Walls with decorative brick in Porta, Barcelona
Passeig de Verdum, Barcelona · 8 m² · 2026

Project details
- Floor area
- 8 m²
- Property type
- Flat
- Duration
- 1 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 2,700 €
- What we did
- Decorative brick slips · white and dark · Laid with staggered joints and recessed pointing · Edge finishing at corners and openings · Grouting and final treatment
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Panels of brick slips, in white and in dark tones, laid with staggered joints, recessed pointing and the edges finished at the corners.
Brick slip is an honest cladding as long as it does not try to hide that it is one. What gives it away is not the material: it is the edges. As soon as a corner shows the real thickness of the piece, the whole panel reads like a skin stuck onto the wall.
That is why corners are done with edge pieces and the arrivals at openings are finished with a mitre, so that the brick seems to have depth. The joint is recessed, not flush, because a brick with a flush joint loses the shadow that makes it look like brick.
The setting out is the usual one for brickwork: laid with staggered joints, the courses bonded, and taking care that two cut pieces never line up vertically. A panel with aligned joints looks fake even if the material is good.
This is decorative cladding in Nou Barris, with the finishing details done on site.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.