Renovation under way of a 1970s flat in El Prat
Carrer de Ferran Puig, El Prat de Llobregat · 100 m² · 2026

Project details
- Floor area
- 100 m²
- Property type
- Flat
- Duration
- 10 weeks
- Year
- 2026
- Status
- In progress
- Budget
- 46,600–51,200 €
- What we did
- New windows and exterior joinery · Thermal insulation · Air conditioning · New kitchen · Renovation of the bathrooms · Floors and paint
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A seventies flat with a terrace and good bones, documented just as it was before starting: gresite tile, granite and windows from another era.
This flat is pure seventies, and we say so fondly: pillars clad in gresite (small mosaic tiles), a kitchen with a granite worktop and a white oven, exposed radiators and huge windows onto a terrace with the kind of view they no longer build.
The bones are good — a sound structure, generous rooms, light everywhere — and the plan is the one these flats ask for: energy efficiency first (windows, insulation, climate control), then an update of the kitchen, bathrooms and finishes that does not take the character away from the terrace.
The works are just starting; these photos are the documented starting state. A flat renovation in El Prat that we will show in full, from the gresite to the result.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.





