Completed

New floor and paint for a flat in Sant Martí, Barcelona

Carrer de Bilbao, Barcelona · 70 m² · 2026

Laminate flooring freshly laid in the corridor, with the paint tins still inside

Project details

Floor area
70 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
Completed
Budget
13,000–14,000 €
What we did
Removal of the old parquet · Levelling the base · Laminate flooring · Skirting boards · Painting

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Out with the seventies block parquet, in with a light laminate flooring and new skirting, and every wall painted in a soft grey.

The flat had the classic block parquet glued to the screed, lifted in places and beyond repair. It was removed entirely, the areas where it had come loose were repaired and the base was levelled before anything went on top — the step almost nobody sees but which decides whether the new floor creaks or not.

On the clean base went an impact-reducing underlay and a light-oak laminate floor, run from room to corridor without changing direction, with new white skirting to match the doors.

With the floor settled, the whole flat was painted in a light grey that acts as a neutral background and lets the floor lead. Two weeks of works, the flat empty, and the feeling on walking in is of a different flat.

A floor-and-paint renovation like this is the quickest way to transform a home in Sant Martí, and anywhere in Barcelona, without taking on major works. If yours calls for something similar, tell us about it.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.