · Billiards room with a wooden bar counter · Herringbone wood floor · Dark made-to-measure joinery · Track lighting and designer lamps

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A flat in the upper part of the city with a character of its own: a bathroom with a vertical garden and a freestanding bath on pebbles, a bedroom with a stone wall and a billiards room with an oak bar.

Some homes are renovated and some are designed anew. This flat in Les Tres Torres is one of the second kind: every room has a material that rules — stone, wood or plants — and the job was getting each one to work technically, not just in the photo.

The main bathroom is the piece you remember: a full-wall vertical garden framed by sculpted rock, with a freestanding bath on a bed of white pebbles and a glass lamp above it. Behind that picture there is waterproofing and ventilation worked out so that plants and steam can live together. The basin is a cantilevered slab of grey stone with a mirror in a wavy frame, and the shower is a wall of stone strips behind glass.

In the bedroom, a natural stone wall from side to side serves as the headboard, with conical lamps hanging in front; in the living room there is a herringbone wood floor, a wood-clad pillar and a brass-and-glass lamp. The billiards room has dark beams, grey brick, an oak bar unit and a solid, made-to-measure bar counter.

In this luxury renovation in Les Tres Torres the hard part was not choosing the materials, but making them live together: stone, wood and water in the same home, with the same level of finish in every room.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →