Renovation of a loft with exposed brick in Poblenou, Barcelona
Carrer de Pujades, Barcelona · 110 m² · 2024

Project details
- Floor area
- 110 m²
- Property type
- Flat
- Duration
- 16 weeks
- Year
- 2024
- Status
- Completed
- Budget
- 68,500–71,000 €
- What we did
- Full renovation of the loft · Reclaimed exposed brick · Ceiling with a concrete finish · Steel and glass partitions · Oak kitchen · Two industrial-style bathrooms · Made-to-measure dressing room
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
An industrial-style loft done well: reclaimed exposed brick, a concrete ceiling, steel-and-glass partitions, an oak kitchen and bathrooms with concrete basins.
Poblenou is the neighbourhood of lofts, and this one had all the starting material: brick walls, high ceilings and factory light. The renovation set out not to disguise it — the brick was cleaned and left exposed, the ceiling was given a concrete finish and the air-conditioning and lighting installations run on the surface, neatly laid out, as part of the design.
To separate without closing off, workshop-style steel-and-glass partitions stand between the living room and the bedroom and between the kitchen and the dining room. The kitchen is in oak with grey wall units and a marble-effect porcelain splashback, with a double sink, a waste disposal unit and a column of ovens. In the dining room, a walnut table under a bulb lamp.
The two bathrooms follow the same idea: concrete basins on solid wood and steel, a shower with a wall of stone strips and a black screen, and a cloakroom with iridescent gresite under exposed ducts. The dressing room, in oak, was made to measure along the hallway.
A loft renovation in Poblenou where the industrial style is not a pose: every exposed duct is there because it has to be, and well placed.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.