Completed

Bathroom renovation in Sants, Barcelona

Carrer de Sants, Barcelona · 4 m² · 2026

Finished shower wall, grey porcelain with a textured strip

Project details

Floor area
4 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
Completed
Budget
12,000–13,000 €
What we did
Bathroom renovation · Demolition · Built-in shower base · Tiling · Sanitaryware and screen

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A white-tiled bathroom with glass blocks, turned into a current one with a built-in shower, screen and grey textured tile.

The bathroom came from another era: white grid tiles, a glass-block screen and a dark, narrow shower area. The whole shower front, glass blocks included, was demolished and a new built-in shower base was raised, with its fall and its drain properly placed from the start.

Instead of tiling up to the ceiling in a single material, a stone-look grey porcelain was combined with a textured strip that marks the wet zone. The rest was what you cannot see but which counts: new plumbing in the shower, a new toilet and a glass screen on a track instead of the curtain.

The work protected what stayed — the door and the window lined with kraft paper throughout — and the result is a bathroom that cleans in half the time and looks a good deal bigger without a wall having been moved.

Thinking of a bathroom renovation in Sants or elsewhere in Barcelona? Show us your bathroom as it is and we will tell you what can be done and for how much, with a fixed quote.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →