Interior renovation with wall murals in El Born, Barcelona

Carrer de la Princesa, Barcelona · 65 m² · 2026

The finished corridor in grey with the glazed door at the end

Project details

Floor area
65 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
9,500–11,500 €
What we did
Plastering of walls · Painting · Wall mural · Lacquered doors · Joinery finishing

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Plastered and painted walls, lacquered doors and two wall murals — a skyline and a forest — that turn the corridor and the bedroom into something else.

The brief was to renew the interior of the flat without heavy building work: walls, doors and an idea from the client that gave a bit of vertigo — papering the corridor with a New York skyline mural and the bedroom with a forest in the mist.

First the boring part, which is what holds up the beautiful: plastering and sanding the panels that arrived battered, covering chases and trial holes, and painting the passageways in a neutral grey. The doors were lacquered and the joinery finished.

The murals went on last, matching whole panels so the picture is not cut at any joint — on a mural of buildings, every millimetre of drift shows. The corridor, which was the dullest part of the flat, is now the first thing the owner shows off.

A good paint and wall-mural job changes a flat in El Born, and in any neighbourhood of Barcelona, without touching a partition. If yours needs that kind of facelift, tell us about it.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.