Full renovation of a flat in the Poble-sec, Barcelona
Carrer de Blai, Barcelona · 72 m² · 2026

Project details
- Floor area
- 72 m²
- Property type
- Flat
- Duration
- 12 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 65,000–68,500 €
- What we did
- Full renovation · Vaulted ceiling and exposed brick recovered · Open kitchen · Made-to-measure wardrobes · New windows and exterior joinery · Two bathrooms · Air conditioning by split units
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A flat in the Poble-sec renovated throughout, with the vaulted ceiling and the exposed brick recovered, an open kitchen and made-to-measure wardrobes.
Under the false ceiling, the Catalan vault and a brick wall appeared that had been covered up for decades. They were cleaned and left exposed: it is what sets this flat apart from any other on the same staircase.
The kitchen was opened to the dining room, the wardrobes were made to measure from floor to ceiling — in a flat of 85 m² storage decides whether it is comfortable to live in — and the laminate runs through the whole flat, with white lacquered doors.
The windows and exterior joinery were replaced, air-conditioning splits were installed and the two bathrooms were redone: one with a round mirror and a wall-hung basin, the other with a shower with a black-framed screen.
A full renovation in the Poble-sec that makes use of what the building already had instead of starting from scratch.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.