High-end full renovation in La Bonanova, Barcelona
Passeig de la Bonanova, Barcelona · 98 m² · 2025

Project details
- Floor area
- 98 m²
- Property type
- Flat
- Duration
- 22 weeks
- Year
- 2025
- Status
- Completed
- Budget
- 89,000–93,500 €
- What we did
- Full renovation · Polished marble floor · Large-format stone wall · Kitchen with an island and a column of ovens · Made-to-measure wardrobes and walk-in wardrobe · Three bathrooms · Indirect lighting
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A large flat in La Bonanova rebuilt throughout: white marble underfoot, a dark stone wall in the living room, a grey kitchen with an island and made-to-measure wardrobes from floor to ceiling.
This flat in La Bonanova was photographed at handover: the furniture still wrapped, the lamps covered in plastic and the marble floor freshly polished. It is the best moment to show a full renovation, because everything you see is the work itself, not decoration.
The floor is polished white marble from end to end, hallways included, and the living room is organised around a large-format dark stone wall with the television recessed into it. The ceilings have a moulding with indirect light and the brass lamps hang over the bar counter, next to the large windows.
The kitchen is in grey with a dark stone worktop, an island and a column of high-end ovens; the boiler is hidden in a cupboard above them. In the bedrooms there are black balcony doors, vertical radiators and made-to-measure floor-to-ceiling wardrobes — one with the television built in, another with LED light at the plinth — plus a complete walk-in wardrobe.
Three bathrooms in marble-effect porcelain tile and mosaic, with a built-in shower and bench, a built-in bath and a column towel radiator in midnight blue, plus a utility room of its own. In this full renovation in La Bonanova every door sits flush and every wardrobe reaches the ceiling.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.