In progress

Underfloor heating in a house under construction in Matadepera

Carrer de Sant Joan, Matadepera · 23 m² · 2025

Spiral underfloor heating circuit over the base

Project details

Floor area
23 m²
Property type
House
Duration
10 weeks
Year
2025
Status
In progress
Budget
21,300–22,400 €
What we did
Water-based underfloor heating · Manifolds with a mixing unit · Services distribution

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A house in the middle of construction documented at the services stage: spiral underfloor heating, manifolds with a mixing unit and the pipe layout before closing up.

In a new house, the heating is decided before the finishes. On this job in Matadepera water-based underfloor heating was chosen, with spiral circuits — the layout that spreads the heat best — over the prepared base.

The manifolds, with a mixing unit, pump and flow meters, were mounted on boards between walls not yet lined, and the circuits for each room leave from them. The pipe layout and the outdoor trenches were done before closing up.

The house is under construction; these photos are the technical skeleton that nobody will see afterwards.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.