Completed

Full renovation of a flat with Catalan vaults in the Barri Gòtic, Barcelona

Carrer dels Banys Nous, Barcelona · 80 m² · 2026

Living room with restored Catalan vaults and a cornice of indirect light

Project details

Floor area
80 m²
Property type
Flat
Duration
16 weeks
Year
2026
Status
Completed
Budget
59,500–65,000 €
What we did
Restoration of Catalan vaults · Exposed brick arch · Open kitchen · Indirect perimeter lighting · Oak flooring · Bathroom with a basin on wood

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A flat in an old building where the Catalan vaults and the brick arch were recovered instead of being covered up, with an open kitchen and indirect perimeter lighting.

Under the false ceiling of this flat was what there usually is in the Gòtic and almost nobody looks at: Catalan vaults and a brick arch spanning the width of the room. The starting decision was to leave them in view and build the rest of the renovation around them.

The vaults were repaired and plastered, and the arch was cleaned back to the brick. To light them without hanging anything from them, the light sits in a perimeter cove that washes the ceiling — the cornice acts as the light fitting and the vaults can be seen whole.

The kitchen was opened to the living room under the segmental arch, in beige with a light worktop and an oven column, and the floor was unified in oak. In the bathroom, a round countertop basin on a solid pine board: real wood, not laminate.

This full renovation in the Barri Gòtic gains floor area without knocking down anything essential, and shows the old building instead of disguising it.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.